Suit 399/1989
Goh Joon Seng J
30 July 1994
1 Judgment:
2 Coram: The Honourable Justice GOH JOON SENG
3 GROUNDS OF JUDGMENT
4 The first defendants Lian Yak Realty Co (Pte) Ltd < `Lian Yak' > were the owners of a building known as Lian Yak Building < `the Building' > at No 305, Serangoon Road, Singapore.
5 The second defendants are the estate of Ng Khong Lim deceased < `Ng' > who was at all material times the managing director of Lian Yak. He was in charge of the construction and maintenance of the Building.
6 The third defendants, Industrial and Commercial Bank Ltd < `ICB' > were at the material time occupiers of a portion of the ground floor < `the bank' > of the Building carrying on banking business thereat.
7 The plaintiffs are the administratrix and co-administrator of the estate of Song Teck Leong deceased < `Song' > . Song was a partner of Song Brothers Trading and Chop Chee Kee who were customers of ICB.
8 Construction of the Building began sometime in June 1969. Certificate of Fitness for the Building was obtained on 22 September 1972. From as early as 1974 cracks began to appear in some sections of the Building. But on the instructions of Ng, the cracks were just patched over with cement. Even cracks in some columns were ignored and simply covered up by plywood panels. These cracks developed progressively until the Building finally collapsed at about 11.15 am on 15 March 1986. 33 persons died in this tragedy.
9 Following the collapse a commission of inquiry headed by L P Thean J as he then was, was appointed to, inter alia, determine the cause of the collapse. Witnesses were called and examined before the Commission and on non-controversial matters statements of witnesses not called were tendered. The report of the Commission was published in February 1987.
10 Among the 33 persons who died was Song. He was at the time at the bank on the business of Song Brothers Trading and or Chop Chee Kee. He died leaving behind the first plaintiff his widow < `the widow' > then aged 26 years and a daughter Song Xiuyan Serene < `Serene' > born on 19 October 1983.
11 On 28 February 1989 the plaintiffs commenced the present proceedings for the benefit of the estate that is for `lost years' and for dependency. At the end of the hearing I found Lian Yak and the estate of Ng two thirds to blame and ICB one third to blame. As the `lost years' claim merged with the dependency claim I awarded with costs the sum of $180,000 for loss of support which the widow and Serene would have received had Song not died due to the collapse of the Building. Of the sum of $180,000, $96,000 is to carry interest at 3% per annum from the date of his death to date of judgment. I also awarded the plaintiffs $2,000 for funeral expenses. On costs I ordered that ICB bear 40% of the plaintiffs' costs and Lian Yak and estate of Ng the balance.
12 ICB has appealed against my apportionment of liability and my award against them on costs. I now give my reasons.
13 In the present proceedings the transcript of the evidence recorded by and the report of the Commission were admitted but the findings of the Commission on the cause of the collapse were not to be binding.
14 On the cause of the collapse the Commission stated its views as follows:
15 "... From the evidence, it is clear to us that there had not been any triggering act or incident that brought the entire building to the ground. The causes of the collapse, in our opinion, had their origin more than 15 years ago when the structural design of the building was still on the drawing board.
16 Structural Design
17 The root and main cause of the collapse lies in the structural design of the building. This was so grossly inadequate that, in our opinion, it was a matter of time before the building would collapse unless a major and comprehensive effort was made to save it. Analyses of the structural design showed that the dead weights of many structural elements were underestimated and that a large number of individual structural members were grossly under- designed. This resulted in many of the columns and beams having very low factors of safety and being barely able to take the loads imposed on them.
18 The R.C. calculations and R.C. drawings submitted to the Chief Building Surveyor also reflect gross incompetence and shoddiness in the structural design in other respects. The R.C. calculations are sketchy and insufficient, and the R.C. drawings show many discrepancies and ambiguities in the technical details and other information given. The presence of the section of the retaining wall at the position where the ramp to the basement was eventually built is inexplicable. In general, the R.C. drawings did not provide for what are called for in the R.C. calculations; for example, the reinforcements for many structural members as shown in the R.C. drawings are substantially less than those derived from the calculations.
19 Construction
20 The quality of the construction of the building was very unsatisfactory, and therein lies another cause of the collapse. First, as revealed by the investigation on the basement substructure, the construction deviated considerably from the R.C. drawings and that compounded the inadequacy of the structural design. The reinforcements provided in many structural members were substantially less than what are specified in the R.C. drawings.
21 Secondly, the construction was carried out in a very haphazard and unsatisfactory manner with virtually no professional supervision. No soil tests or concrete cube tests were carried out. If, at all, setting out procedures and surveys were carried out, these were not properly executed as could be seen from the haphazard positioning of many piles and columns; these were not even positioned along straight lines. Columns were eccentrically positioned and constructed on the pile caps. Most probably to compensate for the eccentricities, some pile caps had to be enlarged by adding cast concrete sections. Even then, these cast sections were poorly constructed as there was no proper construction joint between them and the original pile caps. A layer of blinding concrete was not provided under the pile caps. Starter bars of some piles were not properly anchored to the pile caps, and, in some cases, starter bars were absent altogether.
22 Further Loading
23 During the life span of the building, decisions were made and events occurred which further aggravated the sorry state it was already in. Substantial loads not provided for in the structural design were added to the building and caused the overloaded and poorly constructed structure to be further loaded. These loads contributed to the collapse of the building, and they were mainly due to:
24 (a) the installation of the water tank on the open roof which, with the water stored, weighed about 21.8 tonnes; and
25 (b) the tiling of the building facade and the OTTV upgrading of the building which together added about 52.8 tonnes to the building.
26 We should add a qualification here: normally, for most buildings, such additional loads would not cause any serious overloading. However, for Lian Yak Building, which was so grossly under-designed, any additional load, especially if it was imposed on the columns with low factors of safety, would aggravate the situation.
27 Maintenance
28 There was no proper maintenance of Lian Yak Building during its life span. In our opinion, had proper maintenance been provided, the structural problems in the building would probably have been noticed, their seriousness appreciated and remedial action taken in time. However, the signs of structural distress, namely persistent cracks in columns, walls and floors were either ignored or superficially patched up. No professional advice or assistance was sought by the owners who were probably ignorant of the serious structural deterioration of the building. As a result, cracks that had developed in the structure were allowed to propagate. The process of structural deterioration thus continued unimpeded towards the eventual collapse of the building.
29 Collapse Mechanism
30 As a result of the gross structural under-design and the poor construction of the building, many of the columns, particularly those on the first and second floors, were highly overloaded. Under such sustained overloading, micro-cracks developed in the concrete and, over the years, these grew and propagated. The resulting creep deformation in the columns increased gradually. As the overloaded columns consequently shortened, the loads on them were transferred to adjacent columns through the brick in-filled frames thereby causing these columns to be also overloaded. In this manner, the structural deterioration gradually spread to the other parts of the structure.
31 From the evidence before us, it is our opinion that the collapse of the building probably commenced at columns 26 and 32 in the night- club on the second floor and column 30 at the car-park on the ground floor. As these columns failed, the loads they carried were transferred progressively to other columns. It seems to us that either columns 26 and 32 failed simultaneously as they appeared to have been the most over stressed, or column 26 was the first to fail as it was found to have cracked very severely in the evening before the collapse. Columns 26 and 32 were the columns from which cracking sounds were heard that evening. When columns 26 and 32 failed in the morning of March 15, 1986, loads carried by them were immediately transferred to other parts of the structure thereby starting a chain reaction. In the process, the building caved in at what was probably the part directly above these two columns, and then collapsed completely, like a deck of cards, sealing the fate of the 33 persons who perished in that tragedy."
32 The defendants have not challenged the correctness of the findings with which I respectfully agree. Based on these findings the blame for the collapse of the Building rests on Lian Yak and Ng. However, in so far as the death of Song is concerned, I found ICB contributorily to blame due to their breach of duty as occupiers of the bank to Song who was there as an invitee in that they ought to have known that the Building of which the bank was a part was in danger of collapse. On who is an invitee Clerk and Lindsell on Torts (11th edition) para 1138 states:
33 " An invitee is a person who is `invited into the premises by the owner or occupier for some purpose of business or of material interest'. `The common case is that of a customer in a shop', but such a customer is an invitee whether he actually buys or not; `and, if a customer were, after buying goods, to go back to the shop in order to complain of the quality or that the change was not right, he would be just as much there upon business which concerned the shopkeeper, and as much entitled to protection during his accessory visit, though it might not be for the shopkeeper's benefit, as during the principal visit, which was. And if, instead of going himself, the customer were to send his servant, the servant would be entitled to the same consideration as the master.'"
34 On the occupier's common law liability to an invitee, Clerk and Lindsell on Torts para 1141 of the same edition states:
35 "The duty to an invitee is `that he, using reasonable care on his part for his own safety, is entitled to expect that the occupier shall on his part use reasonable care to prevent damage from unusual danger, of which he knows or ought to know. ... ...'".
36 According to Albert Sim and Cheong Cheng Guan, both officers of ICB at the bank, at about 10.00 am that day they heard a rumbling sound followed by a tremor. They could feel the Building vibrating. They and other staff at the bank were shocked. Then at around 10.30 am Quek Ah Suan, a clerk of Multico Building Products Pte Ltd a customer of ICB on her way to the bank on her employers' business, saw cracks in one of the pillars in the car park. She was advised by Lian Yak's watchman to advise her managing director whose car was in the car park to remove the same < because of the dangers posed by the cracks > . On arriving at the bank, she informed the said Cheong Cheng Guan and Albert Sim and some other staff of ICB that the pillar in the car park had cracked. Instead of taking what she said seriously they said she was joking. She told them that if they did not believe her they should go and see for themselves. Albert Sim did so. He saw cracks in one of the pillars in the car park and someone putting a wooden support to it. He then removed his car to the basement and returned to the bank. On arriving at the bank he informed the manager Albert Kan of what he saw. He and Albert Kan then went to examine the pillar. Albert Kan decided that it was not necessary to remove his car near the cracked pillar. They then returned to the bank and continued with their work. No warning of any kind was given to the customers. At 11.15 am according to Cheong Cheng Guan the ceiling in the bank suddenly `opened up and the whole thing just came crushing down ... ... ' killing Song.
37 In my view, having experienced the tremor, been made aware of the cracks in the pillar, Albert Kan as the manager and other officers of ICB should have at once evacuated every one in the bank. By their failure to do so without even giving any warning to the customers, ICB were in breach of their duty as occupiers to Song their invitee in respect of this danger of collapse of the Building which they ought to have known. Accordingly I held ICB one-third to blame.
38 On costs, Lian Yak and the estate of Ng admitted liability from an early stage of the trial. They only contended that ICB were contributorily liable for the death of Song. ICB on the other hand denied liability to the end. I therefore held that ICB should bear 40% of the plaintiffs' costs.
William Jansen for the plaintiffs
R Joethy for the first defendants
R Ramayah for the second defendants
Lok Vi Meng for the third defendants