Engineering Construction (Pte) Ltd v Sin Heng Heavy Machinery Pte Ltd and Another
[1993] SGHC 125
Suit No 1564 of 1988
Warren Khoo L H J
04 June 1993
1 Judgment:
2 Coram : Warren L H Khoo, J
3 C A V
4 J U D G M E N T
5 The plaintiffs were the main contractors of a housing project at Eastern Lagoon. They had an Edilmac tower crane which had to be dismantled when, nearing completion, they had no further use for it. They engaged the 1st defendants and 2nd defendants to do the job. The 1st defendants were to supply a truck crane. This was to lift the dismantled parts of the tower crane and take them down to the ground .
6 The 2nd defendants were responsible for taking the tower crane apart to place the parts on the hook at the end of the fly jib of the 1st defendants' truck crane for the parts to be taken down to the ground.
7 The dismantling work took place on 20 August 1984. The 2nd defendants' workers, 4 of them, went up the tower crane. They proceeded with the dismantling work. Everything went on smoothly until they reached the swing table. They had intended to dismantle that as a part by itself. But they had trouble taking out the bolts.
8 In circumstances which are of controversy, the 2nd defendants' workers decided to go further down the truck crane and undo the parts there. It is not disputed that what eventually was placed on the hook of the truck crane consisted of not only the swing table but also the telescopic mast and a 4- meter section of the basic mast. The whole thing proved to be too heavy for the fly jib of the truck crane. As the load was swung clear from the remaining mast section of the tower crane, the fly jib suddenly buckled over at its base. The fly jib together with its load fell to the ground from a height of some 70 metres. Fortunately, no one was hurt.
9 It is clear that the accident happened because of the over-load. What is in controversy is who was responsible for it. Each of the parties blames the other two.
10 The plaintiffs claim the cost of replacement of the damaged swing table, telescopic mast and the basic mast section. This has been agreed at $96,105. The 1st defendants make a counterclaim of $30,908.50 against the plaintiffs, but not the 2nd defendants, for the cost of replacement of the damaged fly jib.
11 The undisputed facts The lifting capacity of a truck crane is not a fixed figure. Broadly speaking, it depends on the length of the main beam, the length of the fly jib, and the angle at which it operates. With a 240-foot main beam and a 50-foot fly jib operating at a 10o offset angle, the lifting capacity of the truck crane in question was 5.89 metric tons. This is the figure that the truck crane operator would work to, although there is some safety margin outside the rated capacity. I think it is 20% (according to Mr Liem).
12 It is also not disputed that the weight of the swing table was approximately 6 metric tons, the 7-metre telescopic mast was approximately 2 metric tons, and the 4-metre basic mast section was about 1.5 metric tons. So the combined weight was roughly 9.5 tons.
13 The disputed facts Mr Tan Ah Lye, the managing director of the 1st defendants, said that before accepting the job, he went to the site to find out the height of the tower cranes, and also the weight of the heaviest part the truck crane was expected to lift. Mr Eng, who was not called as a witness, told him that the weight of the heaviest part would be about 5 tons. Mr Tan went back to his office, and after checking the chart in his manual, he saw that at the height at which the truck crane was to work, it could take 5.89 tons. So he told Mr Eng that he could take the job. Mr Tan says he also gave Mr Eng a copy of the lifting capacity chart. He does not say why he should have done so.
14 Separately, the plaintiffs concluded a contract with the 2nd defendants for dismantling the tower crane.
15 Events of 20 August, 1984 The truck crane was brought to the site on 19 August. On the morning of 20 August, Mr Tan of the 1st defendants went to the site. Mr Chia, his operator, was there, with an attendant. Then Mr Toh, the boss of the 2nd defendants, arrived with a crew of 4 Malay riggers. Mr Tan said that Mr Toh asked the operator Mr Chia what was the maximum weight the truck crane could take, and Mr Chia told him that it was 5 tons. Mr Tan apparently did not speak to Mr Toh. He left the site. Mr Chia, the 1st defendants' operator, says that he told Mr Toh that the crane could lift no more than 5 tons, and Mr Toh told him there was no problem as the heaviest piece to be lifted was only 4 tons.
16 Mr Chia says that his boss Mr Tan had told him that the heaviest piece he had to lift would be 5 tons. He did not tell him which piece was referred to.
17 During the operation, Mr Chia says he followed the direction of the 2nd defendants' Malay riggers, through the walkie talkie, as to when to lift, to swing and to lower the parts which had been dismantled. On the ground level where he was, he could not see what was going on at the higher points of the tower crane. He had to rely on the Malay riggers. He expected them to ensure that the load placed on his truck crane would not exceed 5 tons.
18 Mr Toh says he also met Mr Tan. He cannot remember what they talked about except that Mr Tan told him that his truck crane could take "at least 6 tons".
19 Mr Toh says that when his riggers reached the swing table, they had difficulty loosening the bolts. They could not detach it from the basic mast. He was on the top floor of an uncompleted building about 20 to 30 feet away from the riggers, and they told him that they proposed to go further down and unscrew the basic mast. He told them to contact the crane operator (Mr Chia), and it was the crane operator who suggested that they go further down and undo the mast. The riggers communicated with Mr Chia by walkie talkie.
20 Mr Toh is singularly vague as to how he communicated with his workers without a walkie talkie, and why he did not equip himself with a walkie talkie in the first place. I find it strange that he as the supervisor should have left it to the riggers to speak to Mr Chia about the problem.
21 Mr Toh says that he did not know the weights of the various parts of the tower crane because the plaintiffs' Mr Eng refused to give him the information. However, his counsel did not challenge Mr Chia's evidence that Mr Chia had told him the truck crane could lift no more than 5 tons.
22 My views Each of the parties in this suit seeks to blame the other two for the accident. Their fact witnesses gave evidence largely tailored to the case the parties wished to put forward. My impression is that none of them told me the whole truth. I have to test their evidence for inherent probabilities. However, I think I can satisfactorily deal with the case without having to unravel their conflicting evidence.
23 I accept the evidence of Mr Ng for the plaintiffs that the plaintiffs gave the contract to the two defendants because they were experienced in this kind of work. This is confirmed by the witnesses for the defendants themselves.
24 The question of the maximum weight which had to be lifted was a matter of great interest and concern to the 1st defendants. The truck crane was an expensive piece of equipment, and Mr Tan had every reason to want to ensure that it would not be overloaded. When he found out from Mr Eng that the heaviest piece, i.e. the swing table, would be about 5 tons, he was sure he could take the job, and he undertook it.
25 The evidence of Mr Toh shows that he accepts that it was his duty to ensure that his workers would not put an excessive load on to the crane. He told the court that in all his previous jobs of dismantling tower cranes, he always made it a point to find out the weight. On this occasion, too, he tried to find out from Mr Eng.
26 I think the fact that Mr Toh's workers tried at first to separate the swing table is of some significance. It indicates that this is what they had intended to do before they started work. Had they been able to carry on as they had intended, the accident would not have happened. Unfortunately, instead of taking out the swing table as a unit, they had to take it out with the telescopic mast and a section of the basic mast.
27 The 2nd defendants seek to put the blame on the 1st defendants by saying that this was done on the suggestion of Mr Chia the operator. I find it difficult to accept this. It was not put to Mr Chia when he was on the witness stand or to any other witnesses. Counsel was not able to explain why this was not done. It all seems to me to be a last-minute afterthought. Mr Toh was supervising the riggers. I think the fatal decision to take a larger chunk of the tower crane instead of the swing table alone was probably taken by him.
28 There is evidence, given by one of the 1st defendants' expert witnesses, that tower crane dismantlers equip themselves with a scale to ensure that what they put on the truck crane would not be too heavy. The 2nd defendants did not challenge this evidence. I have to assume that they accepted it.
29 On the other hand, on his own admission, Mr Tan of the 1st defendants knew that the heaviest part of the tower crane was the swing table and its weight alone would be close to the maximum load that the truck crane could take (5 tons versus the capacity of 5.89 tons). He admitted that he knew that the telescopic mast was joined to the swing table, and that the two combined would exceed the capacity of his truck crane. Yet he did not tell his crane operator or anyone else to ensure that the two should not be taken down together. He must have seen that Mr Toh did not come equipped with a scale. He had no reason to assume that Mr Toh knew that the swing table alone would be all that the crane could take. Yet he did not speak to Mr Toh, let alone warn him. I find it rather strange that Mr Tan did not have any discussion at all with Mr Toh as to how the dismantling work was to be done. He merely left it to the crane operator to tell Mr Toh that the crane's maximum capacity was only 5 tons.
30 In these circumstances, I think both the 1st defendants and the 2nd defendants contributed to the accident, the 2nd defendants perhaps a shade more to blame.
31 I find that the plaintiffs were in no way responsible. They were entitled to leave the whole operation to the defendants. I find no merit in the 1st defendants' counsel's suggestion that the plaintiffs were in breach of a statutory duty under regulations made under the Factories Act in not appointing a person to supervise the operations. This point, not pleaded, was not pursued with vigour. I do not see how such a duty could have arisen.
32 In the circumstances, judgment is to be entered against the 1st and 2nd defendants for the plaintiffs' claim of $96,105, with interest at the rate of 6% p.a. from 17 May 1989, the date of the amended writ, both to be apportioned in the ratio of 60 : 40 in favour of the 1st defendants.
33 I award the plaintiffs their costs of this action on the same basis.
34 I dismiss the 1st defendants' counterclaim. Since the facts supporting the 1st defendants' defence and their counterclaim are inextricably bound up together, no separate costs in the counterclaim are awarded.
35 Dated this 4th day of June, 1993.
Roland Wong for the plaintiffs
S Rai for the 1st defendants
Andrew Tan for the 2nd defendants