Teknikal Dan Kejuruteraan Pte Ltd v Resources Development Corporation (Pte) Ltd
[1992] SGHC 321
Suit 3300/1982
Michael Hwang JC
21 December 1992
1 JUDGMENT:
2 Cur Adv Vult
3 The plaintiff company was incorporated for the purpose of undertaking a project on Pulau Ubin for the defendant. However, the plaintiff was unable (for reasons which are in dispute) to carry out the project successfully, resulting in the termination of the contract between the plaintiff and the defendant and the eventual liquidation of the plaintiff. With the approval of the Official Receiver, the plaintiff now sues the defendant for damages for breach of contract and other related reliefs and, with the leave of the court, the defendant counterclaims for damages for breach of the same contract and a declaration as to the validity of certain security documents.
4 At the material time, the defendant owned, or had some proprietary interest in, certain granite quarries in Pulau Ubin. Sometime in early 1981, it called for tenders from contractors to operate the defendant's 500 tonnes per hour ("tph") granite crusher plant at its Pulau Ubin quarry for the period 1 May 1981 to 31 May 1984. Whether or not the plant (which was then under construction) actually had a capacity of 500 tph is in issue, and I will deal with this later. One of those invited to tender was a Malaysian company, Syarikat Teknikal dan Kejuruteraan Sdn Bhd ("STDK"), which eventually procured the incorporation of the plaintiff as its wholly owned subsidiary. The tender documents included the following:
5 (a) form of tender;
6 (b) conditions of tendering;
7 (c) various appendices to the conditions, including the technical specifications for the 500 tph granite crusher plant;
8 (d) specification for the operation of the 500 tph granite crusher plant (in effect a set of contractual conditions, which I will call "the Specification"); and
9 (e) various drawings of the site including, in particular, a topographic survey of the site with certain seismic data marked on it. (The seismic data was in fact collated by the defendant from seismic studies made by an independent contractor and transposed onto the topographic survey by the defendant).
10 STDK submitted its tender in April 1981. There then followed several meetings between representatives of STDK and the defendant. The man acting on behalf of STDK in dealing with the defendant was its managing director, Mr Ong Tiong Lam. According to Mr Ong, on 7 or 8 May 1981, he met an American consultant of the defendant, Mr W J Parton, who gave him a copy of a report that he had just finished for the defendant on the quarry. I will return to the significance of this report (which I will call "the Parton report") later. At about the same time, Mr Ong was verbally informed that STDK had been awarded the tender, and the letter confirming this is dated 8 May 1981.
11 After the tender was awarded to STDK, it decided that it would undertake the project through a Singapore incorporated subsidiary. The plaintiff was incorporated sometime in May 1981 and, on a date which cannot be determined exactly, a formal agreement dated 8 May 1991 was signed by STDK and the defendant. By a novation agreement dated 31 July 1981 entered into between STDK, the plaintiff and the defendant, the contract dated 8 May 1981 was novated to the plaintiff and STDK was released and discharged from its obligations.
12 It is necessary to examine the documents constituting the contract dated 8 May 1981. There was the original tender submitted by STDK containing the documents listed earlier. The tender was sent under cover of a letter from STDK dated 2 April 1981, which was attached to the formal agreement. The contract also attached the letter of acceptance from the defendant to STDK dated 8 May 1981. Finally, a bundle of pink documents was also attached, entitled "Form of Agreement and Conditions of Contract" (which were not part of the original tender documents). It is not disputed that all these documents formed part of the contract between STDK and the defendant. These contract documents were eventually attached to the novation agreement, so it is clear that the contract between the plaintiff and the defendant was mutatis mutandis exactly the same contract as that which had been entered into between STDK and the defendant.
13 The basic commercial objective of the contract was for the plaintiff to extract granite from the defendant's quarry and to transport the granite to the 500 tph granite crusher plant for crushing into commercially usable granite dust (although this was later changed to crusher run). In order to achieve this, the following things (among others) had to be done under the contract.
14 (a) The defendant had to clear a certain part (known as the "Initial Area") of the contract area (known as "Area A") of existing overburden (which is the earth above the surface of the granite) before the plaintiff was to start its work of granite extraction.
15 (b) The plaintiff would then remove the remaining overburden from the Initial Area as well as all overburden from the rest of Area A.
16 (c) The plaintiff would carry out the necessary operations in the quarry so as to extract granite rocks and transport them to the defendant's granite crusher plant for crushing.
17 (d) The defendant had to complete and commission the granite crusher run plant.
18 (e) The plaintiff would require certain machinery and equipment for its quarrying operations. Although this was not mentioned in the contract, it was agreed that the defendant would lease some of this equipment and machinery to the plaintiff.
19 The plaintiff's case is that, owing to the wrongful acts or omissions of the defendant, virtually none of these things were done in the way that they were supposed to have been done.
20 Certain productions targets were set for the plaintiff in the contract but these targets were not met. Under the contract, failure to meet the targets would result in liquidated damages. Eventually, the defendant purported to terminate the contract because of the plaintiff's breaches. The validity of this termination is challenged by the plaintiff.
21 The plaintiff's claims fall under various heads which are expressed both cumulatively and alternatively. They may be summarised as follows.
22 1. The terms of the Specification itself (by the references to production capacity of the plant, clearance schedule for the Initial Area, minimum production targets and liquidated damages, as well as the seismic data supplied) misrepresented to the plaintiff that the granite reserve was close to the surface level. Furthermore, the defendant did not strip the overburden to within one metre of the granite reserve as it was supposed to do. Accordingly, when the site was handed over to the plaintiff, there was more overburden in the Initial Area than was allowed for under the contract. The plaintiff was therefore unable to proceed with its task of extracting granite as there was too much earth over the granite.
23 2. The terms of the Specification (as described above) as well as the Parton report misrepresented that the amount of granite reserve was sufficient for viable commercial production. This led the plaintiff to suffer loss since it was unable to achieve the production targets or, indeed, sufficient production to make the project commercially viable.
24 3. The defendant misrepresented to the plaintiff that its granite crusher plant would be commissioned and would have a capacity of 500 tonnes per hour. The plant was never properly commissioned, never operated at 500 tonnes per hour and constantly broke down.
25 4. The defendant was also guilty of negligence in making the misrepresentations complained of.
26 5. The defendant delayed in supplying certain machinery and equipment which were necessary for the plaintiff's operations, thereby further impeding its work.
27 6. The defendant wrongfully requested the plaintiff to work in an area known as "Area B", which was outside the contract.
28 7. The defendant wrongfully terminated the contract under cl 35 of the Specification instead of cl 34 of the Conditions of Contract, the latter being the applicable clause for termination.
29 I now examine the plaintiff's arguments in greater detail under each of these heads.
30 1. Overburden
31 Cl 4 of the Specification provided two alternative bases of tendering with regard to the obligation to remove overburden. It is common ground that the alternative adopted by STDK (and therefore by the plaintiff) was Alternative A, which provided:
32 Alternative A
33 The Company the defendant will clear an initial area of overburden as shown in the drawing RDC/QO-PU/1A. As quarrying proceeds the Contractor the plaintiff shall be responsible for the continual removal of overburden to a minimum distance of 10 metres back from the quarry face and form slopes of 1:1. The rock surfaces shall be kept bare and this condition must be maintained and kept well ahead of any rock extraction of the quarry face. The Contractor is also responsible to remove any boulders that may be encountered in the overburden removal. This condition of the overburden to be removed within 10 metres from the quarry face shall be maintained up to the end of the contract.
34 In the initial removal of overburden by the Company, the Company will clear the earth to within 1 metre of the rock surface as far as possible. The contractor shall be responsible for the removal of whatever left over and shall allow for the cost of such expenditure in his tender rate. (emphasis added)
35 However, in the plaintiff's letter of 2 April 1981 submitting its tender, STDK stated:
36 Overburden Removal:
37 We undertake to execute the work of removal of overburden and will take over this operation as soon as our machinery for stripping of overburden arrives at worksite - i.e. within four months from date of acceptance of our offer.
38 Although the defendant attempted to argue that this letter relieved it from its obligation to clear overburden after four months from date of acceptance, I accept the plaintiff's explanation that this letter merely indicated when its obligations under Alternative A would commence.
39 There are two aspects of the plaintiff's complaint about the existing overburden found in the Initial Area.
40 (a) First, the tender documents, by the seismic data contained in the topographic survey and in various parts of the Specification, misrepresented that the granite reserve was close to the surface level.
41 (b) In any event, the defendant was in breach of its obligations under cl 4 of the Specification to strip the overburden to within one metre of the granite reserve so as to enable the plaintiff to carry out its obligations under the contract.
42 Although much time was spent by plaintiff's counsel in developing his case on misrepresentation, in my judgment these contentions are immaterial to the present case. From the plaintiff's point of view, it mattered not how close the granite was to the surface because, under cl 4 of the Specification, it was the defendant's obligation to clear the Initial Area to within one metre of the granite reserve. In other words, the depth of the overburden before the site was handed over to the plaintiff was really the defendant's problem and not the plaintiff. If, upon the plaintiff's arrival at the Initial Area, more than one metre of overburden had still been present, its true complaint would lie in its claim against the defendant under cl 4 of the Specification, rather than its claim based on misrepresentation (particularly in the absence of a prayer for rescission). It follows that whether or not the seismic data was correct about the depth of overburden should have been of no legal concern to the plaintiff, since any excessive overburden in the Initial Area would have had to be cleared by the defendant pursuant to cl 4. Since the plaintiff is suing the defendant for damages for breach of cl 4, the plaintiff's claim based on misrepresentation is effectively subsumed within its claim for breach of contract.
43 The plaintiff also complains that the excessive overburden resulted in loss of production, and hence loss of income, but the answer to that contention is that, under cl 19 of the Specification, production amounts were controlled by the defendant; hence the plaintiff could not be guaranteed any fixed income in any month. However, I need not develop this discussion further because of my later findings of fact on the question of overburden.
44 I acknowledge that the plaintiff might have had an interest in the depth of the overburden in the remainder of Area A, as well as the overall availability of granite in the quarry, but there was no, or no credible, evidence adduced by the plaintiff that the seismic data in relation to the rest of Area A was incorrect. I will comment on the lack of independent expert evidence later.
45 I therefore turn to the plaintiff's contractual claim based on cl 4 of the Specification. The evidence of the plaintiff came mainly from Mr Ong Tiong Lam, who relied heavily on exhibit P-2. This was a plan prepared by him indicating the results of boreholes driven at various points in the Initial Area. According to the plan, 13 holes had been driven to depths of between 8 feet and 40 feet before touching rock surface, and 11 holes had been drilled without touching the bottom. The plan had been prepared by Mr Ong based on information given to him by Mr Wong Sin Fu (the former general manager of the plaintiff). Mr Wong's information was based on data from the records of the plaintiff which were not in Mr Ong's possession. Mr Wong was not called as a witness nor was any explanation given for his absence, and I am entitled to draw an adverse inference from his non-appearance, both on this point and on other points where his evidence would have been important to support the plaintiff's case.
46 Leading counsel for the defendant changed halfway through the trial. Although the defendant's original leading counsel did not object to the admission of exhibit P-2, the defendant's second leading counsel later submitted that no reliance could be placed on exhibit P-2, because it was hearsay evidence and could not treated as admissible evidence despite the lack of objection to its admission. He cited (among other authorities) the following passage from the judgment of Edgar Joseph Jr J in Popular Industries Ltd v Eastern Garment Manufacturing Sdn Bhd (1989) 3 MLJ 360 at 368:
47 It is true that counsel for the defendants did not object to the admissibility of P76 or the oral evidence thereon of the accountant Mr So. But, to quote Masodkar J in Sanjay Cotton Co v Omprakash AIR (1973) Bom 40 at p 43: "... here what one finds is that the learned counsel merely said that he has no objection to exhibit the documents ... If that be so, it is neither an admission as to the documents nor can be treated as an admission of the contents thereof." Moreover, it is settled law that inadmissible evidence does not become admissible simply by reason of failure to object. If any authority is needed for this proposition I would refer to the following passage in Sarkar, Laws of Evidence (13th ed) at p 51 applied by Lee Hun Hoe CJ (Borneo) in Malaysia National Insurance Sdn Bhd v Malaysia Rubber Development Corporation (1986) 2 MLJ 124 at p 127:
48 "An erroneous omission to object to evidence not admissible or relevant under the Act does not make it admissible. It is the duty of the court to exclude all irrelevant or inadmissible evidence even if no objection is taken to its admissibility by the parties ..."
49 I accept this argument. Exhibit P-2 is clearly hearsay evidence, and second-hand hearsay at that. Even if the failure by the defence to object to its admission had made it admissible (which I do not accept), I would not have found it reliable enough to give any weight to it, particularly in the absence of Mr Wong Sin Fu.
50 Mr Ong also gave oral evidence that he had personal knowledge of the overburden problem from his visits to the site once a week. I find this evidence unconvincing for various reasons.
51 (a) Mr Ong asserted that he had visited Pulau Ubin once a week. The defendant's witnesses, Mr Patrick Lam and Mr Fong Mun How, testified that they virtually never saw him on the island. Mr Fong Mun How, the defendant's former plant supervisor, was in charge of the 500 tph plant and never saw him there. Although Mr Fong might not have seen Mr Ong if he was at the quarry, it is difficult to believe that Mr Ong could have visited Pulau Ubin without at least occasionally visiting the crusher plant and that, if he did, he did not bother to speak with the person in charge. Mr Patrick Lam, the defendant's former quarry manager, visited the island frequently and never saw Mr Ong there. Again, if Mr Ong had visited the island frequently, he should have seen Mr Lam on at least a few occasions. Neither Mr Fong nor Mr Lam was directly challenged by plaintiff's counsel on this aspect of their evidence. I am therefore sceptical of Mr Ong's claims to have been on the island as frequently as he said, and his alleged personal knowledge of any borehole tests must be suspect.
52 (b) His evidence as to personal knowledge was given late in the day in re-examination, and did not have sufficient detail to impress me with its credibility.
53 The plaintiff's other witness was its former site clerk, Mr Ng Boon Kwee, but he was unhelpful on the extent of overburden.
54 On the other hand, the defendant's evidence as to the extent of overburden was more persuasive. Mr Patrick Lam gave evidence that the defendant had complied with its contractual obligations in removing the overburden, but he, of course, was an interested witness.
55 The most important evidence on this point came from a relatively disinterested third party, Mr Loh Teck Lok. He was the sub-contractor for the defendant's contractor (Chuan Joo Pte Ltd), which had been awarded the contract for clearing the overburden in the Initial Area to within one metre of the granite reserve. The terms of the contract awarded to Chuan Joo Pte Ltd matched the requirements of the defendant in cl 4 of the Specification, and indeed exceeded them. As Mr Loh Teck Lok explained in his evidence, the scope of his contract was that he, on behalf of Chuan Joo Pte Ltd, had to clear the Initial Area of overburden to within one metre of rock surface or a volume of 495,000 cubic metres of earth, whichever was the greater. He had in fact completed the clearance of overburden to within one metre of rock surface but, because the volume of earth removed was less than 495,000 cubic metres, he was obliged to undertake further earth clearance work in another area known as Area B. A number of photographs of the site taken by Mr Fong Mun How around August 1981 (exhibits D-3B, D-4B and D-5B) were shown to him, and he confirmed that they reflected the true condition of the site. These photographs showed totally exposed granite surfaces with overburden totally stripped. Mr Loh had been asked to attend court by Chuan Joo Pte Ltd, which had been subpoenaed by the defendant. He was therefore effectively a witness under subpoena, who had not discussed his evidence with the defendant or its solicitors, and was obviously a candid, if somewhat reluctant, witness. This made his testimony all the more credible, so much so that he was not challenged on any aspect of his evidence by plaintiff's counsel.
56 Added to his evidence is that of Mr Fong Mun How, who identified the other pictures he had taken, including exhibits D-6B and D-7B, which showed the site in October 1981 with relatively large areas of exposed rocks available for quarrying and granite extraction.
57 Finally, I am surprised that, if the issue of excessive overburden was so crucial to the plaintiff, it did not take any action, either before or after the issuance of the writ, to have an independent expert visit the Initial Area and prepare a report on the amount of overburden present. Even if the defendant had objected, such a visit would undoubtedly have been possible with the aid of an appropriate order of court.
58 The weight of evidence therefore leads me to the conclusion that the plaintiff cannot prove its allegation that the Initial Area had not been substantially cleared of overburden to the required depth. Accordingly, the defendant is not liable for breach of contract. This finding of fact would also dispose of the plaintiff's claims based on misrepresentation, apart from the reasons I have given earlier for disregarding them.
59 2. The Parton report
60 The plaintiff contended that the defendant, by the terms of the Specification, misrepresented that the quarry had sufficient granite reserves for viable commercial production. Furthermore, it was alleged that the Parton report misrepresented that the quarry contained 16.7 mio tonnes of available granite stones. The plaintiff further contended that it relied on the Specification and the Parton report when entering into its contract with the defendant. I need not debate whether or not Mr Parton did hand Mr Ong the Parton report with the authority of Mr Patrick Lam, as I dismiss the plaintiff's contentions for the following reasons.
61 (a) The Parton report was allegedly handed to Mr Ong on 7 or 8 May 1981. STDK's tender was submitted in January 1981, well before this date. The tender was verbally accepted on 7 or 8 May 1981 and the letter of acceptance was dated 8 May. Upon the acceptance of the tender, a binding contract came into force between STDK and the defendant, to be replaced in due course by the contract between the plaintiff and the defendant. The history of the matter shows that STDK could not have been induced by the alleged representation to enter into its contract with the defendant, since its tender had already been submitted and it was merely awaiting acceptance (or possibly had already been notified of acceptance) of the tender when the Parton report was allegedly handed over. There is also no allegation that, immediately before the Parton report was handed over, STDK was contemplating withdrawing its tender but was induced not to do so by the Parton report. Furthermore, there is no evidence that the plaintiff was in any way induced by the Parton report to enter into the novation agreement; indeed the novation agreement was entered into at the request of STDK and the plaintiff, since STDK was already contractually bound to carry out the terms of the tender which had been accepted and converted into a formal contract.
62 (b) No or no credible evidence was adduced by the plaintiff to show that the granite reserves in the quarry were in fact unsubstantial. No additional evidence was led by the plaintiff other than the allegations about excessive overburden. On the other hand, the photographs submitted by the defendant (in particular Exhibits D-6B and D-7B), while not conclusive, tended to rebut the plaintiff's case. In his re-examination, Mr Fong Mun How also gave evidence of the estimated granite reserve, suggesting that there were ample reserves to keep a contractor busy for a few years. While I took Mr Fong's evidence on this point with a pinch of salt as he was not an expert witness, I was disappointed to find a lack of independent expert evidence to prove an important element of the plaintiff's case.
63 (c) I accept the evidence of Mr Lam (which was supported by the documents in this case) that the plaintiff was unable to extract granite to meet its production targets because of its lack of proper machinery and equipment and adequate manpower. In the circumstances, whether the quarry had reserves of 16.7 mio tonnes is simply irrelevant, since the plaintiff could not have fulfilled its contractual requirements in any event owing to its own shortcomings.
64 In any event, the claims based on misrepresentation appear of no legal consequence because the statement of claim does not plead that any loss arose from the alleged misrepresentations. The loss, if any, could only have arisen if the misrepresentations led the plaintiff to enter into an unprofitable contract, but there is no allegation that the contract was unprofitable as such. Para 26 of the statement of claim alleges losses of over $23 mio, but this claim is clearly based on the total loss alleged to have been suffered from the wrongful termination of the contract, including a claim for loss of profits of over $21 mio which must be founded on the premise that the contract would have been profitable.
65 In view of my findings on the misrepresentations, it is unnecessary for me to deal with the question of whether the plaintiff would be entitled to relief under the English Misrepresentation Act 1967, particularly when it has not been specifically pleaded. Although I would have been happy to make a decision on this point, given that it is now irrelevant to the issue of liability, it would not be appropriate for me to spend time and effort on an academic question when I have yet to deal with the other issues of fact and law which will determine the liabilities of the parties to each other in this case. I must regretfully pass over this opportunity to determine a question of general interest for another occasion when it can receive the full attention it deserves.
66 3. The 500 Tonnes Per Hour Granite Crusher Plant
67 The plaintiff's case placed great reliance on the fact that the plant was never properly commissioned. Mr Ong's contention was that the plaintiff had never been formally invited to participate in the commissioning in August 1981, although its general manager, Mr Wong Sin Fu, had been present as an observer.
68 However, since Mr Wong Sin Fu did not give evidence, all that the plaintiff could rely on was a letter written by Mr Wong dated 28 August 1981, where certain complaints were made by him about the plant and the commissioning. This letter is hearsay and cannot not be relied on. Again, I have to draw an adverse inference from the non-appearance of Mr Wong.
69 On the other hand, the evidence from the defendant was also unsatisfactory. In para 19 of the defence, the defendant pleads that the plant was commissioned in the presence of "the plaintiff's representatives" (note the plural). However, the evidence of Mr Fong Mun How was that no one from the plaintiff was present throughout the commissioning, not even Mr Wong Sin Fu, although he had personally asked Mr Wong to attend. Mr Patrick Lam gave evidence that he was present throughout the various days of commissioning, but Mr Fong (who also said that he was present on each day of the commissioning) said that Mr Patrick Lam was only present on the last day.
70 Be that as it may, the presence or absence of the plaintiff's representatives at the commissioning is of relatively little importance to the misrepresentation issue. Plaintiff's counsel agreed in his written closing submissions that commissioning need not have been done in the presence of the plaintiff's representatives. On the pleadings, commissioning in itself can be of no legal significance; what is in issue is whether or not the plant had a capacity of 500 tonnes per hour. Its successful commissioning witnessed by the plaintiff would probably have proved this beyond argument, but sufficient evidence was given by Mr Fong Mun How to show that the plant was capable of reaching 500 tonnes per hour, and did so for about two and a half hours on each of the last two days of the commissioning. The reason why the plant was not tested for a longer period at this capacity was because of the shortage of rocks which were supposed to have been supplied by the plaintiff.
71 There were also complaints from the plaintiff that the plant broke down on various occasions. The evidence of this came from Mr Ong Tiong Lam (who claimed personally to have witnessed some of these occasions) and Mr Ng Boon Kwee, (the plaintiff's former site clerk) who was somewhat vague about the nature of the breakdowns. Mr Fong Mun How, however, explained that a new plant would inevitably have teething problems and some of the breakdowns were attributable to mis-handling of the plant by the plaintiff's employees.
72 Plaintiff's counsel made great play of the failure of the defendant to produce the commissioning report (which was admitted to have existed) and to draw an adverse inference from such non-production. While I am not happy with the absence of the report, I cannot allow a negative factor to override the positive effect of the actual evidence led by Mr Fong. I would also have expected more strenuous efforts from plaintiff's counsel before the trial to have secured the production of the report, or at least an explanation for its absence.
73 Although I find the evidence on the central issue of the capacity of the plant somewhat vague, I am not prepared to make a positive finding in favour of the plaintiff's contention in the absence of some expert evidence in support of the plaintiff. I note that no attempt was made by the plaintiff at any stage to ask for an independent expert to examine and test the plant for purposes of giving evidence in these proceedings, even after the writ was issued. Although by then the plaintiff was no longer on the site, it could have made an application under o 29 r 2 or o 29 r 3 of the Rules of the Supreme Court, 1970 or under the inherent jurisdiction of the court (see Ash v Buxted Poultry Ltd (The Times, 29 November 1989)). My remarks here would also apply to my earlier observations at various points in this judgment about the lack of independent expert evidence.
74 Mr Fong Mun How gave the most important evidence in connection with this aspect of the case. His testimony, which was not seriously challenged by plaintiff's counsel, was that the plaintiff was never able to supply enough rocks to run the plant at 500 tonnes per hour for more than a couple of hours a day. According to his recollection, the plaintiff was only once able to run the plant for four hours a day. There were also insufficient workers, and Mr Wong Sin Fu never queried the capacity of the plant after the commissioning.
75 Although much emphasis was laid by plaintiff's counsel on the lack of any evidence that the plant could run at 500 tonnes per hours for 6 hours a day for 3 consecutive days, I find this of no significance since, on Mr Fong's evidence (which I accept), the plaintiff was hardly ever in a position to run the plant at 500 tonnes per hour for more than a couple of hours a day.
76 Mr Ong Tiong Lam gave evidence that he had personal knowledge of the defects in the plant and that he had seen the hopper plant jammed on many occasions, but I do not find his evidence convincing and, in any event, he could not assist the court on the main issue of the capacity of the plant.
77 In all the circumstances, I find that the allegation of misrepresentation in relation to the capacity of the plant unproved. I appreciate that commissioning has a contractual significance, and invited plaintiff's counsel to consider an appropriate amendment to the statement of claim, but he declined my invitation. In the circumstances, I need not explore this point further.
78 4. Negligence
79 My findings of fact that there were no misrepresentations of fact effectively preclude any claims for negligent misrepresentations, and I need not discuss this issue further.
80 5. Machinery and Equipment - Leases
81 Although reference is made in para 11 of the statement of claim to an agreement made between STDK and the defendant for the latter to purchase the necessary machinery and lease it to STDK, no further allegation is made in the statement of claim in respect of the leases as such. The only other reference to the leases is a claim for a declaration that, for the reasons set out in the statement of claim, the plaintiff is discharged from one of the lease agreements and a debenture charging the assets of the plaintiff to secure the lease.
82 Although there is dispute as to whose idea it was that STDK (and ultimately the plaintiff) should lease machinery and equipment from the defendant, I find the dispute of little relevance to the issue in the pleadings. No basis is stated for the claim for relief, and I can see nothing in the matters alleged in the statement of claim which supports any such claim for relief. If the plaintiff is successful in its claim for damages against the defendant for breach of contract, then possibly the continuing obligations to make payments under the leases might be a head of damage, but the plaintiff has not adequately made out a case for relief (which will have to be equitable) to set aside, or preclude the enforcement of, the lease and debenture which have been entered into.
83 The allegations of delay by the defendant in supplying machinery and equipment were simply answered by Mr Patrick Lam. He pointed out that the plaintiff was slow to provide the security to enable the plaintiff to execute the security documents for the leases; hence the delay in the supply of the leased machinery and equipment.
84 6. Area B
85 It is not in dispute that, on 11 August 1991, the plaintiff was asked to go to Area B to extract granite. According to the plaintiff's further and better particulars, the request was made orally by "Patrick Leong" (obviously in error for Mr Patrick Lam) on behalf of the defendant to Mr Wong Sin Fu on behalf of the plaintiff. Since Mr Wong was not called to give evidence, Mr Lam's account of the request could not effectively be challenged unless it was inherently incredible or contradicted by other evidence. Mr Lam's evidence was that in August 1981 the plaintiff had not started actual production in Area A. Because of the slow progress and the defendant's urgent need for granite, Area B was given to the plaintiff as an additional area to help the plaintiff meet the defendant's production requirements. The defendant, however, still regarded the original contract as valid for Area A except that by mutual agreement the plaintiff also extended its operations to Area B. Area B was therefore an additional area of work and not an area in substitution for Area A. Indeed, after the plaintiff commenced operations in Area B, the defendant continued to ask the plaintiff to start production in Area A, and the plaintiff then carried on operations in both Areas A and B until November. On 7 November 1981, the plaintiff, while blasting in Area A, caused damage to a neighbouring house. Shortly after this, its blasting licence was suspended by the government, which imposed a condition that the plaintiff had to erect a 36-foot high fence next to the damaged house before being allowed to re-commence blasting. This was never done, and the plaintiff's blasting licence remained suspended until the termination of the contract. Accordingly, as from this time the plaintiff was unable to carry out any further blasting operations in Area A.
86 Some of this evidence was disputed by the contemporaneous correspondence from the plaintiff, but essentially I accept Mr Lam's evidence on this point, particularly as Mr Lam was not cross-examined on the circumstances of his oral request to Mr Wong Sin Fu.
87 The pleadings dealing with this issue are as follows. Paras 21 and 22 of the statement of claim state:
88 21. In or about August 1981, the Defendants, in breach of their obligations, requested the Plaintiffs to start production at another site outside the quarry (hereinafter referred to as "Area B") which the Plaintiffs did.The said Area B is only 5 acres in size, with an initial area of only 2 acres. However, despite the Plaintiffs' reasonable efforts, production from Area B was still below the requirements of the Contract.The poor production is attributable to the following:-
89 (a) the granite reserve in Area B is also limited, although the Plaintiffs had managed to reach the granite level;
90 (b) the 500 tonnes per hour crusher plant did not perform to full capacity as it could not take the full loads from the biggest dump trucks and loading had to stop regularly to allow the feed hopper to clear;
91 (c) the Isuzu dump trucks leased to the Plaintiffs under the Lease Agreement broke down regularly.
92 22. In consequence of the Defendants' breaches as hereinbefore set out, the Plaintiffs were unable to achieve the production required under the Contract, and were therefore unable to pay the Defendants the hire fees payable under the Lease Agreement. Emphasis added
93 As para 20 of the statement of claim also alleges breach of contract by the plaintiff in failing to strip the overburden to within one metre of the surface of the granite reserve, para 22 must be taken to refer to both paras 20 and 21.
94 Para 19 of the defence states:
95 19. The Defendants deny that they requested the Plaintiffs to start production in Area B in lieu of Area A. Alternatively if the Defendants did make any such request they deny that they were in breach of contract in so doing. The Plaintiffs were not allowed by the Licensing Authority to operate Area A from November 1981 due to a flying rock incident in breach of safety regulation. By cl 10 of the Specification, the Plaintiffs were responsible for the operation and maintenance of the Crusher Plant. The Plant was tested and duly commissioned in the presence of the Plaintiffs' representatives in August 1981 and was handed over to the Plaintiffs. It had the capacity to produce the quantities of rocks required under the Contract. If there had been breakdowns, the breakdowns were due to either mishandling, or misoperation by the Plaintiffs' staff or lack of maintenance by the Plaintiffs. The ISUZU dump trucks were also duly handed over to the Plaintiffs in pursuance to the Lease Agreements (RDC/l1/81, rdc/L2/81 and RDC/L5/81) and if there were breakdowns, the breakdowns were due to mishandling, or lack of maintenance of the trucks by the Plaintiffs. No admissions are made as to any of the allegations set out in sub-paragraphs (a) - (c) of paragraph 21 of the Statement of Claim. (Emphasis added)
96 An application was made by the defendant after closing submissions to amend para 19 of the defence to set out a fuller version of the defendant's case on the Area B issue. This application was vigorously opposed by the plaintiff. Although I felt that neither the statement of claim nor the defence had properly set out the true issues between the parties in relation to Area B, I also felt that, in all the circumstances, I should not exercise my discretion to allow this amendment at such a late stage of the proceedings. The application was therefore denied.
97 That leaves me the task of coming to a decision purely on the pleadings as they stand. The issue as defined by the plaintiff is whether or not the request by the defendant to the plaintiff to start production in Area B was in breach of contract. This is the only issue I have to decide. A breach of contract is explained in Breach of Contract by Associate Professor J W Carter (2nd Ed, 1991) at para 102 in this way:
98 A breach of contract can be established in either of two ways: by proving that the promisor has failed to perform a contractual obligation in accordance with the standard of duty applicable to that obligation within the time stipulated for performance of the obligation; or by establishing the existence of an anticipatory breach.
99 The question is therefore whether the defendant has failed to perform any contractual obligation within the time provided. On the evidence it is difficult to see where there is any breach within either limb of Professor Carter's explanation. The plaintiff has not specified which term of the contract the defendant is alleged to have breached or in what way that term has not been timeously performed. Assuming that the plaintiff's case is that it was supposed to operate in Area A but was given Area B instead, what does the evidence show? Mr Lam's evidence was that the plaintiff was asked to work in Area B in addition to Area A. Admittedly, this was not within the terms of the original contract, but a request to work in a non-contractual area, construed objectively, is merely an offer to vary the terms of the original contract or to enter into a fresh contract. It was open to the plaintiff to accept or decline the offer. On its own pleading and on its own evidence, the plaintiff accepted the offer.
100 It is not necessary for me in this context (although I will do so later) to proffer a legal analysis of the offer and acceptance. It is sufficient for me to say that, on the pleadings, it could not have been a breach of contract for the defendant to request the plaintiff to move to Area B, either in addition to, or in substitution for, Area A. There would only have been a breach if the defendant had denied the plaintiff the right to operate in Area A, and insisted that the plaintiff move to Area B. This, however, is not the pleading nor the evidence.
101 The evidence shows that the plaintiff agreed to operate in Area B; whether it did so wholeheartedly is not the point. What is more important is that the plaintiff was not, after 11 August 1981, denied access to Area A but continued to work there.
102 This can be found in the evidence of both Mr Ong Tiong Lam as well as Mr Patrick Lam. Even in the plaintiff's instructions to its own solicitors dated 5 June 1982, the plaintiff admitted that it was working in both areas since September 1981. The fact that work was going on in Area A is clearly demonstrated by the flying rocks incident on 7 November 1981, after which any issue of breach of contract as far as Area B is concerned must have been academic. The plaintiff, by its own action (in damaging the house) as well as inaction (in not building the necessary fence), had made it impossible for itself to work in Area A.
103 In the light of this analysis, para 19 of the defence may be regarded as an adequate, if not particularly helpful, response to para 21 of the statement of claim.
104 On the pleadings and the evidence, the plaintiff's claims under this head are without substance.
105 It is necessary for me, however, to make a legal analysis of the contractual implications of the move to Area B, as this will bear on the validity of the defendant's counterclaim, which I have to examine later. It is clear that the plaintiff was sufficiently frustrated by its difficulties in Area A (for whatever reason) to accept the defendant's request to move to Area B. Although the plaintiff may have regarded Area B as a substituted area in fact, the evidence is that there was work in both areas and, since there was no denial of access to Area A by the defendant, I must regard Area B as having been treated by the parties in law as an extension of the contract area. The consequence of this is that the work done by the plaintiff in Area B must be regarded as work done pursuant to the contract. It is plain that the parties also came to the same conclusion, as the following matters demonstrate.
106 (a) Para 21 of the statement of claim does not plead the alleged breach of contract as a ground of claim but as a justification for the plaintiff's inability to meet the contractual production requirements. This pleading is in effect an admission that the terms of the original contract still applied to the work carried on in Area B (see the second set of italicised words in para 21).
107 (b) One of the plaintiffs' claims is based on the defendant's alleged wrongful termination of the contract (see section 7 of this judgment). The termination is alleged to have been wrongful because the letter of termination was given under the wrong clause. This contention rests on the premise that, up to the moment of alleged termination, the contract was in full force and effect. If the plaintiff really contends that the work in Area B was not pursuant to the contract, then it should have contended that the plaintiff had no right to terminate the contract on the grounds of non-performance in Area B when the true contractual area was Area A.
108 (c) If the work done by the plaintiff in Area B since August 1981 was truly outside the terms of the original contract, then it is strange that the statement of claim does not include a claim for a quantum meruit.
109 (d) The correspondence and site meeting minutes show that, while there were requests from the plaintiff for sympathetic consideration of its problems in Area B, the plaintiff never took the position that a new contract had to be negotiated for the work to be done there. At one point the following exchange took place between myself and Mr Ong:
110 Court : Why did you agree to go to Area B?
111 A : We did it in good faith to allow RDC time to solve problem in Area A. It would also allow us to generate funds and give us time to talk to RDC about Area A and variation in price for working in Area B.
112 Court : Wasn't it great risk going to Area B when you had no data and did not know how much overburden there was?
113 A : We didn't take it as a risk. We were hoping it would assist us in solving our problems.
114 This is not the language of someone complaining of a violation of his contractual rights. The evidence was that there was no protest by the plaintiff about the move as such, only pleas for additional payments. Obviously the plaintiff was trying to negotiate modifications of the contract (whether relating to the work in Area A or Area B) in its favour wherever possible, but, until 12 May 1982, there was no suggestion that work in Area B was not governed by the existing contract.
115 On 12 May 1982, the plaintiff, after having taken legal advice, wrote to the defendant. The thrust of this letter was that, because the overburden had not been properly removed by the defendant from Area A, the defendant had asked the plaintiff to move to Area B, which was a departure from the contract. The plaintiff had accepted this as a temporary measure, but maintained that Area A was the contract area. The letter went on to give notice of the plaintiff's intention "to repudiate the contract" (sic) unless possession of Area A in accordance with the terms of the contract was given to it within 30 days. The letter concluded by saying that all work had stopped in Area B as the plaintiff was under no obligation to work there. This letter cannot be taken seriously since:
116 (a) it was impossible at that time for the plaintiff to carry on blasting operations in Area A;
117 (b) nothing in the letter of 12 May 1982 indicated that the plaintiff would be taking any steps to make such blasting possible; and
118 (c) the plaintiff had terminated the services of all its workers and sub-contractors with effect from 6 May 1982.
119 The plaintiff's letter sought to give the impression that the cessation of work in Area A was entirely the defendant's responsibility when the facts clearly show otherwise. The plaintiff's refusal to carry on working in Area B effectively meant that it was refusing to do any work at all. In the circumstances, the letter of 12 May 1982 was not only disingenuous, but could only be interpreted as a repudiation of the contract. Although the letter stated that the plaintiff would only "repudiate the contract" in 30 days' time, there was effectively nothing more to be done after 30 days which had not already been done by this letter.
120 I do not think I am precluded from making this analysis by the fact that I have denied the defendant leave to amend para 19 of the Defence. Notwithstanding any pleadings by either side as to the contractual implications of the move to Area B, I must still make this analysis if I am to decide the issue of the validity of the purported termination of the contract, and since neither party has addressed the issue in the pleadings, I am at liberty, and indeed am obliged, to make this analysis for the purposes of my finding in relation to the counterclaim.
121 7. Clause 35 and Clause 34
122 Before examining the substance of the legal dispute it is necessary to recount briefly the relevant facts relating to the purported termination of the contract. All date references in this section are to the year 1982.
123 After the move to Area B, the plaintiff continued to have difficulties in extracting granite and meeting the production targets provided under the contract. Although liquidated damages were payable under the contract for shortfalls in production, these were not at first imposed. The plaintiff also suffered financial as well as operational difficulties. On 29 April, Mr Ong verbally informed the defendant that the plaintiff intended to give up the contract and that he would confirm this intention on 30 April. The next day, however, he requested for more time to consult his solicitors before giving the confirmation. By 1 May, all production of granite had stopped. On 6 May, the plaintiff terminated the employment of all its workers and sub-contractors with immediate effect.
124 On the same day (6 May), the defendant wrote to the plaintiff, pointing out the low production below contractual targets, noting the stoppage of production, and stating:
125 In pursuant (sic0 to Clause 35 of the Contract, we hereby give you notice that should you continue to default in your low production for the next 7 days from the date of receipt of this letter, we shall proceed to invoke our right to terminate the contract without prejudice to our rights for all damages or claims under the said contract. It is not in dispute that the defendant intended to refer to cl 35 of the Specification.
126 This was followed by a letter from the plaintiff to the defendant dated 12 May the terms and effect of which I have discussed in connection with the Area B issue.
127 The defendant followed up its notice of 6 May with various letters in similar vein, culminating in a final notice to the plaintiff on 14 May in the following terms:
128 We refer to the Notice dated 6 May 1982, issued by us to you in pursuant (sic) to Clause 35 of the above Quarry Contract made between you and Resources Development Corporation (Pte) Ltd.
129 We note that since the issue of the aforesaid Notice on 6 May 1982, not only there had been no production of rock at the site, you had terminated the services of all your workers and sub-contractor with effect from 6 May 1982. The enclosed copy of memorandum issued by your General Manager, Mr Wong Sin Fu, confirmed this situation. You have also failed to respond to our letter of 10 May 1982 asking you for immediate clarification of the above situation.
130 We must now and we do hereby give you final notice that should you fail to commence production or should you continue to default in low production for the next 7 days, we shall terminate the aforesaid contract without prejudice to all our rights for losses and damages suffered by us as a consequent (sic) of your breach of the said contract.
131 On 18 May, the plaintiff responded to the defendant's first notice of 6 May and reiterated its position set out in its letter of 12 May. The defendant confirmed that its decision to stop all work in Area B would stand. I have already commented that the letter of 12 May meant in effect that the plaintiff was refusing to do any work at all. The letter of 18 May must be taken to have confirmed that position.
132 After a further exchange of letters between the parties and their respective solicitors, each maintaining their respective positions, the defendant wrote on 28 May to the plaintiff in the following terms:
133 We refer to our Notice dated 6 May 1982 and to our Final Notice dated 14 May 1982 issued by us to you in pursuant (sic) to Clause 35 of the above Quarry Contract made between you and Resources Development Corporation (Pte) Ltd.
134 We now inform you that as there had been no improvement of the situation referred to in the aforesaid notices, we hereby terminate the aforesaid contract with immediate effect.
135 You are requested to vacate the site within 7 days from the date of this letter.
136 On 29 May, the defendant issued a series of letters to the plaintiff terminating the lease agreements of the equipment and machinery and giving notice of repossession. On 1 July 1982, the defendant engaged another contractor, Acme Marine Supply Pte Ltd, to replace the plaintiff. The plaintiff's writ was issued on 11 August.
137 I now turn to an examination of the relevant clauses dealing with termination.
138 There are two clauses dealing with termination in the contract, cl 34 of the Conditions of Contract ( contained in the pink document which was not in the original tender documents but which was attached to the signed copy of the contract), and cl 35 of the Specification (which was part of the original tender document and which was also attached to the signed copy of the contract).
139 Cl 35 of the Specification provided:
140 35. TERMINATION OF CONTRACT
141 A. The Company reserves the right to terminate the Contract if the Contractor:
142 i) fails to produce the specified quantity of granite as per Clause 10 of this Specification; or
143 ii) performs unsatisfactory work in the opinion of the Company; or
144 iii) fails to comply with the Company's instructions; then, if any such default shall continue for seven
145 (7) days after notice has been sent by registered post to the Contractor from the (Superintending Officer) specifying the same, the Company may (without prejudice to any other rights herein contained) thereupon by notice sent by registered post to the Contractor determine this Contract.
146 Cl 34 of the Conditions of Contract provided:
147 34 Determination of Contract by the Superintending Officer
148 (a) Default - If the Contractor shall make default in any of the following namely:-
149 i without reasonable cause wholly suspends the Works before completion;
150 ii fails to proceed with the Works with reasonable diligence;
151 iii refuses or to a substantial degree persistently neglects after notice in writing from the Superintending Officer to remove defective work or improper materials,
152 then, if any such default shall continue for seven days after a notice sent by registered post to the Contractor from the Superintending Officer specifying the same, the Superintending Officer may without prejudice to any other rights herein contained thereupon by notice sent by registered post determine this Contract; provided that notice hereunder shall not be given unreasonably or vexatiously and such notice shall be void if the Company is at the time of the notice in breach of the Contract.
153 These clauses appeared to conflict, as they provided alternative means of termination and the criteria for termination in these two clauses were clearly different. One solution would be to argue that cl 35 of the Specification could co-exist with cl 34 of the Conditions of Contract, the clauses giving the employer alternative means of termination in addition to its common law right of termination. Although there would be events which could give the employer an option of proceeding under either cl 35 or cl 34, the two regimes were clearly separate and in practice confusion could have easily been avoided, since it was a condition precedent to termination under each clause that a notice under that clause be given prior to termination. So long as the employer made it plain in that notice which clause was being relied on, no difficulty would arise in determining the applicability of that clause to the facts of any particular situation. However, viewing the two clauses in context, I feel that the two clauses were not intended to co-exist, in which case I have to determine which of the clauses was intended to prevail.
154 The Specification contained the following paragraph on the "contents" page (which I will call "the preamble"):
155 This Specification shall consist of all clauses herein together with any appendices and attachments. Where specific provisions are made in this Specification, such provisions shall have prevalence over that in the General Conditions of Contract. (Emphasis added)
156 The plaintiff's argument was that cl 35 of the Specification did not apply in this contract because the clause that governed termination was cl 34 of the Conditions of Contract, and since the plaintiff had invoked cl 35 of the Specification, the contract had not been properly terminated. The defendant's purported termination was therefore a repudiation of the contract. The plaintiff's contention was premised on the following factors.
157 (1) Although the Specification was part of the contract, the references to the Specification in the pink Form of Agreement indicated that the Specification was intended to be read only for purposes of describing the work to be executed, rather than as a document containing conditions of contract as such.
158 (2) A reading of the Form of Agreement signed by the parties showed that, where clause references were made, they were to the Conditions of Contract and not to the Specification. (See, for example, the Schedule to the Form of Agreement)
159 (3) Even if the preamble to the Specification were to apply, it could only apply to the "General Conditions of Contract" (which did not exist) and not to the pink document attached to the signed contract which was called "Conditions of Contract".
160 The position of the defence (as expressed by its second leading counsel) was as follows.
161 (1) Cl 35 of the Specification applied, and the conditions for its application had been met.
162 (2) The Specification was clearly part of the contract, and he relied on the preamble to the Specification (quoted earlier) that gave prevalence to the provisions of the Specification over those in the Conditions of Contract. The term "General Conditions" was clearly an error and could be ignored. Even in the absence of this passage, the general principles of construction would allow a specification to take precedence over more general conditions.
163 (3) The parties had always acted on the basis that the Specification prevailed over the Conditions of Contract. For example, cl 29 of the Specification provided that the security deposit could be furnished by way of a bond whereas cl 37(a) of the Conditions of Contract required the security deposit to be in cash. The plaintiff submitted a bond, clearly relying on the Specification rather than the Conditions of Contract. Counsel might also have mentioned that, at the critical period during May 1982 when the final exchange of correspondence was taking place prior to the letter of termination, the plaintiff never took the point (despite being represented by solicitors) that the defendant's notices under cl 35 were being given under the wrong clause.
164 (4) Even if the plaintiff had chosen the wrong clause under which to terminate the contract, an alternative argument was available, namely that the defendant had in fact repudiated its contract by abandoning work and dismissing all its workers before the letter of 28 May. Accordingly, the letter of termination, even if it could not be effective under cl 35 because that clause did not apply, could be construed as an acceptance of the plaintiff's repudiation of the contract.
165 In response to the last point plaintiff's counsel argued that:
166 (a) an acceptance of a repudiation must be expressed as such and the court could not treat an ineffective letter as purporting to exercise an express right of termination as a common law acceptance of repudiation;
167 (b) in any event, this ground was not pleaded.
168 In clarification of this last round of submissions, I asked plaintiff's counsel when (in his submission) the plaintiff accepted the defendant's repudiation (if the letter of 28 May was to be treated as such). Counsel confirmed what was implicit in prayer (a) of the statement of claim, namely that the defendant's repudiation was accepted and the contract was terminated when the writ was issued.
169 In general, I accept most of defence counsel's arguments. My conclusions are as follows.
170 1. The Specification clearly formed part of the contract. It was part of the tender which was submitted by STDK and accepted by the defendant. It was attached to the bundle of documents making up the signed contract which was dated 8 May 1981. There were references in the signed Form of Agreement to the Specification and, even though the language used was not particularly appropriate, it is clear that the Specification was intended to be incorporated into the signed contract. Furthermore, the novation agreement stated that what was novated was the "Principal Agreement", which was defined as the tender submitted by STDK and accepted by the defendant. The Specification was clearly part of the tender (while the Conditions of Contract were not). Finally, the plaintiff itself has accepted that the Specification forms part of the contract (see paragraph 15 of the statement of claim) and has never disputed the binding effect of cll 17 and 18 of the Specification setting out the monthly production targets and the liability for liquidated damages.
171 2. Accordingly, meaning must be given to the apparent discrepancy between cl 34 of the Conditions of Contract and cl 35 of the Specification. This contract followed the general structure of a normal building contract where specifications (drafted with particular reference to the contract in hand) are engrafted onto a set of standard conditions of contract. It is common in these situations to resolve discrepancies between the two sets of conditions by making the customized conditions prevail over the standard conditions, and that is what the preamble to the Specification sought to do. Although it was carelessly drafted by referring to "General Conditions of Contract" when the proper term should have been "Conditions of Contract" I find that, in the context of this particular contract, the error is obvious. The general rules of construction are stated in The Interpretation of Contracts by Kim Lewison (1st Ed, 1989) at pp 183 to 187:
172 As part of the process of construction the court has power to correct obvious mistakes in the written expression of the intention of the parties. ... The mistake to be corrected must be a mistake in expression. It may be a mistake in spelling or grammar; a mistake in the naming of persons referred to: the omission of words or the inclusion of words
173 (and see the authorities cited on those pages). In this case, where the Specification was in the bound copy of the signed contract and was referred to in the signed contract, it was clearly part of the contractual documents. Once that is accepted, a construction must be adopted to reconcile apparent discrepancies between different parts of the contract. While (as I have indicated earlier) it is possible to argue for a construction that allowed for the co-existence of both clauses, I consider the better view to be that one clause applied to the exclusion of the other. The preamble provided a helpful and, indeed, the only sensible way of reconciliation. Accordingly, both in accordance with legal authority, common practice and the specific terms of the contract, I am prepared to hold that cl 35 of the Specification prevailed over cl 34 of the Conditions of Contract.
174 3. However, if I am wrong in my interpretation of cll 34 and 35, I have to determine what was the legal effect of the plaintiff's purported letter of termination of 28 May in the light of the correspondence and events before and after this letter. The plaintiff was quite clearly in repudiatory breach of its obligations under the contract by stopping work and dismissing all its workers and sub- contractors (see Keating on Building Contracts (5th Ed, 1991) at pp 153-154). It was therefore open to the defendant, quite apart from its rights under cl 35 or cl 34 (whichever was applicable), to have accepted the repudiation and terminated the contract. Defence counsel has argued that, if the defendant's letter of 28 May 1982 did not amount to a proper termination of the contract under the express terms of the contract, then it could be treated as an acceptance of the plaintiff's repudiation at common law. I accept this submission in the circumstances of this case for the following reasons.
175 (a) The provision of a specific mode of termination in a contract does not as a rule deprive the parties of their common law rights of termination unless the terms of the clause clearly show an intention to provide a comprehensive and exclusive regime for termination (see Chitty on Contracts (26th Ed, 1989) para 1614 Emden's Construction Law (8th Ed, 1992) Vol 1, Para III(31); Hudson's Building and Engineering Contracts (10th Ed, 1970) p 687; Breach of Contract by Associate Professor J W Carter at paras 779 and 1014; Keating on Building Contracts at p 153).
176 (b) The letter of termination dated 28 May 1982 (which I have reproduced earlier) did not in terms purport to terminate the contract pursuant to cl 35. What it did was, by way of introduction, to refer to the previous notices dated 6 May and 14 May which had been issued pursuant to cl 35. Paragraph two of the letter, which actually terminated the contract, did not make any reference to cl 35. The previous notices of 6 May and 14 May (especially the latter) although purporting to be notices under cl 35, also made it plain that the plaintiff was complaining about the stoppage of work and the dismissal of the workers and sub-contractors. In fact, the notice of 14 May did not itself purport to be a notice under cl 35 and merely gave final notice that if the matters complained about were not remedied within 7 days, the contract would be terminated. In these circumstances, although the language of the letter of 28 May can be said to be ambiguous as to the precise basis on which the contract was terminated, I think this is a case where that letter can be treated as an exercise of the defendant's common law right to terminate on the ground of the plaintiff's repudiation. It is settled law that, if a party refuses to perform a contract, giving a wrong or inadequate reason or no reason at all, he may yet justify his refusal if there were at the time facts in existence which would provide a good reason (see Chitty on Contracts para 1709). Here it seems to me that the worst that could be said of the letter of 28 May is that, if it gave a wrong reason for termination, it was wrong only in the sense that it relied on the wrong clause. It is, however, plain from the letter that the grounds for termination were (or included) the stoppage of work and the dismissal of the plaintiff's workers and sub-contractors, which were clearly events justifying the plaintiff's common law right of termination. A sensible reading of the letter will show that this was being made clear to the plaintiff and accordingly, if the reason given was wrong in that cl 35 was the wrong clause to rely on, I would hold that the defendant is now entitled to rely on the letter as a common law termination.
177 (c) Plaintiff's counsel submitted that an improper termination pursuant to an express termination clause could not be relied on as an acceptance of a pre-existing repudiation so as to effect a common law termination. He relied in particular on Summers v The Commonwealth (1918) 25 CLR 144. That case is distinguishable as the terms of the notice of termination in that case expressly purported to be given under a particular condition of the contract, whereas in the present case the words of termination were not expressed with reference to any particular clause. The other authorities which I have consulted are unclear on the general proposition advanced by defence counsel (see Keating on Building Contracts at p 153); each case appears to turn on the exact wording of the notice. Accordingly, I am satisfied that there is no high authority preventing me from analysing the letter of 28 May in the way I have done. Indeed, Architectural Installation Services Ltd v James Gibbons Windows Ltd (1989) 46 BLR 96, although not a decision of a superior court, supports my approach and is approved by the learned editors of the Building Law Reports (at pp 94 to 95), as well as being cited in various textbooks without disapproval. In this case, there was a clause in a building contract (condition 8) giving the main contractor the express right of termination in certain circumstances provided a prior notice of default had been given. One point in issue was whether, if the purported letter of termination of the main contractor did not properly terminate the contract in accordance with condition 8, the letter could be relied on as a common law termination, on the assumption that there had been a repudiation by the sub-contractor by withdrawing his workers. The sub-contractor argued that condition 8 was not prefaced by the words "without prejudice to other rights and remedies" and the absence of these words suggested that other rights and remedies were excluded. This argument was rejected by Judge Bowsher QC who went on to say:
178 I see no reason at all for any implication of any term to the effect that condition 8 of the contract is to be the only machinery for terminating the contract, to the exclusion of common law rights of termination. Indeed, if it were the case that condition 8 provided the only means of terminating for breach, that would produce a nonsensical result in a situation which may not be common but is not unknown. If the plaintiffs are right and condition 8 excludes any common law right to terminate, if the plaintiffs were to say to the defendants, "We are leaving the site and we shall not return and we shall not change our minds about this", the defendants would still have to go through the two-notice procedure in order to terminate the contract. That seems to me to be contrary to any business sense. For the reasons set out earlier in this judgment, I find that the provisions of condition 8 of the contract exist side by side with the common law rights to terminate the contract.
179 I adopt these words, not because they emanate from high authority, but because they represent good legal sense; they also apply to the fact situation in the present case.
180 A curious situation has arisen on the pleadings. Paras 24 and 25 of the statement of claim plead that the defendant wrongly exercised its power under cl 35 of the Specification to terminate the contract. Para 21 of the defence merely contends that its notice of 28 May 1982 properly determined the contract, and denies paras 24 and 25 of the statement of claim. However, para 27 of the counterclaim (as originally pleaded) suggested that the ground of termination was cl 35 of the Specification. I see no obstacle to the issue of common law termination being raised by way of defence since:
181 (a) that defence is consistent with para 21 of the defence; and
182 (b) the plaintiff has never apparently requested for further and better particulars of para 21.
183 However, insofar as the counterclaim was concerned, I indicated to defence counsel that an amendment to the pleadings would be necessary or desirable if the defendant intended to rely on this ground. An application was duly made to amend para 27, albeit after the close of submissions. I allowed the application in part. As the plaintiff has appealed against my order, the reasons for my decision are set out separately. The result of my order is that paras 27 and 27A of the counterclaim now reflect the defendant's reliance on its letter of 28 May, both as a contractual termination pursuant to cl 35 and as a common law termination by acceptance of the plaintiff's repudiation.
184 In response to these amendments, the plaintiff has filed a long amended reply and defence to counterclaim. A new defence has been raised, denying the defendant's right to terminate the contract under cl 35(A)(i) of the Specification. At the time of the disputed termination the plaintiff was (at the defendant's request) producing crusher run rather than granite dust, which was originally provided for under the contract. The plaintiff now alleges that the arrangements for crusher run were the subject of a separate contract and not the contract which is the subject of this suit; hence failure to produce crusher run is not a ground for termination. The evidence shows clearly that both parties agreed to substitute crusher run for granite dust as the contractual product, and that both parties treated the plaintiff's production (or lack of it) as governed by the original contract. Like the move to Area B, these arrangements were never properly formalised, but I see no difficulty in finding that the parties had agreed to a variation of the contract so as to encompass these arrangements within the contractual framework. The other new defences raised can be dismissed in view of the other findings I have made earlier in this judgment.
185 One other possible analysis of the situation (which was not canvassed by either counsel) is that, following the defendant's letter of 28 May, the contract had been discharged by abandonment. This is not a commonly invoked doctrine, but a short analysis will be found in Breach of Contract (at para 1216). The doctrine was explained by the House of Lords in Paal Wilson & Co A/S v Partenreederei Hannah Blumenthal (1983) 1 AC 854 at p 914 to 916 and 924, and applied by the High Court of Australia in Summer v Commonwealth of Australia. Discharge occurs through the conduct of the parties establishing either an express or implied agreement to abandon. It seems to me that an arguable case could be made out for the application of that doctrine here, but, as it has not been pleaded, I make no finding on this point.
186 I therefore dismiss the plaintiff's various claims with costs. Plaintiff's counsel also made various claims in the course of the trial for reliefs which have not been pleaded. Despite invitations from me to amend, he declined to do so. I therefore make no findings on those claims.
187 Since I have already held that the termination of the contract was lawful, it follows that the defendant is entitled to damages in respect of its counterclaim. In the course of the trial, I indicated to the parties that the matter of damages would be referred to the Registrar for assessment. The parties have not therefore led evidence on damages. I need, however, to make one finding on a matter of principle. The defendant's counterclaim includes a claim for liquidated damages. I need to consider whether there is any defence to this part of the counterclaim.
188 As the plaintiff has repeated its statement of claim by way of defence to counterclaim, it may be thought that paras 21 and 22 of the statement of claim (which I have discussed earlier) may be relevant as a defence to para 29 of the counterclaim (as amended). Since I have already found that Area B was treated as an extension of the contract area, the provisions as to liquidated damages would also apply to work in Area B, and the defendant is entitled to liquidated damages for shortfalls in production of the contractually guaranteed amounts.
189 The factors raised in sub-paras (a), (b) and (c) of para 21 (which have been reproduced earlier) have simply not been proved by the plaintiff and, in any event, cannot be defences to a claim for liquidated damages as the matters referred to in those sub-paragraphs are not conditions precedent to liability. If pleaded in a different way, they might have been grounds for a claim for damages by the plaintiff against the defendant, but that is now academic.
190 The amended reply and defence to counterclaim also pleads obliquely a new defence to the claim for liquidated damages, namely that the plaintiff was not in breach of its obligation to produce the specified quantities of granite because it was producing crusher run under a separate contract, and not granite dust as provided under this contract. I have dealt with this defence earlier in the judgment.
191 In the circumstances, I find that the defendant is entitled to counterclaim for the amount of liquidated damages based on the agreed contractual figures (as varied by mutual agreement from time to time).
192 I must therefore give judgment in favour of the defendant on its counterclaim for damages to be assessed by the Registrar and costs to be taxed if not agreed.
193 There is also a prayer for a declaration that the various security documents entered into by the plaintiff in connection with the leasing of equipment and machinery from the defendant are valid, subsisting and enforceable. I make no order on the defendant's counterclaim for a declaration as:
194 (a) it is unnecessary, having regard to my dismissal of the plaintiff's claim for a declaration to the opposite effect; and
195 (b) insofar as I am asked to declare the documents valid subsisting and enforceable, I have heard no arguments relating to the documents other than the two mentioned by the plaintiff.
196 I close with a general remark. The amounts involved in this contract were not small. It is not clear how much legal advice was taken by each party in the course of the preparation of the contractual documents and during the course of the administration of the contract. Many of the points which have occupied so much time and argument before me could have been avoided (or even decided differently) if the documents had been more carefully drawn, and the parties had taken certain legal steps during the course of the contract to protect their respective positions. In the case of the plaintiff, that lesson will have been learnt too late. The plaintiff, as a publicly listed company which is engaged in numerous major contracts, would do well to pay greater attention to the legal implications of the way in which they carry on their business.
197 (This merits reporting)
Manjit Singh with Darshan Singh and Arivanantham Krishnan for the plaintiffs
Lee Chow Soon and Davinder Singh with John Ng and Sushil Nair for the defendants