In the High Court of the Republic of Singapore
[1978] SGHC 54
SUIT NO 3386 OF 1976
Between
grounds of decision

This judgment is subject to final editorial corrections approved by the court and/or redaction pursuant to the publisher’s duty in compliance with the law, for publication in LawNet and/or the Singapore Law Reports.
Melodies Ltd v Wong Peng Kin & Ors
[1978] SGHC 54
SUIT NO 3386 OF 1976
Chua F A J
23 October 1978
1 Cur Adv Vult
2 The plaintiffs are the owners of the land and premises situated at Pasir Panjang Road and Pasir Panjang Hill on which the plaintiffs have erected four blocks of flats (the Estate). The defendants are respectively the lessees for the term of 999,999 years of the flat units described in the schedule of particulars annexed to the amended statement of claim.
3 The plaintiffs claim from the defendants a pro-rata contribution of the expenditures incurred by them, under cl 4(c) of the leases, plus 10% under cl 2(f) of the leases, and alternatively under cl 2(b) of the leases. In addition the plaintiffs claim against a number of the defendants miscellaneous sums due under the leases and rental, the particulars of which are set out in para 12 of the amended statement of claim (referred to as claim B in the schedule of particulars in the amended statement of claim).
4 The defendants say that they are not liable to contribute to the alleged expenditures on a pro-rata or any other basis under the terms of the leases and that if they are so liable the expenses are excessive and/or unreasonable. With regard to claim B the defendants admit liability but they dispute that the plaintiffs are entitled to raise the rental from $60 per annum to $180 per annum effective from 1 April 1975.
5 The short facts are these. Sometime early in December 1969, due to heavy rain for a few days, the drain and retaining wall by the side of flat No 43D Pasir Panjang Hill collapsed. The plaintiffs consulted their architects. On 15 December 1969, the plaintiffs wrote to the defendants informing them of this fact and stating that measures had to be taken immediately to protect the property in the Estate and suggesting that a new retaining wall be erected and that that would cost about $32,000 and requesting the contribution of $1,000 immediately from each of the defendants. The plaintiffs received very poor response from the defendants and they were unable to proceed with the works. In February 1970, a reminder was sent to the defendants. In June 1970, the plaintiffs received a notice under s 51(1) of the Environmental Public Health Act 1968, from the Chief Building Surveyor calling upon them to abate a nuisance on the estate and requiring the plaintiffs:
(i) to erect proper and sufficient shoring to prevent landslides and collapse of retaining wall;
(ii) to repair and reconstruct the defective surface drains at front of premises and near the car park;
(iii) to submit building plans through a registered architect for the reconstruction and/or erection of a proper reinforced concrete retaining wall;
(iv) to erect or reconstruct the said reinforced concrete retaining wall immediately after the approval of the building plan.
6 On 9 December 1970, the plaintiffs wrote to the defendants reminding them of their letter of 15 December 1969 and informing them that the response from the defendants was very poor and that they (the plaintiffs) had received a notice from the Public Works Department requesting them to divert the sewer lines in the estate to connect to the government sewer along Pasir Panjang Road. The plaintiffs continued:
In view of this and the urgency in having the retaining wall reinforced we wish to appeal to you to reconsider the matter again urgently. If you are agreeable to entrust the work to us, please confirm by writing that you will be agreeable to contribute proportionately the costs involved.
7 We estimate that the costs will be as follows:
Repair to retaining wall $ 40,000.00
Diversion of minor sewer $ 10,000.00
$ 50,000.00
The above estimates are mere estimates from us to serve as an indication of the cost at present market conditions. You will note that the cost of construction has increased substantially and it is unlikely to reinforce the retaining wall at the original estimate of $32,000.
8 If you agree to contribute proportionately, we shall instruct our architects, to call tenders and the tenders will be opened after you are notified.
9 Because of the poor response from the defendants the plaintiffs wrote to the defendants on 26 July 1971, giving the defendants notice that as from 1 January 1972, they would discontinue the maintenance works for the flats and requesting the defendants to organise themselves into a new management corporation as soon as possible to look after the maintenance works in respect of the flats. On 1 August 1973, the plaintiffs wrote to the defendants asking them to attend a meeting to be held at a local hotel on 8 August 1973, to discuss (1) the sewer diversion required to be done by the PWD; (2) the retaining wall, car park and painting required to be done by the Commissioner of Buildings. Only three of the defendants attended and the meeting could not proceed. In August 1973, the plaintiffs were served with a notice under s 2(2) of the Local Government Integration Act (Cap 210) and By-Law 14 of the Municipal ( Private Sewage Purification Plants and Chemical-Closet) By-Law 1951 by the PWD requiring the plaintiffs to divert the sewer lines in the estate to connect to the government sewer. The plaintiffs then discussed with the proper authorities about the building of the retaining wall. The plaintiffs proposed the building of an earth embankment instead of a long retaining wall of about 240 ft. The discussions took place over a period of several months. Finally approval was given by the proper authorities for the building of an earth embankment and the construction of a retaining wall of about 10 ft. The plaintiffs then through their architects invited tenders in May 1974, for the erection and completion of RC retaining wall, diversion of sewer from the sewerage treatment plant to connect to the public sewer together with ancillary works. Eventually the tender of Tai Kheng Private Ltd (Tai Kheng), for $99,500 was accepted. The plaintiffs had to proceed with the work or face prosecution as the matter had been delayed since 1969 and they had been served with notices from the Commissioner of Buildings under s 4(1) of the Buildings and Common Property (Maintenance & Management) Act 1973. The plaintiffs also asked Tai Kheng to do the earth embankment with close turfing and level the car park and repair the drains for $65,900. The resurfacing of the car park was done by Guan Chwee Construction for $3,040.60 in 1975.
10 On 16 September 1974, the plaintiffs wrote to the defendants informing them that `due to the increased cost in the maintenance of the above property we regret we have to exercise our right under cl 6 of the lease to increase the rent (maintenance fee) to $15 per flat per month with effect from 1 April 1975`.
11 The plaintiffs say that they are entitled to recover from the defendants a pro-rata contribution of the following expenditures incurred under cl 4(c) of the leases plus 10% under cl 2(f) of the leases:
(a) Sewer diversion (under cl 4(c)(ii)) $ 99,500.00
(b) Earth embankment with close turfing (under cl 4(c)(i)) $ 65,900.00
(c) Car park repairs & maintenance (under cl 4(c)(iv))$ 3,040.60
(d) Surveying & demarcation fee (under cl 4(c)(ii)) $ 180.00
(e) Plan fee (under cl 4(c)(ii)) $ 12.00
(f) Engineers` Professional fees (under cl 4(c)(ii)) $ 4,125.00
$172,757.60
12 The plaintiffs claim from each defendant under this claim (referred to as claim A in the schedule of particulars in the amended statement of claim) the sum of $5,938.54 worked out as follows:
Expenses incurred $ 172,757.60
Plus 10% $ 17,275.76
$ 190,033.36
1/32 share for each flat $ 5,938.54
13 Alternatively the plaintiffs claim under cl 2(b) of the leases the following:
(i) Sewer diversion $ 99,500.00
(ii) Earth embankment with close turfing $ 65,900.00
(iii) Surveying & demarcation fee $ 180.00
(iv) Plan fee $ 12.00
(v) Engineers` Professional fees $ 4,125.00
$169,717.00
Alternatively the plaintiffs claim under cl 2(c) of
the leases, the car park repairs and maintenance $ 3,040.60
and under cl 2(f) of the leases 10% of $ 3,040.60
$ 304.00
$173,061.60
1/32 share for each flat $ 5,408.18
14 The plaintiffs say that under cl 1 of the leases each of the defendants was liable to pay an annual rent of $60 per annum in advance on the 1 January and every year and by cl 6 of the said leases the plaintiffs, were entitled to increase the said rents. They have given the required notice in writing under cl 6 of the leases of the increase of the rent to $15 per month per flat with effect from 1 April 1975. The plaintiffs say that thirteen of the defendants failed to pay the said increase of rent and they now claim from them.
15 Under cl 4(c) of the leases, the plaintiffs covenanted as follows:
That the Company (meaning the plaintiffs) will maintain repair, redecorate and renew (i) the main structure and in particular the roof gutters and rain-water pipes of the Estate (ii) the gas and waterpipe drains, sewer lines and septic tank and electric cables in under and upon the Estate and enjoyed or used by the purchaser in common with the owners and lessees of the other flats (iii) the main entrances passages landings and staircases of the building of which the flat forms part so enjoyed or used by the purchaser in common as aforesaid and the paths and roadways leading thereto (iv) the car park enjoyed or used by the purchaser in common as aforesaid.
16 Under cl 2(b) and 2(f) of the leases the defendants covenanted with the plaintiffs as follows:
2(b) To pay all rates taxes assessments charges impositions and outgoings which may at any time during the terms hereby granted be assessed charged or imposed upon the flat or the owner or occupier in respect thereof and in the event of any rates taxes, assessments, charges, impositions and outgoings being assessed charged or imposed in respect of the assessment or any part thereof to pay a proper proportion of such rates taxes, assessments, charges, impositions and outgoings attributable to the flat.
2(f) Forthwith on demand to repay all reasonable expenses (plus 10%) incurred by the company (meaning the plaintiffs) in executing any repairs or work under sub-cl (e) of this clause and sub-cl (c) of cl 4 including such repairs or work ought to have been done by the purchaser in accordance with sub-cl (a) of cl 3 and in case of any differences as to the amount of such expenses attributable to repairs or work within this sub-clause such difference shall be referred to arbitration in accordance with cl 8 hereinafter contained.
17 Clause 6 of the leases provides:
Provided further and it is hereby agreed that if the rent herein before reserved shall at any time amount to less than 110% of the total cost to the Company of carrying out the covenants on its part more particularly set out in cl 4 hereof the Company shall be entitled upon giving not less than six months notice in writing to increase the said rent provided that the said rent after such increase shall not exceed 140% of such cost as aforesaid and provided also that no such revision shall take place under the expiration of five years from the date hereof and thereafter shall not take place more often than once in every period of five years.
18 The defendants have admitted liability for the sums claimed under claim B except the annual maintenance fee of $180. Counsel for the defendants submits that the claim for the $180 maintenance fee should be dismissed for the following reasons:
(1) This maintenance fee is payable yearly in advance on 1 January of every year (cl 1). In order to increase this fee the plaintiffs must satisfy the requirements of cl 6. When the notices dated 16 September 1974, were sent out to the defendants they purported to take effect from 1 April 1975. That is not in accordance with cl 1 and 6 because the increased fee can only take effect on the first day of the year.
(2) When the notice was sent out the total costs incurred by the plaintiffs did not amount to 110% of the fee.
(3) The notice was also wrong because the calculations given to the defendants to justify the increase were based on eight months` expenditure.
(4) The plaintiffs have sought to justify their calculation by introducing salary of Tan Yeo Gee (who was employed by the plaintiffs as estate supervisor at salary of $600 pm).
19 There is no substance in this submission. Clause 6 provides that in certain circumstances the plaintiffs can give six months` notice of the increase and it does not say they must do it in January. The plaintiffs have clearly justified the increase. Clauses 1 and 6 have not been infringed.
20 The defendants have denied the plaintiffs` claim made under cl 4(c) read with cl 2(f) of the leases on the ground that a claim under cl 4(c) can be made only if the plaintiffs have performed their covenants under cl 4(c). Counsel for the defendants submits that the evidence is clear that the plaintiffs have never performed their covenants under cl 4(c).
21 Counsel for the defendants have not pointed out the evidence which would show that the plaintiffs never performed their covenants. Counsel merely relies on the statutory notices sent to the plaintiffs to compel them to do the works in order to show that the plaintiffs did not do the works initially.
22 The defendants have not brought any evidence to show that the plaintiffs were in breach of their covenants. The evidence adduced by the plaintiffs shows that they have done the work despite the difficulties they had to face from the government departments, poor response from the contractors, the nature of the work and the complete lack of interest of the defendants themselves.
23 Counsel for the defendants says that the plaintiffs had undertaken with the sanitary authorities to divert the sewer as far back as 1961. In 1970 the plaintiffs received a notice from the PWD requesting them to divert the sewer line. From 1970 to 1974 the plaintiffs did nothing to divert the sewer. Instead of proceeding to divert the sewer the plaintiffs asked the defendants to contribute and because the defendants did not agree to contribute the plaintiffs refused to carry out the work. Counsel submits that that is a clear breach on the part of the plaintiffs because the defendants at that time were under no obligation to pay the contributions and nothing was done for four years. In my view there was no breach of covenant by the plaintiffs as the statutory notice in respect of the sewer did not arise from disrepair of any sort.
24 Counsel for the defendants says that the plaintiffs instead of proceeding to repair the embankment, after it collapsed at the end of 1968, requested the defendants to pay their contribution first and because only two or three of the defendants paid the plaintiffs refused to carry on the work. This dragged on until July 1973, when the work was put in hand. Counsel submits here again the plaintiffs have breached their covenant.
25 A covenant by a landlord to repair the demised premises is construed as a covenant to repair on notice and until he has received notice, or has actual knowledge of the want of repair the landlord will not be guilty of any breach of his covenant. (See 23 Halsbury`s Laws of England (3rd Ed) p 587 para 1269.)
26 In this case the plaintiffs, when they were informed in 1968 by one of the defendants (Lim Kay Woon) that the retaining wall was about to collapse, sent someone to reconstruct the drain and erect some timber poles to support the retaining wall. The plaintiffs on notice of the landslide in December 1969, contacted and consulted their architects. The plaintiffs also contacted the defendants to obtain their views and reactions on the question of their contribution for the costs of the works. This is not unreasonable on the part of the plaintiffs as the defendants were ultimately liable to pay for the works which were to be carried out. The plaintiffs were also trying all means to economize on the earth embankment work. They discussed with the proper authorities on the matter. The proper authorities wanted the plaintiffs to put up a retaining wall of 240 ft. The plaintiffs suggested an earth embankment instead of a retaining wall to save costs. The discussion took a long time and eventually the plaintiffs received approval to construct an earth embankment with a ten ft retaining wall. I find that at no time did the plaintiffs sit back and refused to do anything once they were aware of the repairs that were required.
27 I reject the defendants` defence to claim A made under cll 4(c) and 2(f) of the leases, based on the allegation that the plaintiffs never performed their covenants under claim 4(c).
28 Counsel for the defendants submits that the plaintiffs are not entitled to recover claim A under cl 2(b), for these reasons. Counsel for the defendants submits that the defendants` covenant under cl 2(b) cannot cover every expenditure incurred by the plaintiffs and that it must be read subject to cl 4(c) where the plaintiffs have covenanted to perform the matters stated therein. The argument of counsel is that the covenant by the defendants to pay `impositions and outgoings` in cl 2(b) must be read with cl 4(c) to determine whether what the plaintiffs had done in pursuance to the statutory notice were `impositions and outgoings`. Counsel submits that where in a lease the lessor has covenanted to carry out certain obligations then as a matter of construction of the lease the lessees covenant to pay `impositions and outgoings` cannot refer to the same obligations in respect of which the lessor is required to carry out under statutory notices.
29 Counsel for the defendants submits that as regards the expenditure incurred by the plaintiffs for the diversion of the sewer line the expenditure incurred was charged or imposed on the plaintiffs before any of the leases came into effect and that the expenditure was part of the obligation of the plaintiffs as owner under By-law 14 of the Municipal (Private Sewage Purification Plants and Chemical Closets) By-Laws 1951. Counsel further submits that this charge was not attributable to the flat but to the failure of the plaintiffs to carry out their obligations.
30 As regards the expenditure incurred by the plaintiffs for the earth embankment work, counsel for the defendants submits that that is a charge on the plaintiffs as the owners of the common property. Counsel says it is clear that the defendants have no property whatsoever in the embankment as they have only a 999,999-year lease in the flat and that the notice of 6 December 1973, from the Commissioner of Building under s 4(1) of the Building and Common Property (Maintenance and Management) Act 1973, constituted a charge on the plaintiffs as the owners of the common property.
31 I am unable to agree with the submissions of counsel for the defendants. The defendants bought the flats and they are owners of the flats and they are expected to do everything and pay everything. It is obvious that the object of the leases is to transfer all the liabilities from the plaintiffs to the purchasers. The sewer diversion work was required under By-Law 14 and is not a plaintiffs` covenant. The cases cited by counsel for the defendants were all short term leases (three to 21 years) and in some cases two covenants fell to be construed, whereas in the present case only one covenant falls to be construed. Those cases do not assist the defendants` case. It appears to me that the wording of cl 2(b) is wide enough to cover the sewer diversion work and at the time when the covenant was entered into the possibility of such work being carried out would I think clearly be within the contemplation of the parties to the covenant.
32 The defendants complain that the expenditures for the sewer diversion and the earth embankment were excessive and/or unreasonable.
33 Counsel for the defendants says that the $99,500 tender of Tai Kheng for the sewer diversion work was not a proper tender in that it was a private arrangement between the plaintiffs and Tai Kheng and that as regards the embankment work the plaintiffs gave the contract to Tai Kheng for $65,900 without calling for tenders. Counsel says that Tai Kheng could not explain satisfactorily how they arrived at the figures of $99,500 and $65,900. Counsel submits that in these circumstances the tender for $99,500 and the contract for $65,900 were notbona fide but were mere private arrangements between the plaintiffs and Tai Kheng.
34 Counsel for the defendants submits that, if the defendants are liable, the claims for the sewer diversion work should only be $10,000 and for the embankment work $32,000 (these were the initial quotations of the plaintiffs) and if the court is not inclined to accept the plaintiffs` initial quotations, then the court should accept the evidence of the defendants` witness, Denis J Krist, a chartered quantity surveyor, that the sewer diversion work should cost $40,280 and the earth embankment work $15,267.
35 I am unable to accept the submissions of counsel for the defendants. The evidence adduced by the plaintiffs showed clearly that at all times the plaintiffs had been striving to save costs. The question of the earth embankment work arose first in 1969 and the first statutory notice was in 1970. The sewer diversion work only arose in August 1973. While the plaintiffs were trying to get the Commissioner of Buildings to allow them to do the embankment work instead of the 240 ft retaining wall, the sewer diversion work arose and formal plans had to be submitted in respect of both works. The works took so long as certain amendments had to be made to the drawings due to site conditions and approval for the changes had to be obtained from the proper authorities. The works took so long because of the difficult nature of the works due to site conditions - the slope, stabilising the earth around it and the different levels - which affected both the sewer and the embankment. The sewer work affected the embankment and the embankment work affected the car park. The embankment work had to be completed before the work on the car park could commence. Thus the delay was not unreasonable or intentional. Many contractors were not interested in the works after they had seen the site conditions. The quotation of $32,000 by the plaintiffs on 15 December 1969, for the retaining wall was not a tender price but it was based on a preliminary proposal to erect a short retaining wall just to stop the tilting and stabilise the ground near the existing retaining wall and the calculation was done by Lee Chin Chuan, the managing director of the plaintiff company. The estimate of $10,000 given by the plaintiffs on 9 December 1970, for the sewer diversion work was again the estimate of Lee Chin Chuan. There was an intention to have a competitive tender but the plaintiffs had difficulty in getting contractors to tender. The defendants and their friends were invited to tender but they did not. It is understandable why Tai Kheng cannot explain in detail the breakdown of the tender as it was a lump sum tender. The plaintiffs had done all they could do. They called for tenders, they invited the defendants or their friends to tender and they gave the work to the only contractor who was prepared to accept the job at a time when there was a building boom and other contractors preferred other jobs than the jobs in question. I cannot rely on the evidence of the defendants` witness Krist that the sewer diversion work should cost $40,280 and the earth embankment work $15,267. He did not visit the site to see the difficult terrain. He could of course work out the quantities of earth and filling required from the plans produced by the plaintiffs` architects but he based his costs on other tenders and I do not know if they were accepted tenders.
36 In the result the plaintiffs have proved their claim. The following sums are due from all the defendants:
A Under cl 2(b) of the leases:
(i) Sewer diversion $ 99,500.00
(ii) Surveying & demarcation fee $ 180.00
(iii) Plan fee $ 12.00
(iv) Engineers` professional fees $ 4,125.00
B Under cl 4(c) of the leases:
(i) Earth embankment with close turfing $ 65,900
(ii) Car park repairs and maintenance plus 10%
under cl 2(f) of the leases $ 3,040.60
37 The defendants, set out in para 11 of the amended statement of claim, must pay the plaintiffs the increase of rent as shown in para 12 of the amended statement of claim.
38 The plaintiffs will have judgment with interest and costs.
39 Claim allowed.