This judgment is subject to final editorial corrections approved by the court and/or redaction pursuant to the publisher’s duty in compliance with the law, for publication in LawNet and/or the Singapore Law Reports. |
Computer-Aided Design (Asia) Pte Ltd v Sime Darby Singapore Ltd t/a Sime Darby Systems
[1993] SGHC 195
Suit No 9889 of 1985
Karthigesu JA
19 August 1993
1 Judgment:
2 Coram: Karthigesu J
3 Cur Adv Vult
4 J U D G M E N T
5 The plaintiffs' claim in this action is for special and general damages arising from the purchase of computer equipment from the defendants which comprised of a Versatec Electrostatic Plotter Model 8236F, a Versatec Random Element Controller Model 780-11, a Versatec Random Software (`Versatec equipment') and cables and terminators (`accessories') and which the plaintiffs contend the defendants not only agreed to sell but also to install and make fully operable in an environment described and supplied by the plaintiffs and made known to the defendants. The environment so described and supplied was that the `Versatec equipment' would plot drawings on-line produced by CADAM software in a particular software and hardware operating environment, namely an IBM 4341 CPU and/or IBM 3083 CPU owned and operated by McDermott South East Asia Pte Ltd (McDermott) with a prime operating system of VM/370 with IBM 3250 CADAM work stations attached through control units to the CPU with the `Versatec equipment' being used to plot the drawings produced on the IBM work stations according to systems software and CADAM software as required by the plaintiffs' clients. CADAM is the acronym for Computer-Graphics Augmented Design and Manufacturing, a computer software originally designed by The Lockheed Corporation for the aircraft industry and subsequently adopted to be used in a variety of design and drafting applications which can operate on a number of mainframe computers, including those manufactured by IBM. The plaintiffs' complaint was that the `Versatec equipment' was not fit for operation in this environment in consequence of which the plaintiffs were forced to close and discontinue its CADAM operations and thereby suffered loss and expense. The plaintiffs claim damages therefor.
6 Roger Arnold Prior (Prior) was the managing director of the plaintiff company which he and his wife incorporated in April 1983, principally to provide computer bureau services. The provision of computer bureau services included the supply of computer aided design systems (CAD) CADAM software, display systems, digitizers and plotters; the integration of such a system into a working system; the maintenance, modification and enhancement of the CADAM system; education services in all aspects of the use of CAD systems; the supply, installation and maintenance of graphics terminals and controllers and CAD time-sharing service offering the CAD system on IBM's hardware (the McDermott CPU). This was an ambitious programme for Singapore in 1983 and accordingly Prior set about it very cautiously.
7 Prior had worked in the computer industry for about 18 years prior to 1983, 14 of which was with IBM. He had some general computer skills but they were in the software area. In fact when Brian Elson (PW-4) managing director of the defendants at the material time in 1983 was asked of his impression of Prior said:- `My impression was that Prior was a businessman with little in depth knowledge of hardware. More knowledge of software. A skilled user.' Having listened to Prior over several days giving evidence I am satisfied that he indeed was a skilled user of computers, with sufficient knowledge of both hardware and software, but considerably more knowledgeable of software, to take an intelligent and inquiring interest in the operational aspects of computers but not with sufficient knowledge or skill for himself to inquire into and put right technical and operational problems.
8 Prior knew of a computer bureau service in Sydney, Australia, Auscad, and that is where he went in February 1983 when he had decided that he would set up a computer bureau service in Singapore. His object was to find out for himself the operating system of Auscad whose computer bureau service had proved a success. He found that Auscad was using an IBM 4341 central processing unit (CPU) to which were attached disks, a tape unit, operator console, CAD and CAM work stations and a Versatec 8236F electrostatic plotter, control unit and software. The CAD/CAM software they were using was CADAM. Prior discussed with John Thomas Brown (PW-1) who gave evidence at the trial and who in February 1983 was associated with Auscad why Versatec plotter was chosen in preference to any other type or make of plotter. He discovered that Auscad had chosen Versatec because of the reputation and the reliability of the agent in Australia and the support Auscad had received from Versatec in the United States of America. Furthermore Versatec being an electrostatic plotter, the output was faster than a pen plotter.
9 Although when giving evidence Prior said that he looked upon Auscad as a model for him to follow I do not take that answer as meaning that Prior would use the Versatec equipment in Singapore without further investigation as to its suitability simply because Auscad were using it and using it successfully in an environment similar to that which he intended for his computer bureau service. When this was suggested to him in cross-examination his answer was:- `No I was not satisfied that Versatec plotter was the one for me.'
10 Immediately on his return to Singapore Prior got in touch with Versatec in the USA to find out whether Versatec had distributors in Singapore and who they were. He was referred to the defendants. Prior knew Brian Elson (PW-4) who was then managing director of the defendants and Prior arranged to meet him over lunch to discuss his project. During this meeting Prior told Brian Elson of his visit to Auscad and what he had seen there. He told Brian Elson that he was interested in Versatec as Auscad were successful with their use of Versatec. Brian Elson was interested too since the defendants were agents for Versatec. Brian Elson talked of the possibility of using Prior's site as a demonstration site for Versatec plotters and offered a concessionary purchase price if Prior chose the Versatec system. This meeting with Brian Elson was on 22 March 1983 and was treated by Prior as exploratory.
11 Prior did not rush into buying the Versatec equipment straightaway. He made several inquiries of the defendants on the telephone particularly with Carmen Chang (DW-3) the defendants' acting product sales manager at the material time. Not being satisfied with the information he was getting from Carmen Chang, Prior arranged to meet her at the defendants' office on 14 June 1983. However when he turned up for the meeting Carmen Chang was not available and he had to see one of her assistants, Paul Pang. During the discussions with Paul Pang, Prior was given some produce brochures of Versatec which had the defendants' chop on them. He was also given some of the defendants' own brochures or had them sent to him earlier. From the latter he learnt that the defendants held themselves out as follows:- `Asean's largest multi-national' providing `a wide range of products and services for total solutions to clients' information needs'; `capability in integrating hardware, software development and data communications is available to meet the varied needs of clients'; `our workshops provide maintenance of hardware products. Continuous support for all systems installed by us come from our core of professionally trained staff'; `as regional representatives for Versatec electrostatic printers and plotters, Sime Darby Systems provides state-of-the-art colour and black and white printers and plotters to clients involved in computer-aided design and manufacturing (CAD/CAM)'. From Versatec's brochures one significant statement influenced his decision, as he said in evidence. It read:- `Versatec electrostatic plotters are available through all leading CAD system houses as well as on a direct basis. Over 90% of all Lockheed CADAM systems now sold by IBM use Versatec equipment.'
12 The plaintiffs' contention was that there was one agreement or contract for the purchase of the Versatec equipment and accessories which was partly oral and partly in writing and the oral part included the meeting of 13 July 1983 between Prior, Brian Elson, Lim Soon Hock and for part of the time Carmen Chang. As already noted Brian Elson gave evidence for the plaintiffs and Carmen Chang gave evidence for the defendants. Lim Soon Hock, who at the material time was manager of the defendants, being directly under Brian Elson and Carmen Chang's superior did not give evidence. The written part of the contract is evidenced by four key letters referred to at the hearing as PB 61, 156, 157 and 180. According to the plaintiffs this contract which was partly oral and partly in writing was concluded in or about November 1983.
13 The defendants contend that there were in fact two contracts. The first contract was evidenced in writing by the four key letters, PB 61, 156, 157 and 180 and was for the purchase of the Versatec equipment which was concluded in or about November 1983 and the second contract was an oral contract for the purchase of the accessories concluded in or about December 1983.
14 The evidence is that following the meeting of 13 July 1983, which I have mentioned above and to which I will refer in greater detail in a moment, the defendants made an offer to the plaintiffs for the Versatec equipment. This is contained in PB 61 and was received by the plaintiffs on or about 15 July 1983. The plaintiff did not take up the offer. In October 1983 Prior met Carmen Chang and asked her whether the defendants' offer contained in PB 61 was still valid. She replied that it was and Prior told her that he would soon order the Versatec equipment for delivery in December. After this meeting with Carmen Chang in October 1983 Prior learnt that he would get a larger discount if he ordered the Versatec equipment directly from Versatec and inquired of Brian Elson whether in that event the defendants would still maintain the equipment. Brian Elson assured him that the defendants would but in any event suggested that his people contact Versatec first. A few days later Carmen Chang telephoned Prior with the information that if he confirmed his order by 25 November he would be given a special price. Prior asked for written confirmation and got it from the defendants on 9 November 1983. This is PB 156. Prior confirmed immediately, PB 157. PB 180 is dated 21 November 1983. Apart from thanking the plaintiffs for the placement of the order for the Versatec equipment and confirming the price at US$55,000 it reminded the plaintiffs that the defendants were still awaiting the plaintiffs' decision on the accessories.
15 The defendants' offer (PB 61) did not include the cables and accessories. Prior himself did not overlook this as according to his evidence he was going to contact the defendants for the specifications. These are the cables to connect the Versatec equipment to McDermott's CPU, but then Carmen Chang telephoned in December to say that he must order the Versatec standard cables from the defendants so that they could be supplied together with the Versatec equipment. It is on this basis that defendants' counsel based his `two contract' argument. He was at pains to do this to show that the first contract evidenced by the four key letters PB 61, 156, 157 and 180 was a `simple one' and to use his words `was for the sale supply and installation of the Versatec equipment. No more, no less.' and accordingly there could not be implied in it any obligation on the part of the defendants to make the Versatec equipment fully operable in the plaintiffs' operating environment. I am afraid that this artificial and contrived argument just begs the question. Whether there was one contract for the purchase of Versatec equipment and other for the purchase of the cables and accessories does not and in my view cannot resolve the question of whether there was any obligation on the part of the defendants to make the equipment they have sold, the Versatec equipment, fully operable in the plaintiff's operating environment. If as defendants' counsel put it the contract was to sell, supply and install the Versatec equipment the question for determination is what is meant by install.
16 It is evident from the facts I have narrated that the purchase of the Versatec equipment by the plaintiffs from the defendants was discussed and negotiated over a period of about eight months from March 1983 to November 1983. There is also not one single document that can be referred to as the contract. In this situation one must look not only at the written exchanges between the parties but also at the oral exchanges to determine what the contract is. This approach taken by the plaintiffs is not inimical with the law and does not in my view offend what is commonly referred to as the parol evidence rule. Further s 4(1) of the Sale of Goods Act admits of a contract of sale of goods partly oral and partly in writing.
17 I must now refer in some detail to the meeting of 13 July 1983 following which the defendants' offer as contained in AB 61 was made on 15 July 1983. As already observed those present were Prior, Brian Elson, Lim Soon Hock and Carmen Chang for part of the time. All except Lim Soon Hock gave evidence at the trial.
18 Prior's evidence was as follows:-
19 `I told them again what I was going to establish. I told them that McDermott had an IBM CPU which they were going to upgrade. I was to going to buy the excess capacity from McDermott. I said I would be installing CADAM software.
20 The IBM VM/370 operating system, which McDermott was using, would be used.
21 IBM 3250 work stations would also be used. Also the Vector General work station.
22 My operation was on-line. I explained that this was the purpose and the plotter would be used for that purpose.
23 Elson said he was aware of the system although none in Singapore.
24 I said I would not be employing any computer technical people. I said I would look to Sime Darby to install both the hardware and the software equipment.
25 They gave me the impression that they would have no problem in installing the whole of the system.
26 Elson offered to increase the discount for the plotter. They also said they would like to use my site as a demonstration site for the Versatec plotter.'
27 Elson, so far as he could remember, confirmed the evidence of Prior. He said:-
28 `1983 discussion with Prior. Cannot recollect details.
29 On the purchase of Versatec, I do remember talking about price, offer good deal if it could lead to further business. Full support for installation. Ongoing support. Installation not defined at the time. Normal in business was to install and leave him with a working system.
30 Normally when the defendants sold equipment we did not hand over until it was a working system. Local tests and working tests in its working environment.
31 In Singapore in 1983 "turn-key" not used for this type of installation.
32 "Turn-key" - installation of a complete system.
33 This was system integration, i.e integrating this system with McDermott's.
34 Yes, we were given the details of McDermott's equipment. This would be very relevant.'
35 Elson was cross-examined quite severely on this part of his evidence. This is what he said when cross-examined:-
36 `Q: Assume that the control unit, Versaplot and the Versatec plotter are delivered and they work after being tested by tests which are recommended by Versatec, would you have considered that Sime Darby would have discharged its obligations.
37 A: My personal view is that Sime Darby would not have perceived it as discharging its obligations until it had an acceptance note from the client. That would be predicated on their system completely working.
38 The position was "we would supply our peripherals; we will plug them in with IBM; if we have to make adjustments to our peripherals we will do so; if IBM has to adjust its CPU it will do so; so they can all work together.
39 Yes, I would expect Sime Darby to have managed that interface, not to have the client involved.'
40 As noted already several times, Lim Soon Hock who was present throughout the meeting on the 13 July 1983 was not called by the defendants to throw more light on what was discussed and agreed, either expressly or by implication, between Prior and Elson. Lim Soon Hock is in truth the defendants' witness. I was not told whether or not he was still in the employ of the defendants. As for Carmen Chang, she was called by the defendants but apparently she was not present for any of the material parts of the conversation or if she was, she has forgotten them. This is what she said when cross-examined:-
41 `Meeting in July 1983 with Brian Elson and Lim Soon Hock.
42 Yes, when I arrived it appeared meeting going on for some time.
43 Q: Did you hear Prior describe the bureau he was going to set up.
44 A: Don't remember.
45 Don't recall he mentioned McDermott's or 3803 mainframe or VM operating system. If he did I do not recall; or IBM 3250 and Vector General work stations; or whether it was to be on-line.
46 I do not recall Elson mentioning CAD bureau although none in Singapore; or that he wanted to use the site for demonstration purposes but I would not be surprised if he did as it is quite common to do this.
47 Do not recall Elson offering to increase the discount.
48 Do not recall someone saying that we had installed Versatec plotter before but in a different environment. I would not be surprised if someone had said this as we have done this before.
49 Do not recall someone suggesting to Prior that he used an off-line environment.
50 ...
51 I do not recall Prior saying that he would not be engaging technical personnel.'
52 All in all I consider Carmen Chang a most unhelpful witness. She added nothing to resolve the defendants' most important aspect of its defence that there was no agreement, express or implied, that there was no obligation on its part, having sold the Versatec equipment to the plaintiffs, to make it fully operable in the plaintiffs' working environment.
53 The only evidence before me on this crucial aspect of the defendants' defence was that from Prior and Brian Elson. Although Brian Elson a former managing director of the defendants gave evidence for the plaintiffs, I found him to be a reliable witness who maintained his impartiality aplomb. I had not hesitation in accepting his evidence as to the defendants' understanding of its obligation of installing the Versatec equipment once it was sold to the plaintiffs. Quite clearly the understanding reached at the meeting on 13 July 1983 between Prior on behalf of the plaintiffs and Brian Elson on behalf of the defendants was that the defendants would make the Versatec equipment fully operable in the plaintiffs' working environment that is to say `would plot drawings on-line produced by CADAM software in an operating environment, namely on IBM 4341, CPU and/or IBM 3083 CPU owned and operated by McDermott with a prime operating system of VM/370 with IBM 2350 CADAM work stations attached through control units to the CPU with the Versatec equipment', and I accordingly so find. I am also satisfied from the whole of the evidence on this point that had there been no such understanding reached on 13 July 1983 the plaintiffs would not have bought the Versatec equipment from the defendants. I fully accept Prior's evidence:-
54 `If Sime Darby had said before purchase that their duty was to deliver and self test and not their responsibility that it worked in the environment I would not have ordered it.'
55 A great deal of evidence was led at the trial of the conduct of both parties once the Versatec equipment had arrived and for a period of approximately four months thereafter during which time the defendants were trying to get the Versatec equipment fully working together with McDermott's CPU without a hitch. I need not go into details. I do not think that going into the technical details will help solve the legal questions of the plaintiffs' claim. Suffice it to say that there were many problems which may be classified as teething problems. However there was one problem with the Versatec plotter which could not be so classified. The problem was that the Versatec plotter could not plot from CADAM. Yet when the 14 test plots were carried out the Versatec plotter was able to turn them out perfectly properly. This quirk had everyone guessing and now with hindsight one is able to say with a degree of confidence that the problem lay in the fact that McDermott's CPU's operating system was VM/370 with which the defendants were unfamiliar. Their previous experience was with a CPU operating under the MVS system.
56 All central processing units (CPUs) have a piece of software called the missing interrupt handler (MIH) which in the case of the IBM can be set for up to 99 minutes and 59 seconds or it can be disabled altogether. In McDermott's IBM the MIH was set for one minute. The purpose of the MIH is to off-load a device which is connected to it if it cannot perform its function within the one minute.
57 When the Versatec equipment connected to McDermott's CPU failed to function properly or not at all, it was not at first realised by the defendants' engineers or technicians sent to install the Versatec equipment sold to the plaintiffs, that what was happening in fact was that the MIH was off-loading the Versatec plotter. When this was realised after communication with Versatec in the United States a solution did not immediately present itself mainly due to the unfamiliarity of the defendants with the VM system under which McDermott's CPU was working. All kinds of suggestions were made from extending the time set for the MIH to the full of 99 minutes and 59 seconds to disabling it altogether. Undoubtedly all this was impractical from McDermott's point of view and in fact no approach was made to McDermott as to how the problem could be solved. McDermott's CPU provided a 24 hour 7-day operation. Notwithstanding that I have no doubt that if the defendants had approached McDermott and through them IBM a solution could have been found instead of blaming Prior for not taking up the question with McDermott or IBM directly. On this question I find that it was the defendants' obligation and not Prior's obligation whose technical knowledge as I have found was negligible or non-existent. Both Elson and Dr Lim Huat Seng (DW-2) the defendants' systems director and deputy managing director at the material time said that in the computer industry co-operation between different users and operators is freely given.
58 The defendants then took the position that their obligation to install the Versatec equipment was fulfilled once it was connected up to the CPU and the 14 test plots were successfully carried out. On this position being taken the relationship between the plaintiffs and the defendants floundered.
59 The plaintiffs had still not paid for the Versatec equipment they had purchased. There is no doubt that the property in the Versatec equipment had passed to the plaintiffs on delivery notwithstanding that the defendants had the further obligation of installing the Versatec equipment and getting it to work properly in the plaintiffs' working environment. Be that so the defendants did not sue the plaintiffs for the price of goods sold and delivered by curiously enough and wrongly in my view sought to repossess for non-payment. The plaintiffs however acquiesced at the Versatec equipment being taken back by the defendants. The plaintiffs maintain that they were in fact returning the Versatec equipment since it was defective and the defendants maintain that they were repossessing the Versatec equipment for non-payment of the purchase price. Happily nothing turns on this.
60 The sole question before the court is the plaintiffs' claim to recover damages for breach of contract. In my view this question falls to be decided by a consideration of sub-s 14(2) and 14(3) of the Sale of Goods Act. However the defendants very properly conceded that the sale of the Versatec equipment was subject to the implied condition of merchantability < s 14(2) > . The question remains whether it was also subject to the implied condition that it would be reasonably fit for the purpose or purposes made known by the plaintiffs.
61 From the facts I have already discussed it is clear and I so find that the defendants sold the Versatec equipment and the accessories in the course of their business; that the plaintiffs through Prior made known the purposes of the purchase of the Versatec equipment to Brian Elson and Lim Soon Hock and possibly to Carmen Chang, notwithstanding her professed lack of knowledge at the trial; that the plaintiffs (Prior) relied on the skills of the defendants to install the Versatec equipment to fully working condition in the environment of McDermott's CPU, which it was specifically made known to the defendants was on a prime operating system of VM (Virtual Machine) as opposed to the MVS operating system. These facts fully satisfy the requirements of s 14(3) of the Sale of Goods Act which reads as follows:-
62 `Where the seller sells goods in the course of a business and the buyer, expressly or by implication, makes known to the seller ... any particular purpose for which the goods are bought, there is an implied condition that the goods supplied under the contract are reasonably fit for that purpose, whether or not that is a purpose for which such goods are commonly supplied, except where the circumstances show that the buyer does not rely, or that it is unreasonable for him to rely on the skill or judgment of the seller ...'
63 In my view the Versatec equipment was clearly not fit for use with McDermott's CPU which was on a VM operating system (and this was made known to the defendants at the meeting on 13 July 1993) without experimenting with the MIH to arrive at the appropriate setting, as it turned out with hindsight, but without any certainty as to whether the integration could be achieved. I use the word `integration' to mean install to a fully working condition in the working environment of McDermott's CPU.
64 Accordingly I find that the defendants are in breach of the implied condition that the Versatec equipment sold by them would be reasonably fit for the purposes made known by the plaintiffs to which I have already made ample reference already.
65 In the result there will be judgment for the plaintiffs for damages to be assessed by the Registrar with the costs of the hearing as well as the costs of the assessment of the damages before the Registrar.
66 The defendants' counterclaim was not seriously pursued at the trial. No evidence was given as to what happened to the Versatec electrostatic plotter after it was repossessed by the defendants. The one person who might have known, Carmen Chang, said she did not know what happened to it. Despite this the defendants in their particulars of counterclaim claim the loss of profits as a result of the Versatec Electrostatic Plotter remaining unsold to date. I find this utterly strange. Why was it not sold to date. No evidence or explanation was given at the trial. In fact no evidence was given on the three items of the particulars given. In the circumstances I hold that the counterclaim is not proved and accordingly dismiss it with costs.
David Bennett QC assisted by Patricia Quah and Fazal Mohd for the plaintiffs
Davinder Singh assisted by Mohan Pillay and Hri Kumar for the defendants