1 Judgment:
2 Coram: The Honourable Justice GOH JOON SENG
3 JUDGMENT
4 The plaintiff in Suit 5847/83 (`the first plaintiff') was at the material time and is still being employed as driver by the first defendants. The plaintiff in Suit 5913/85 (`the second plaintiff') was at the material time employed by the first defendants as foreman and is still being employed by the first defendants.
5 The first defendants are manufacturers of enamelled wires. This manufacturing process using a 3.3 kv drawing machine is carried out at their factory at No 23 Benoi Sector, Singapore. This factory was somewhat modelled after their parent company's factory in Japan. The drawing machine is itself a used machine transported from the factory in Japan for installation and use at the first defendants' factory in Singapore.
6 The second defendant is a registered professional engineer. He designed the electrical system in operation in the first defendants' factory. Before doing so he visited the factory in Japan run by the first defendants' parent company. After the system was commissioned he was appointed the professional engineer `to operate or be in charge of or to control' the first defendants' electrical installations as required under the Public Utilities (Licences To Use Or Operate Electrical Or Supply Installations) Regulations, 1974 (`the Regulations').
7 The third defendants are manufacturers of transformers. They supply the bulk of the transformers in use in Singapore especially in Public Utilities Board installations. They supplied and installed the transformer which featured in these proceedings.
8 The transformer was a 22 kv/3.3 kv, 500 kva transformer. It supplied power to the drawing machine. It had three cores with paper and board insulated windings (A, B and C) immersed in oil which also acted as insulation.
9 The transformer was delivered to the first defendants' factory on 25 February 1981. The 22 kv incoming switch gear and the 500 kva primary switch gear were energised on 25 March 1981 followed by energizing of the 3.3 kv secondary switch gear on 5 April 1981. No-load trial running of the drawing machine connected to the 3.3 kv side of the transformer was carried out on 8 April 1981. This was followed by trial production using the drawing machine powered by the transformer on 18 and 20 April 1981. On 21 April 1981 the transformer broke down. The transformer sustained damage in this breakdown. As it was still under warranty, the transformer was taken back by the third defendants for repairs.
10 In the meantime production in the first defendants' factory continued with the drawing machine drawing power from a generator. The third defendants repaired the transformer by replacing winding C. Windings A and B were found on visual inspection and measurement to be in order and were thus put back for use. The transformer was then subjected to routine tests. Found satisfactory by the third defendants the transformer was returned to the first defendants for use.
11 On 20 November 1982 at about 8.15 am white smoke was seen emitting from the pressure relief vent of the transformer. An operator then informed the second plaintiff who was on duty at the production floor. The second plaintiff proceeded to the transformer room with the operator. Seeing smoke coming out of the transformer the second plaintiff went back to the production area to inform the drawing section supervisor Cheong Fook Seng (1DW1) and the maintenance section supervisor Seetoh Yoke Weng (1DW2). The three of them then proceeded to the area outside the transformer room. One of them raised the fire alarm. As a result most of the staff including the general manager, Takashi Azechi (`Azechi'), rushed out of the building. Some had fire extinguishers with them. They stood at about 25' to 30' from the transformer room. One of the supervisors and the director Mr Hoshi went to the guard room to make a telephone call to the Fire Brigade. At the same time 1DW1 and a Public Utilities Board (`PUB') licensed electrician Wong Chee Meng proceeded to the substation to cut off the power supply. They tried to do so by turning the `on-off' lever to an `off' position. When this failed to cut off the power supply they came out of the substation and signalled their failure to those standing near the transformer room. At about this time, the operators were instructed to return to their work place. Shortly after, at about 8.40 am there was an explosion. Burning oil was thrown out of the transformer room injuring amongst others the two plaintiffs. Hence these proceedings by the plaintiffs claiming for damages and loss arising as the result of the injuries sustained by them.
12 Subsequent investigation established that the safety protection relay being the over current and ground relays provided in the circuit breaker of both the primary (22 kv) and the secondary side (3.3 kv) of the transformer had operated but failed to trip because the voltage of the DC battery to trip the circuit breaker was low and the switch to the battery charger had been turned to an `off' position. In its Technical Report on the explosion, this is what the Public Utilities Board stated:
13 "For a fault of this nature, the 22 kv switch gear controlling the 500 kva transformer at Fujikura's 22 kv switch board should have operated. It was found that the battery at this substation which supplies DC to operate the protective relays did not have enough voltage to function properly. It was also found that the switch to the battery charger was in the off position. The correct operation of this circuit breaker should have isolated the faulty transformer within 3 seconds and the extent of damage to the transformer would have been minimal."
14 Expert or technical evidence on the cause of the explosion was adduced by or on behalf of the defendants. According to Professor Liew Ah Choy (1DW3) the fault giving rise to the explosion was internal whilst the third defendants contended through their Manager (Enginnering) at the material time Mr H Kageshima (3DW1) that it was external in relation to the transformer.
15 According to 1DW3 the first failure of the transformer on 21 April 1981 must have caused distortion and displacements in windings A and B which were thus weakened. These unreplaced windings A and B would have sustained partial tearing of the paper and board insulation. The tearing gave rise to partial discharges within the transformer causing progressive erosion and deterioration of the insulation in continued service. In 1DW3's view this process was generally slow. It could go on for `months or years or tens of years depending on the initial severity of the partial damage.' With time these partial discharges manifested as intermittent sparkings. As these discharges developed and increased in intensity, they heated the oil and caused local vaporisation and ignition of the oil/vapour mixture. This resulted in the generation of white smoke causing pressure increases within the transformer. This in turn caused the pressure relief vent to blow out releasing the white smoke. At this stage the rate of insulation deterioration by partial discharges increased very rapidly causing internal sparking with more vaporisation/ignition of the oil/vapours generating more white smoke. This went on until the partial discharges developed into a full discharge with total breakdown of the insulation material. A short circuit thus occurred. This resulted in a very large flow of current as an electric arc from the windings. The temperature of the short circuit electric arc was in the order of 8,000k and 10,000k. The heat so generated caused rapid vaporisation of the oil and the violent expansion of its vapours built up pressure within the transformer until it caused this tearing of the top cover of the transformer at its seams. This enabled the escape and release of the burning oil/vapours into the open, i.e. the explosion.
16 The second defendant basically agreed with 1DW3 on the cause of the explosion. This is what he said:
17 "Q: See 1DB14 of your report. On the conclusion could you please explain?
18 A: ... ... there was a fault with the transformer after 1 month of commission. So the transformer was taken back to 3rd defendants' factory for repair. From what I can recall based on discussions held in the presence of the client and 3rd defendants' representative, 3rd defendants confirmed that the transformer was completely rewound. There are 3 cores but only 1 core on which the defect was found was rewound. When transformer is subjected to a fault, the winding is subjected to internal stress and this can cause the winding to be dislocated due to tangential force due to the high current flowing through the windings, the windings are wire or asbestos. If the windings are not properly insulated, it could lead to short circuit in the core, this leads to arcing and heating of the windings. The re-winding is on the `C' core. There could have been damage to the windings of cores A and B. But these windings in cores A and B were not replaced or rewound, although 3rd defendants said `all 3 cores were rewound'. If cores A and B had not been rewound then defect in winding cores A and B could have been the cause of the explosion in November 1982. ... ... ..."
19 But according to 3DW1 the fault suffered by the transformer on 21 April 1981 was due to short circuiting of a current transformer (CT) located inside the motor control panel of the drawing machine. Visual inspection and external measurements on windings A and B of the transformer indicated that there was no malfunction. So only winding C was changed. The third defendants denied having represented that all three cores were rewound. The repaired transformer passed all routine electrical tests and was put back in service. On the explosion on 20 November 1982, 3DW1 said that there was an external fault on the load side of the drawing machine (not within the transformer). This caused damage to the coil inside the transformer. The damage caused displacements over the layers of the windings in the coils. The fault however did not blow the fuses and that was why the drawing machine could continue to function after the explosion drawing power from a generator. The displaced layers of windings resulted in several turns of the windings being short-circuited. Large circulating currents were thereby induced in these few short-circuited turns and these heated turns acted like an immersion heater causing the 650 litres of insulating oil in the transformer to heat up ultimately leading to the emission of white smoke. Some sparks within the transformer due to the short circuit caused ignition of the boiling oil resulting in the explosion. The large external fault which caused the transformer coil displacement also caused the protective relays to be activated but the circuit breakers failed to trip because of low voltage in the battery and the power to the battery charger having been turned off. According to 1DW3 this explanation is not consistent with protection principles in electrical engineering, and with available evidence for the following reasons:
20 (i) the first external flashover if it did occur as suggested by 3DW1 would have to be very severe to cause displacement in the trans-former coil. Transformers are designed to withstand twenty times the rated current for three seconds. To cause deformation it would require a fault current many times this amount, and the motor control panel fuses would have blown within a few milliseconds. But this was not so. Only one fuse appeared to have been damaged;
21 (ii) if as a result of this coil displacement the short circuited turns within the transformer began to heat up the oil to ultimately generate the white smoke and then the explosion, this would have taken a few hours. The white smoke was seen that morning for at least 30 minutes before the explosion. Then all the fuses at the motor control panel would have blown and the drawing machine would not have functioned normally but it did;
22 (iii) that such short-circuited turns carrying large current producing heat for several hours would experience large forces, persisting for a few hours is very unlikely. Also to depend on a few turns of copper which is a good conductor of electricity to heat up 650 litres of oil in the transformer is not credible. 1DW3 compared this scenario to an immersion heater attempting to heat up 650 litres of water.
23 Having heard and weighed the evidence presented, I accept 1DW3's view of the cause of the explosion i.e. that it was due to an internal fault within the transformer supplied by the third defendants. However it is quite clear that the explosion would have been averted if the protective relays had operated as designed to disrupt the power supply. This is not disputed. This was what 1DW3 said:
24 "Q: Whatever may be the immediate cause of the transformer explosion I put it to you that the explosion was due to the protective relay not operating?
25 A: Yes."
26 This was also confirmed by Mr Giam Choo Huat (1DW5) an electrical engineer:
27 "Q: Whatever may be the fault internal or external, if the protective system had worked as designed within 3 seconds, there would not have been an explosion. Agree?
28 A: I agree."
29 It was confirmed by the Public Utilities Board and is not being disputed that the protective relays were activated but the circuit breakers did not trip to disrupt the supply because the battery voltage was low. The switch to the battery charger was found after the explosion to have been turned to an `off' position. Lights and instruments powered by the battery charger would therefore have to draw power from the battery. The battery was a 10 ampere hour battery, that is, it had power (without power from the battery charger) for 10 hours if the rate of consumption of power from the battery was 1 ampere per hour. At this capacity, the battery would have completely drained within 24-25 hours. The battery therefore required daily inspection. The second defendant's letter of appointment by the first defendants dated 21 February 1981 appointing him the `Electrical Engineer for the operation and maintenance' of the first defendants' electrical installations only required him to `conduct one site visit and inspection once every three months'. His fee was nominal, being $400 a month. The second defendant could not have been engaged and could not have been expected to inspect the installations daily and to ensure that the battery was properly maintained. Under section 46 of the Public Utilities Act, Cap 211 in force at the material time, no person shall use or operate such an electrical installation except under and in accordance with a licence granted by the Public Utilities Board. Under Regulation 4 of the Regulations, no licence shall be granted unless `an electrical worker registered with the Board under (the Regulations)' is appointed `to operate or be in charge of or to control the electrical or supply installation ... ...'. It is obvious that the second defendant's appointment was merely to satisfy this statutory requirement. This was what Mr Hitomi Morita who was the general manager of the first defendants at the material time said:
30 "Yes, we engaged Mr Lee as P.E. < Professional Engineer > . In Singapore if you are running a high tension equipment you are required to hire a P.E. Unless you are a P.E. you are not allowed to handle high tension equipment. So we had no choice but to hire a P.E."
31 The first defendants have however contended that they were not advised by the second defendant on the need for daily inspection and maintenance of the battery and therefore they were not aware of such a need. Bearing in mind that the first defendants are manufacturers of enamelled wires and have in their employ polytechnic graduates and licensed electricians I cannot and do not accept that they did not know of such a basic need.
32 It is also clear that it was the turning off of the switch to the battery charger resulting in power having to be drawn from the battery that led to the failure of the protective relay system. Ho Fook Seng (2DW2), a project engineer in the employ of the second defendant, last inspected the protective relay system about `two to three months before the explosion'. He found the system in order and the battery charger lights on. After the explosion although the switch to the battery charger was found to have been turned off, the battery had not completely drained. Its voltage was only low. As it would have taken not more than 24-25 hours to completely drain the battery, the power to the battery charger must have been turned off by someone within less than 25 hours before the explosion. Therefore 2DW2 could not have turned it off during his last visit two to three months before the explosion. Accordingly I hold the second defendant free from blame. As access to the substation was controlled by the first defendants the switch to the battery charger must have been inadvertently turned off by the staff of the first defendants during their visit to the substation.
33 It is further contended on behalf of the first defendants that the electrical system incorporated an alarm circuit. But it was not connected by the second defendant. If it had been connected it would have given audible or visible warning if the temperature inside the transformer reached certain preset limit. I have no doubt that such additional safety device would have been beneficial. But there is no reliable evidence that the explosion would have been avoided if the alarm circuit had been connected. Whether it would have given adequate warning depended on the preset limit and the rate of temperature rises within the transformer at the material time. There is thus no evidence of a causal link between the explosion and the lack of an alarm circuit in operation. I therefore apportion blame for the explosion as to two thirds on the first defendants for breach of duty to maintain the battery system and one third on the third defendants for failing to ensure that the repaired transformer would not sustain such partial discharges which led eventually to the explosion.
34 I now turn to the claim of the two plaintiffs. The first plaintiff has been employed by the first defendants since 1982 as a driver. At the relevant time he was assigned as driver to Azechi. According to the first plaintiff, on that morning he commenced work at 6.00 am driving Azechi and an expatriate to the airport. After the expatriate was seen off at the airport by Azechi he drove Azechi to the first defendants' factory, arriving at about 8.30 am. After parking the vehicle he went up to seek Azechi's permission to go out for break-fast. As Azechi was not in his office he went looking for him. He noticed Azechi near the transformer room. He did not hear any fire alarm and was not aware of any fire alarm having been raised. He also did not see any smoke at the transformer room. As he approached to with-in 8 to 10 feet of Azechi there was a sudden explosion and burning oil fell on him and he sustained burns.
35 I have no hesitation in rejecting his story. If he was going out for breakfast he would have sought Azechi's permission when Azechi was alighting instead of allowing Azechi to alight, parked the car and then proceeded to Azechi's office to seek permission. Further by 8.30 am alarm had been sounded and most of the staff had rushed out of the building. That was why Azechi went to the transformer room. By this time smoke had been emitting from the transformer room and the first plaintiff could not have failed to see the smoke from an appreciable distance. I find that the first plaintiff having heard the alarm or known of the alarm having been raised went to the area where the transformer was located instead of proceeding to the designated assembly point well away from the transformer room in the event of an emergency as he ought to have done, according to standing instructions. Accordingly I find the first plaintiff contributorily to blame to the extent of 25%.
36 I now deal with the quantum of the first plaintiff's claim. He sustained 15% burns on the left upper limbs, forehead, left cheek, scalp, left ear and upper back. Skin grafting was done to 4% of the burnt area. The burns of the ear were very deep. In spite of several operations to control the ear infection, the ear was lost. He had operations for skin grafting, removing dead tissues and skin graft of the left ear, incision and drainage of left ear, drainage and cartilage excision, excision of keloid at the ear rim and ear lope. He has lost the left pinna and the external opening of the ear canal was surrounded by scar tissue resulting in severe stenosis and 20 db conducting hearing loss of the left ear. The burns on the scalp has resulted in alopecia. The hypertrophic scars have resulted in restriction of elbow movement. He is able to cope with his work as a driver. He declined to undergo further surgery because he is diabetic. He is now 51 years old. I assess general damages for pain and suffering as follows:
(i) | burns and scars- | $20,000 |
(ii) | oss of the pinna and stenosis of the left ear and hearing loss - | l 25,000 |
(iii) | alopecia on the scalp | 10,000 |
| Total - | $55,000 |
37 There was hardly any overlapping among the various items of injury. Therefore I do not make any deduction for overlapping.
38 On the pre-trial loss of earnings, the first plaintiff was paid during his hospitalisation. The only loss was overtime. I assess this item at $1,200. On pre-trial loss by way of transport expenses incurred by members of his family to visit him and transport expenses incurred by him for outpatient and occupational therapy treatment, parties have agreed to a sum of $1,584. For future medical expenses, I assess these at $5,000. For future loss of earnings I allow a sum of $10,000 for loss of earning capacity. The total is therefore $72,784. After deducting 25% of that for his own contributory negligence, I award the first plaintiff the sum of $54,588 plus costs. Of the sum of $54,588 (i) $41,250 thereof for pain and suffering shall carry interest at 6% per annum from date of service of the writ to date of judgment; (ii) $900 thereof for pre-trial loss of overtime shall carry interest at 3% per annum from date of the accident to date of judgment; (iii) $1,188 thereof for past loss by way of transport expenses shall carry interest at 3% per annum from date of the accident to date of judgment.
39 On the second plaintiff's claim, he was the foreman in charge of supervision of operators and production at the factory. He was at the vicinity of the transformer room awaiting instructions from his Japanese superiors when the explosion occurred. This was in line with his duties as a foreman. I therefore hold that he is free from any contributory negligence for his own injuries. He sustained 26% (of total body surface) burns, 2% being full thickness and 24% being partial thickness. The burns were mainly on the back, both upper limbs, right side of neck and face. He was operated twice during his hospitalisation to deslough the wound with split skin graft laid over the desloughed area. The second plaintiff has recovered without any functional disability and has full function of both his upper and lower limbs. But there are hypertrophic scars scattered over an eight percent area. These required the use of pressure garments. These are at times itchy and painful. I award him the sum of $25,000 for pain and suffering. He is trained in the technical line which may require working in the open. But working in the open exposes the scarred area to heat and sunlight and this induces itchiness. To this extent he is disadvantaged if he is thrown into the job market. He is now 34 years old. I award him $10,000 for loss of earning capacity. The total award in favour of the second plaintiff is $35,000 plus costs of which $25,000 for pain and suffering is to carry interest at 6% per annum from date of service of the writ to date of judgment.
40 The awards in favour of both plaintiffs are against the first and third defendants. In respect of the claim against the second defendant the same is dismissed with costs to be paid by the first and third defendants according to their proportion of blame herein.
Karuppan Chettiar (Murphy & Dunbar) for the plaintiff (Suit 5847/1983)
John Abraham (John Abraham) for the plaintiffs (Suit 5913/1985)
N K Pillai (Niru & Co) for the 1st defendants (Suits 5847/1983)
Ronnie Quek (Allen & Gledhill) for the 2nd defendants (Suit 5847/1983 & 5913/1985)
Aloysius Leng (Abraham Low & Partners) for the 3rd defendants (Suit 5847/1983 & 5913/1985)