This judgment is subject to final editorial corrections approved by the court and/or redaction pursuant to the publisher’s duty in compliance with the law, for publication in LawNet and/or the Singapore Law Reports. |
Keller Piano Co (Pte) Ltd v Management Corp Strata Title No 1298
[1994] SGCA 134
CA 165/1993
Chao Hick Tin J; Karthigesu JA; L P Thean JA
25 November 1994
1 Chao Hick Tin J This was an appeal against a decision of the High Court reversing a decision of the district court granting judgment to the plaintiff-appellants against the defendant-respondents in the sum of $15,580, on account of damages suffered by the appellants due to a leak from a chilled water pipe of the airconditioning system of the premises occupied by the appellants. Having heard arguments of the parties we allowed the appeal and restored the decision of the district court. We now give our reasons.
2 The appellants were the subsidiary proprietors and occupiers of the premises at #04-01 Cold Storage Centrepoint, 176 Orchard Road. The appellants used the premises as a showroom for the sale of pianos. The respondents were the management corporation for the building constituted by the appellants and other subsidiary proprietors under s 33 of the Land Titles (Strata) Act (Cap 158, 1988 Ed) (hereinafter called `the Act`).
3 On 2 October 1987 there was a leakage of water from the chilled water pipe (the pipe) running just above the false ceiling of the premises. The leak was due to a pin hole that had developed in the pipe. The leak caused damage to the false ceiling and the wall mirrors in the premises. It also damaged a Steinway upright piano model `Z-114`.
4 The pipe was covered with insulation material which consisted of two inches of rock wool and finished with double-sided aluminium foil. The pipe carried chilled water from the sixth level of the building to the two fan coil units located in the void between the false ceiling and the structural ceiling of the premises. The damaged section of the pipe was replaced soon after the leak occurred.
5 By this action the appellants claimed damages from the respondents on the grounds of negligence and or breach of statutory duty under s 48 of the Land Titles (Strata) Act. The respondents denied that it was their duty to maintain the pipe and in any case, there was no breach of duty. In the further alternative, the respondents averred that the task of maintaining the chilled-water pipe was delegated to ACBS & Electrical Services Pte Ltd (ACBS), the third party against whom the respondents claimed contribution or indemnity. ACBS were, at the material time, pursuant to a service and maintenance agreement, the maintenance engineers of the airconditioning system of the building.
6 The district judge found that the maintenance of the pipe did not come within the scope of duties of ACBS and dismissed the respondents` claim against the third party. No appeal to the High Court was made by the respondents against this finding. Therefore, in this appeal, as in the High Court, the claim in the third party notice was no longer in issue.
7 District court decision
8 The district judge held that the respondents owed a duty to the appellants to take reasonable care to ensure that no reasonably foreseen injury/damage would be caused to the appellants. He held that the respondents had the sole management and control of the pipe. As there was no evidence as to the cause of the pin hole, he could not hold that the appellants had proved that the respondents had failed in their common law duty of care. However, he felt that the doctrine of res ipsa loquitur applied to the case. Furthermore, as the damaged section of the pipe was not retained by the respondents after it was replaced and as no reasonable explanation was given for its non-production, the district judge drew an adverse inference against the respondents under s 116 of the Evidence Act (Cap 97, 1990 Ed). He concluded that as the respondents had not provided any plausible explanation for the leak the respondents had not disproved negligence on their part. As regards the alternative claim under s 48 of the Act, the district judge held that a breach of that provision did not give rise to civil liability.
9 High Court decision
10 In the High Court, the learned judicial commissioner held that the district judge was correct in holding that the appellants had not proved the following particulars of negligence as set out in the statement of claim:
(a) failing to take all reasonable and effective measures whether by inspection, examination or otherwise, to ensure that there was or would be no risk of water ingress to the [appellants`] premises through the burst water pipe or otherwise.
(b) failing reasonably to have foreseen the danger and risk from the water pipe bursting and that extensive damage could or likely to result therefrom.
(c) failing to take reasonable and proper precautions to prevent the water pipe from bursting and thereby preventing the water ingress in the [appellants`] premises.
11 However, the learned judicial commissioner held, contrary to that of the district judge, that the respondents did not have the sole management and control of the faulty section of the pipe as the evidence showed that access to that section of the pipe could be obtained through the appellants` premises. No one could get to it without entering the appellants` premises. Having said that, he nevertheless thought that res ipsa loquitur could still apply. He felt it was a question of determining what inference might reasonably be drawn upon an examination of all the evidence.
12 He went on to hold that as the evidence of the witness for the third party, Teng, showed that there were two possible causes for the pin hole in the pipe, corrosion or manufacturer`s defect, there was no reasonable ground for drawing an inference of negligence against the respondents. He reasoned [See [1994] 2 SLR 78 at p 90]:
If it was corrosion there was no evidence that the pipe had been subjected to some unusual treatment. There was no evidence such as that the test results of the water carried in the pipe were in some respects unsatisfactory. The corrosion was not such as could have been discovered by the exercise of reasonable care. If it was manufacturer`s defect there was no evidence that the [respondents] ought to have known of it or that there was anything it could reasonably do or ought reasonably to have done ... . It is not for the [respondents] to disprove negligence. It is also not for the [respondents] to furnish a reasonable explanation. The question is whether on the evidence at the end of the case, whether adduced by the [respondents] or the [appellants] or the third party does not matter, the court finds that negligence has been proved by the [appellants].
13 Appeal
14 While a number of points were raised in the appellants` case to contend that the decision of the learned judicial commissioner was wrong, there were basically two related issues: (i) was the doctrine of res ipsa loquitur applicable in this case?; and (ii) if so, had the respondents rebutted the prima facie case?
15 In at p 775, this court explained the meaning of that doctrine in these terms:
It seems to us settled law that the principle of res ipsa loquitur is no more than a rule of evidence of which the essence is, as Lord Radcliffe pointed out in that an event, which in the ordinary course of things is more likely than not to have been caused by negligence is by itself evidence of negligence. It would then be for the defendant to rebut the prima facie case.
16 In the earlier case , Megaw LJ stated the principle thus (at p 1246):
I think it is no more than an exotic, though convenient, phrase to describe what is in essence no more than a common sense approach, not limited by technical rules, to the assessment of the effect of evidence in certain circumstances. It means that a plaintiff prima facie establishes negligence where: (i) it is not possible for him to prove precisely what was the relevant act or omission which set in train the events leading to the accident; but (ii) on the evidence as it stands at the relevant time it is more likely than not that the effective cause of the accident was some act or omission of the defendant or of someone for whom the defendant is responsible, which act or omission constitutes a failure to take proper care for the plaintiff`s safety.
17 The pertinent facts of the present case were these. The appellants were the owner-occupiers of the premises. There was a leak from the pipe above the false ceiling which caused water to get into the premises and which in turn caused damage. The leak was due to a pin hole in that section of the pipe. The respondents had the sole management and control of the pipe, including that section which leaked. The respondents had the duty to maintain the pipe. While access to the pipe could only be obtained from the premises of the appellants, it was never suggested, nor was it the respondents` case, that the appellants had in any way tampered with that section of the pipe or had allowed anyone else into their premises to tamper with the pipe. It was also not the respondents` case that the pipe could not be maintained at all. In these circumstances we did not see what else could the appellants show. It seemed to us eminently reasonable for the doctrine to apply to shift the burden to the respondents to show how the leak could have occurred without any want of due care on their part.
18 We turn next to the second issue. Here there was really no relevant evidence at all from the respondents although there was the evidence of Teng, the third party, who said that the pin hole could have been caused by either corrosion or manufacturer`s defect. Teng said that corrosion would be a slow process (due to water acidic content) taking four to five years to cause such a hole. The pipe in question was installed in 1983. By the time of the leak four years had elapsed. He said the normal lifespan of the pipe was between eight to ten years. A pertinent portion of the evidence of Teng was as follows:
Q: Eight to ten years from 1983 would carry you to 1991. Given the fact, is it likely to be due to manufacturer`s fault?
A: I can`t say.
Q: But given fact it can`t be due to corrosion?
A: It is possible.
Q: Assuming that it is caused by corrosion, how long would it take to corrode such a pipe to produce a pin hole?
A: I would say four to five years.
Q: So, in other words, the water content of chiller pipe would have to be acidic for four to five years before it would cause such a pin hole?
A: Yes.
Q: Are there any ways in your trade to determine the acidity of water?
A: That will have to be water treatment people.
19 From Teng`s evidence it was clear that preventive measures could be taken. The chilled water should have been tested periodically and it could also be treated. It was also clear that he could not say whether the pin hole was due to manufacturer`s defect or to corrosion.
20 But in so far as he was concerned, it was not part of his contractual duties to inspect or check the pipe or to test the chilled water in the pipe.
21 The respondents only called one witness, Chuah Lam Siang, who told the trial court that the respondents engaged two sub-contractors, ACBS and Nalco, to maintain the airconditioning system. The duties of ACBS have been mentioned above and nothing in this case turned on that. Nalco was a term contractor engaged to carry out chemical test on the chilled water in the pipe. Chuah agreed that Nalco was involved in the maintenance of the airconditioning system of the premises. Chuah also told the court that in addition there were in-house maintenance people who would check the pH level in the water.
22 Notwithstanding that Nalco was engaged to undertake the testing and treatment of the chilled water in the pipe, no evidence was given by Nalco as to what they did or what could have been the cause of the pin hole in the pipe. Neither was there any evidence to show what were the results of the tests done by the in-house maintenance people. In passing we should mention here that the appellants had wanted to call an expert, Dr Chow Siew Kiang, whose report would have thrown some light on how the pin hole could have been caused. But it was objected to by the respondents.
23 In the circumstances, it was our opinion that the respondents had failed to rebut the prima facie case. There was no evidence from Nalco to show what were the results of their tests (if any) to determine the acidity of the chilled water in the pipe and what steps, if any, they had taken to prevent corrosion of the pipe. There was also no evidence to show that the cause of the pin hole was more likely to be due to manufacturer`s defect than to corrosion.
24 Appeal allowed.
Chao Hick Tin J Karthigesu JA L P Thean JA |
Cheah Kok Lim (Michael Khoo & BB Ong) for the appellants
Benedict Chan (Goh Poh & Pnrs) for the respondents