Hong Leong International Hotel (Singapore) Pte Ltd and Another v Chotek (Pte) Ltd and another and another action
[1995] SGHC 15
Suit 129/1990, 130/1990
Goh Joon Seng J
21 January 1995
1 Cur Adv Vult
2 The plaintiffs are members of the Hong Leong Group of companies. Their claim against the first defendants in both suits, Chotek (Pte) Ltd (Chotek) and Darimbi Holdings (Pte) Ltd (Darimbi), is for contribution for the losses to the capital of Apollo Hotel Development Ltd (AHDL) under three agreements, namely:
(1) the joint venture agreement of 7 January 1987 (the JVA);
(2) the compensation for loss agreement of 8 January 1987 (the compensation agreement); and
(3) the novation agreement of 5 March 1987 (the novation agreement).
3 The plaintiffs` alternative claim against the second defendant, Apollo Enterprises Ltd (AEL), in both suits is for breach of warranty of authority in entering into the three agreements on behalf of Chotek and Darimbi. The major shareholders of AEL were Chan Chun Ping (CP Chan) and members of his family. The shareholders of Chotek and Darimbi were Ong Eng Hung (OEH), members of his family and other relatives.
4 It is AEL`s position that at all material times it was authorized by Chotek and Darimbi to negotiate and enter into the three agreements on their behalf, alternatively Chotek and Darimbi had acquiesced to, ratified or confirmed or are otherwise estopped from denying the same. The defence of Chotek and Darimbi is principally that they were not parties to the three agreements and they deny having authorized AEL to negotiate and enter into the same on their behalf. They also deny any knowledge of the terms of these agreements at the material time.
5 The facts
6 On 6 July 1983, AEL entered into a project agreement with the Ministry of Economic Affairs, Taiwan (MOEA), for the development and operation of a hotel at the Taipei World Trade Centre Complex. By cl 4 of the project agreement, the authorized capital of the company to be incorporated to undertake the project was to be NT$1,463,400,000 which was to be subscribed by AEL and CP Chan`s family, and by OEH and his associated interests. By cl 18 no assignment of the benefits and liabilities under the project agreement was permitted unless prior written approval had been obtained. By cl 26 of the project agreement, the developers would be considered to be in default, inter alia, if they failed to comply with the construction schedule for the completion of the hotel and the superfices. On default, MOEA might terminate the project agreement and repossess the site.
7 On the same day, AEL also entered into an agreement with MOEA for the creation of superfices.
8 To undertake the project, AHDL, was incorporated on 14 October 1983 with an authorized capital of NT$1,463,400,000. AEL was to subscribe for 80%, Chotek 15% and Darimbi 5% of the authorized capital of AHDL respectively. Only 25% of the authorized capital was issued with AEL holding 20% and Chotek and Darimbi holding the remaining 5%. The directors were CP Chan, Tan Boen Ho (TBH), Tan Boen Hian of AEL, OEH and Ong Eng Guan of Chotek and Darimbi.
9 The building contract for the project was awarded to Pacific Construction Co Ltd (PCC) in August 1984. Construction work commenced in June 1985 but due to failure by AHDL to honour the architect`s certificates of payment, work slowed down from November 1985 and eventually stopped completely in April 1986.
10 Thus there were payments due to PCC on the architect`s certificates with interest thereon. PCC also had a claim for losses arising from suspension of work calculated by it at NT$6,854,160 per month.
11 AEL was in no position to inject further capital. In the event, Chotek and Darimbi indicated that they were not prepared to do so either. The project thus remained at a stand still.
12 In the meantime there was the deadline imposed by MOEA for the resumption and completion of the project, failing which the site would be repossessed.
13 AEL, Chotek and Darimbi thus all came to the conclusion that a new partner had to be found to take over part of their existing shareholdings or the unissued portion of the authorized capital of AHDL. In this connection, Chotek and Darimbi agreed to follow AEL. Following a meeting between OEH and some of the directors of AEL, OEH on 26 August 1986 in his letter to CP Chan confirmed as follows:
I refer to the letter from Taipei lawyer Mr Stephen Shih-Wen Ying [acting for MOEA] dated 18 August, giving notice of AHDL`s default in not complying with the requirements of raising capital needed to proceed with the construction of the Apollo Meridien Hotel, Taipei. I also refer to my meeting with you and some of your fellow-directors on 19 August.
14 This letter is to confirm the statements which I made at that meeting, defining the position of Chotek + Darimbi Holdings (C+DH) as follows:
a On the present negotiations which AEL is conducting to either sell the AHDL shares or to bring in a new partner to take up the balance of AHDL shares, C+DH will accept AEL`s decisions and comply accordingly.
b If a new partner were to be brought in to take up the majority shares, C+DH would prefer to sell out its holding entirely, provided AEL so agrees.
c In the event that AEL`s present negotiations with other parties do not appear promising of success before the deadline set in Mr Stephen Ying`s letter, then C+DH will want AHDL to call up the additional capital needed to proceed with construction so as to prevent default.
15 On 1 September 1986, an in-principle agreement was reached between AHDL and PCC at a meeting for PCC to participate in the project through the formation of a new company. What was due to PCC by AHDL would be `channelled` to this new company as the subscription by PCC for shares in this new company. Resolutions 3, 4 and 5 of this meeting read:
In respect of the outstanding project fee, (inclusive of variation) and the compensation for losses incurred due to stoppage of work including the differences in the new tax system on business taxes, shall all be paid by the new company to Pacific Co Ltd.
16 Apollo Meridien Co [AHDL] shall bear the responsibilities for all debts and liabilities incurred by it prior to the restructure.
17 The rest of the details shall be laid down clearly in the agreement for the formation of the new company.
18 On 9 September 1986 OEH reported to the Chotek Board as follows:
Ong Eng Hung reported that agreement has been reached to bring in Pacific Constrn Co (PCC) who will subscribe to the remaining AHDL shares in the project company. There will be no further investment input from Chotek. However, because of stoppage of work PCC has incurred interest losses which they will charge against the original shareholders. These charges will be taken from equity paid by shareholders & because of this Chotek`s equity in the project company will be reduced to approx 8%.
19 Ong Eng Hung also advised that details of the sale must be sorted out before 31 October and because of Chotek`s minority shareholdings, negotiations must be left in the hands of Apollo.
20 31 October 1986 was the deadline given by MOEA for submission of the scheme for reorganization of the company.
21 On 10 September 1986 OEH wrote to CP Chan on behalf of Chotek as follows:
... Following the signing on 1 September 1986 of the arrangements we made in Taipei for Pacific Construction Co Ltd to take over the balance of equity in the project company, you said that you will probably send your senior accountant Mrs Gan and Boen Ho to Taipei to draw up the detail agreements which are required to be concluded by 31 October 1986.
22 The detailed agreement with PCC (the PCC agreement) was signed on 24 September 1986. It was signed by CP Chan on behalf of AHDL. The proposed new company was to be known as `Taipei World Trade Centre Hotel Co Ltd`. The PCC agreement became abortive owing to the problems posed by its implementation through the formation of a new company. Following that, PCC reverted to its original position on its claim against AHDL under the building contract. According to TBH, a copy of the PCC agreement was given to OEH following its execution. OEH however denied this. He also said he did not enquire if an agreement had been entered into with PCC following the negotiations with PCC at which he was present. Bearing in mind the MOEA deadline, it is difficult to believe that OEH neither received a copy of the PCC agreement nor enquired on the follow up of the in-principle agreement reached with PCC on 1 September 1986.
23 In any event after the PCC agreement became abortive, another party Chyau Fu Co Ltd (Chyau Fu) of Hong Kong showed interest. Following discussions, a preliminary agreement of 16 December 1986 was entered into between Chyau Fu and AHDL. This was followed by a tripartite agreement of 17 December 1986, parties to which were PCC, Chyau Fu and AHDL (the Chyau Fu agreement). Under the Chyau Fu agreement all the rights and obligations of PCC under the building contract were to be taken over by Chyau Fu. The amount due to PCC for suspension of work up to 31 August 1986 was agreed at NT$70,650,045. According to TBH he also gave a copy each of the preliminary agreement of 16 December 1986 and the Chyau Fu agreement of 17 December 1986 to OEH. The agreements were in Chinese. At the request of OEH he made a rough English translation of each agreement for OEH but OEH denied receiving them. These agreements were entered into after negotiations conducted by CP Chan with Chyau Fu. OEH, though invited to attend, did not do so but left the negotiations to C P Chan. Eventually the Chyau Fu agreement also fell through.
24 After the Chyau Fu agreement fell through, Hong Leong Holdings Ltd (HLHL) came into the picture. This was toward the end of December 1986. The negotiations began in Singapore and then continued in Taipei in early January 1987. The negotiations were carried out by CP Chan with the directors of HLHL. OEH denied knowledge of the negotiations other than that HLHL was asking for more details. But the minutes of meeting of the Board of Chotek held on 9 January 1987 show otherwise:
The board was advised [by OEH] that Apollo Enterprises Ltd is negotiating with the Hong Leong Group for the Group to provide the remaining capital required by AHDL to complete and operate the hotel project in Taipei.
25 These minutes only came to light in the course of the trial. When cross-examined on this, OEH said:
I knew Hong Leong was interested and they had asked for more information. Maybe the word `negotiating` was used carelessly.
26 The negotiations with HLHL resulted in the execution of the JVA, the compensation agreement and the novation agreement.
27 The JVA
28 The negotiations were conducted by C P Chan representing AEL and the other shareholders of AHDL with Chow Chiok Hock in Singapore and with Chow Chiok Hock and Tan I Tong in Taipei for HLHL.
29 On 4 January 1987 an agreement was signed by CP Chan for AHDL and Chow Chiok Hock for the `Hong Leong Group`. By this agreement, the Hong Leong Group agreed to subscribe for the unissued portion of the authorized capital of AHDL (the said shares) at par. But the old shareholders were to be responsible for the losses suffered before the reorganization estimated at S$6.6m. The Hong Leong Group would absorb 50% of this S$6.6m. The next day, Chow Chiok Hock, Tan I Tong and CP Chan called on a firm of lawyers in Taipei, Tsar & Tsai, to seek advice on the implementation of this agreement. They were advised that the agreement was inappropriate in that the Hong Leong Group was not a legal entity and that it should be between the existing shareholders of AHDL and HLHL. On their advice, the JVA was entered into on 7 January 1987.
30 In substance, the JVA provided as follows:
(a) the existing shareholders waive their pre-emption rights to subscribe for the said shares and HLHL agreed to subscribe for the same and to designate a nominee to do so [cl 3(a)];
(b) the settlement of losses incurred by the AHDL [in the form of PCC`s entitlement to interest on certified payments due and its claim for compensation for suspension of work] was to be provided for by a separate agreement [cl 3(b)]; and
(c) the articles of association of AHDL were to be amended to provide for a board of ten members, seven of whom would be nominated by HLHL. A nominee of HLHL would be the chairman [cl 4(a) and (b)].
31 The parties to the JVA were HLHL representing the Hong Leong Group of the one part and AEL representing the existing shareholders of AHDL of the other part.
32 On 8 January 1987 the compensation agreement was entered into between HLHL representing the Hong Leong Group and AEL. By the recital it was stated that AEL had agreed for itself and on behalf of the other existing shareholders of the AHDL to compensate the Hong Leong Group for subscribing for the said shares at par notwithstanding the losses to the capital of AHDL sustained prior to Hong Leong Group`s entry. It went on to provide:
(a) Party B [existing shareholders] shall pay up about half the losses incurred by Apollo Hotel within two years (assessed at approximately Singapore dollars three million, three hundred thousand ($3.3m) only, the exact figure shall be based on the audit to be put up by an accountant mutually acceptable by both the parties. Interest shall be charged from the date of Party A`s [Hong Leong Group`s] investment to the date of final discharge at the prevailing rate charged by Taiwan Bank on main enterprises for two-year credit terms.
(b) in the event of the amount of such losses being in excess of the aforesaid amount, Party B shall undertake to repay same within two years and pay the abovementioned interest.
33 By cll 3 to 7, the existing shareholders were required to deposit their shares in AHDL by way of pledge to secure their obligation for their repayment to the Hong Leong Group for their share of the loss.
34 According to TBH, OEH was told of the signing of the JVA and the compensation agreement by CP Chan and a copy of each of these agreements was given to him. At OEH`s request, TBH requested Tsar & Tsai by telex of 5 February 1987 for official English translations. When the English translations from Tsar & Tsai were received by TBH from HLHL at the end of February 1987, he delivered copies of these translations to OEH. It is to be noted that OEH is not literate in Chinese. But TBH is bilingual and the Hong Leong Group had an officer who was competent to do the translation for HLHL. The only one who required these translations was OEH. This was, however, denied by OEH. But the telex to Tsar & Tsai requesting for translation was carbon copied to OEH. OEH, however, admitted in evidence as follows:
Q: See the joint venture agreement of 7 January 1987 and compensation agreement of 8 January 1987. When were you first aware that these agreements had been entered into?
A: I knew in February 1987 AEL had signed on some agreements with Hong Leong.
35 On 2 February 1987 at an informal directors` meeting of AHDL attended by OEH, Kwek Hong Png of HLHL is recorded in the minutes to have said:
Mr Kwek Hong Png expressed appreciation for the joint venture in Taiwan and said he would look forward to having close cooperation from the joint venture parties for the success of the project. Mr Chan Chun Ping added that the agreement of 7 January 1987 between Hong Leong Holdings and Apollo Enterprises Ltd had already been adopted and approved by Apollo Enterprises Ltd on or about 13 January 1987. Mr Kwek Hong Png reiterated that the reorganised company (AHDL) would only be responsible for half of the loss up to the $6.6m, any loss over $6.6m would be the responsibility of Apollo Enterprises Ltd and the other shareholders ... .
36 It is not disputed that `the reorganized company (AHDL)` referred to HLHL.
37 Then at a directors` meeting of AHDL of 10 February 1987 attended by OEH it was resolved that the remaining unissued shares of AHDL `be issued in full and that the new shares be subscribed to proportionately by existing shareholders of the company based on their shareholders [sic] as recorded in the roster of shareholders as of the date of this meeting. Any shareholder of this company who fails to subscribe before 21 February 1987 shall be deemed to have waived their right. Any unsubscribed share shall be subscribed to by Hong Leong International Hotel (Singapore) Pte Ltd ... .` Hong Leong International Hotel (Singapore) Pte Ltd (HLIH), the first plaintiff, was the nominee of HLHL to subscribe for the shares.
38 On the same day, Chotek, Darimbi, OEH and the other existing shareholders executed deeds of assignment in favour of HLIH of their pre-emption rights in respect of the said shares. The nomination of HLIH as the subscriber for the same and the assignment by the existing shareholders of AHDL of their pre-emption rights were obviously pursuant to cl 3(a) of the JVA which read:
With regard to the balance of capital in the amount of NT$1,097,550,000 (ie 75% of the total capital of Apollo Hotel Holdings Ltd) Party B [referring to existing shareholders represented by AEL] has agreed to renounce its rights to purchase in favour of Party A [referring to HLHL] which has undertaken to invest therein. Party A shall pay up the shares money in coordination with the needs for the operation project. Party A shall have the right to name the beneficial shareholder ... .
39 On 5 March 1987 the novation agreement was entered into by HLIH, HLHL and AEL. Like the JVA and the compensation agreement, this too was in Chinese. By the novation agreement, the rights and obligations under the JVA and the compensation agreement of HLHL were assigned to and assumed by HLIH. Again it is TBH`s evidence that a copy of it with Tsar & Tsai`s translation was given to OEH toward the end of March 1987.
40 Following the novation agreement there was a meeting of directors of AHDL on 13 March 1987 attended by OEH. The board `resolved that 46,625,400 shares out of the remaining 109,755,000 shares be issued at NT$10 each and that the 46,625,400 shares to be issued shall be subscribed to proportionately be [sic] existing shareholders of this company based on their shareholdings as recorded in the roster of shareholders as of the date of this meeting. Any shareholder of this company who fail to subscribe before 24 March 1987 shall be deemed to have waived their right. Any unsubscribed shares shall be subscribed to by Hong Leong International Hotel (Singapore) Pte Ltd (HLIH) through coordination of the board of directors ... .`
41 In the meantime on 6 March 1987, OEH wrote to the project architect Haigo Shen on PCC`s claim for losses due to suspension of work at NT$6,854,160 per month. He suggested that Haigo Shen certify the period of suspension and the amount of the loss. On the same day OEH wrote to Chow Chiok Hock advising him that he had instructed Haigo Shen to certify losses due to suspension of work. He suggested that payment due to PCC on the unpaid certificates and interest thereon be made by AHDL from funds coming from the `agreed Hong Leong contribution of S$3.3m`. This would remove the right of PCC to continue the work suspension. This shows that OEH was aware of the provisions of the compensation agreement.
42 As a result of OEH`s letter of 6 March 1987 Chow Chiok Hock called a meeting on 9 March 1987 of the joint venture parties attended by OEH as well. Following this meeting Chow Chiok Hock confirmed by letter of 24 March 1987 to OEH that he had clarified at the meeting that the `after restructured AHDL [ie HLIH] will be responsible for only S$3.3m of the total loss, penalty, late payment interest, etc, due to PCC amounting to a total of S$6.6m. Any sum above S$3.3m is to be paid by AEL and the other existing shareholders of AHDL. This is in accordance with the agreement for losses signed by Hong Leong Holdings Ltd and AEL representing the existing shareholders dated 8th January 1987.`
43 On 12 March 1987, OEH wrote to CP Chan stating that he was only agreeable to a settlement with PCC on a lump sum of NT$50m covering the penalty interest on the unpaid certificates and compensation for losses due to suspension of work calculated up to 31 January 1987. Effectively, this meant offering only NT$11m for the suspension of work claim. He further stated that if a lump sum within NT$50m was not acceptable to PCC, it should be left to the project architect to certify. But the project architect refused to certify unless there was a settlement. So the suspension continued. It therefore rendered the project liable to forfeiture by MOEA. A settlement had thus to be reached with PCC at the meeting scheduled for 17 March 1987. OEH turned down the request by CP Chan and Chow Chiok Hock to attend the said meeting citing other commitments. This figure of NT$50m suggested by OEH was unrealistic bearing in mind the Chyau Fu agreement. In the Chyau Fu agreement, PCC`s claim for work suspension alone was agreed at NT$70,650,045 calculated only up to 31 August 1986. This was now March 1987. The meeting took place between PCC and AHDL in Taipei on 17 and 19 March 1987. A representative of the Hong Leong Group and the project architect Haigo Shen also attended. It was chaired by the vice-president of the Land Bank of Taiwan. At this meeting CP Chan as instructed by OEH suggested a figure of NT$50m. But PCC`s claim for losses due to suspension of work alone was for NT$148m. Through the mediation of the vice-president of the Land Bank of Taiwan this claim was brought down to NT$80m and accepted by CP Chan on behalf of AHDL.
44 Following this settlement at Taipei with PCC at NT$80m on the compensation to PCC for losses due to suspension of work, meetings were held in Singapore between representatives of the Hong Leong Group and AEL. CP Chan again said OEH`s mandate was to a limit of NT$50m. Kwek Hong Png thereupon agreed to top up Hong Leong Group`s contribution of NT$55m [equal to S$3.3m] by further sums of NT$9.35m and NT$5.64m This left a balance of NT$58,536,834 which was to be reimbursed by the old shareholders of AHDL to HLIH. The amount payable by Chotek according to its shareholding of 15% of the issued shares of AHDL thus worked out at NT$8,780,525. The amount payable by Darimbi based on its shareholding of 5% of the issued shares of AHDL worked out at NT$2,926,842.
45 On 2 April 1987, OEH attended an adjourned meeting of the AHDL board. It was chaired by CP Chan who is recorded in the minutes as saying:
... in order to carry out the terms of the joint agreement between Hong Leong International Hotel (Singapore) Pte Ltd and Apollo Enterprises Ltd dated 7 January 1987 [ie the JVA] the directors have to amend the company`s articles of incorporation to increase the number of directors and to elect the new supervisor.
46 The number of directors was increased to ten. The board resolution was approved by the company in a general meeting. OEH was also present at this general meeting. These amendments were also in line with and must have been made pursuant to the JVA.
47 On 8 April 1987 OEH reported to the Chotek Board as follows:
Apollo Meridien Hotel, Taipei (AHDL)
The board was advised that negotiations with the Hong Leong Group have been completed and Taiwan govt approval obtained. Hong Leong personnel are in Taipei to accelerate work on site. Work expected to start next week.
48 On 3 July 1987, AHDL`s auditors TN Soong & Co sent to Chow Chiok Hock with copy to OEH a statement based on the settlement with PCC. It read:
Based on the data presented in the accompanying calculation, AEL and Chotek and Darimbi should pay Hong Leong in two years NT$46,857,098 and NT$11,714,275, respectively, plus the interest on the unpaid amount, starting from 2 April 1987 - the date the capital was paid in by Hong Leong to the date the repayment is fully fulfilled. The prime rate per annum charged by Bank of Taiwan as of 2 April 1987 is 6.25%.
49 Then in their report dated 30 March 1988 on the accounts for 1986 and 1987 of AHDL, TN Soong & Co, in n 6 to the accounts stated:
According to the construction contract entered into between Apollo Hotel Development Ltd (Apollo) and Pacific Construction Co Ltd (Pacific), Pacific is entitled (a) to suspend construction if the Apollo fails to pay the progress billings for a period longer than three months and (b) to require Apollo to pay indemnity compensation for the suspension. The construction of the hotel building has been slowed down since November 1985.
50 On 1 April 1987, the company reached an agreement with Pacific to pay the interest on delayed payment and the compensation for the suspension of the construction aggregating NT$128,526,834.
51 The audited accounts were approved by the board of AHDL at a meeting on 30 March 1988 attended by OEH. The minutes stated:
A discussion ensued on the `notes to the accounts`, after which the financial statements for the year ended 31 December 1986 were approved.
52 Having subscribed for the said shares at the par value of NT$10 per share in accordance with the JVA, HLIH claimed reimbursement for the shortfall in the value of the said shares due to the said losses pursuant to the compensation agreement less the amount it agreed to absorb. AEL paid up its portion of the loss. But Chotek and Darimbi refused. Accordingly, HLIH commenced these proceedings on 19 January 1990 against Chotek and Darimbi in S 129/90 and 130/90 for the respective sums of NT$8,780,525 and NT$2,926,842 with interest according to the rate charged by the Bank of Taiwan pursuant to the compensation agreement or alternatively under s 9 of the Civil Law Act (Cap 43).
53 On 12 June 1991, HLHL was joined as the second plaintiff and AEL the second defendant in both suits. The suits were then consolidated.
54 On the issue of acquiescence, ratification, affirmation or estoppel the main plank of the defence of Chotek and Darimbi rested on the evidence of OEH who denied that he was given copy of each of the three agreements with their translations by TBH soon after their execution. According to OEH, the agreements were given to him by Kwek Leng Beng of HLHL on 31 March 1988 at the office of one Kwek Leng Peck in Hong Leong Building.
55 The events enumerated earlier clearly show that Chotek and Darimbi as minority shareholders in AHDL entrusted the negotiations and the execution of the PCC and the Chyau Fu agreements to CP Chan, so also the negotiations on Hong Leong Group`s entry into AHDL. That OEH was kept informed of the negotiations with the Hong Leong Group and agreed to go along with the agreements entered into by CP Chan on their behalf is also confirmed by OEH:
A: The first time was when he [CP Chan] told me Hong Leong was showing interest. Then some days later I asked him and he said Hong Leong had decided to take up the balance of the shares and he mentioned one condition that of the compensation for stoppage and interest that Hong Leong would pay S$3.3m. Anything above that would be borne by AEL and ourselves.
Q: Based on your evidence your first conversation with CP Chan would have taken place before the 9 January 1987 board [of Chotek] meeting in AB193B?
A: Yes.
Q: The second conversation would have been after 9 January 1987?
A: Yes.
Q: As in the case of Chyau Fu, it would have been apparent that AEL was negotiating on their own behalf and that of Chotek and Darimbi?
A: Negotiating yes; but committing no.
Q: When CP Chan told you that Hong Leong had agreed to come in to take up 75%, was it presented as a commitment?
A: He told me Hong Leong was willing to come in on that basis, that Hong Leong would pay $3.3m to PCC and we pay the balance. On that basis I agreed.
56 Following the earlier conversation, OEH advised the Chotek Board at its meeting on 9 January 1987 as follows:
Apollo Meridien Hotel Taipei (AHDL)
The board was advised that Apollo Enterprises Ltd is negotiating with the Hong Leong Group for the group to provide the remaining capital needed by AHDL to complete and operate the hotel in Taipei.
57 Eventually, the Hong Leong Group`s agreed contribution exceeded S$3.3m in respect of PCC`s claim when it agreed to absorb the further sums of NT$9.35m and NT$5.64m. Its contribution was effected by HLIH subscribing for the said shares at par. HLIH was in turn to be reimbursed by the existing shareholders of AHDL the shortfall in the value of the said shares due to the existing losses less HLIH`s agreed contribution.
58 On the evidence, I am satisfied that CP Chan was duly authorized to negotiate and conclude the three agreements on behalf of Chotek and Darimbi. This authority was in no way detracted by the limit placed by OEH at NT$50m for the settlement with PCC. The limit was placed on behalf of Chotek and Darimbi as minority shareholders of AHDL on AHDL`s negotiations with PCC and not on their liability to indemnify HLIH. That limit was also unrealistic bearing in mind the length of the suspension of work. It was also unreasonable because of the danger of the whole project being taken back by MOEA unless a settlement with PCC was reached. Alternatively, if the authority of CP Chan was only to negotiate and not to commit Chotek and Darimbi to paying their portion of the loss under the JVA and the compensation agreement, Chotek and Darimbi have in any case by their conduct acquiesced to, ratified, or affirmed, or are otherwise estopped from denying the same.
59 According to TBH he gave a copy each of the JVA and the compensation agreement in Chinese to OEH shortly after they were executed. At OEH`s request he wrote to Tsar & Tsai for English translations of the same. There was no reason for TBH or CP Chan to require the English translations as they are both literate in Chinese. Neither did the Hong Leong Group because they had an officer competent to do the translations. OEH was the only one that required the English translations. I therefore accept TBH`s evidence that the agreements and their English translations were duly handed over to OEH by TBH soon after their receipt by him and not on 31 March 1988 at Kwek Leng Peck`s office. If OEH had not received copies of these agreements soon after they were signed, he would have enquired of AEL as to Hong Leong Group`s interest bearing in mind the danger of forfeiture of the whole project if no scheme acceptable to MOEA was afoot to rescue the project.
60 There were also the numerous meetings at which Hong Leong Group`s participation as a shareholder in accordance with the JVA and the liability of the old shareholders of AHDL to reimburse Hong Leong Group for the existing losses to the capital of AHDL in accordance with the compensation agreement were discussed. To reiterate, these include the following:
(i) the informal directors` meeting of AHDL on 2 February 1987 held at HLHL`s office attended by OEH. The minutes read:
Mr Chan Chun Ping added that the agreement of 7 January 1987 between Hong Leong Holdings Ltd and Apollo Enterprises Ltd had already been adopted by Apollo Enterprises Ltd on or about 13 January 1987. Mr Kwek Hong Png reiterated that the reorganized company (AHDL) would be responsible for half the loss up to S$6.6m, any loss over S$6.6m would be the responsibility of Apollo Enterprises Ltd and the other shareholders.
(ii) the AHDL board meeting of 10 February 1987 at the office of AEL to approve the issue of 109,755,000 shares to HLIH, attended by OEH. This is what was recorded in the minutes:
Chairman reported that the Ministry of Economic Affairs, ROC, had apporved [sic] the proposed joint venture with Hong Leong in AHDL subjected [sic] to compliance with the Companies Act and Foreign Investment Commissions regulations. The directors, therefore should proceed with all the necessary paper works [sic] requirements in order to comply with the terms of the agreement with Hong Leong.
Then to comply with the terms of the three agreements with the Hong Leong Group, Chotek, Darimbi and OEH executed the deeds of assignment on 10 February 1987 assigning their rights to subscribe for the said shares of AHDL to HLIH.
(iii) the AHDL directors` meeting of 2 April 1987 on the apportionment of the payment to PCC. The minutes read:
Mr Kwek Leng Joo referred to the meeting in Taipei on 19 March 1987 and gave a report of the discussion which took place and how the parties concerned came to a settlement on the payment of compensation on work stoppage, other penalties and interests. At the meeting at which representatives from Land Bank were present, it was proposed that as a settlement, the old AHDL would pay Pacific Construction Co Ltd (Pacific) a round sum of NT$80m. Pacific had originally submitted a claim for NT$148m with supporting documents. However, Mr Chan Chun Ping said that the old AHDL was only prepared to pay NT$50m. After much discussion, on a gesture of goodwill, the chairman agreed that the new AHDL would bear an additional NT$9.35m as ex gratia payment and the interest from 1 February 1987 to 31 March 1987 (amounting to NT$5.64m).
61 Therefore the final account would be as follows:
NT$ 80,000,000
+ NT$ 48,526,834 (interest up to 31 March 1987)
NT$128,526,834
- NT$ 55,000,000 (new AHDL pays S$3.3m)
NT$ 73,526,834
- NT$ 9,350,000 (new AHDL`s ex-gratia payment)
- NT$ 5,640,000 (new AHDL`s interest for February and March 1987)
NT$ 58,536,834 (total payable by old AHDL)
62 `New AHDL` referred to HLIH and `old AHDL` to the old shareholders of AHDL. By this account, Chotek and Darimbi have to pay 20% of the NT$58,536,834. The minutes of this board meeting setting out this apportionment was sent to OEH. There is also the evidence that the Chotek board at its meeting of 8 April 1987 was advised by OEH that `negotiations with the Hong Leong Group have been completed & Taiwan govt approval obtained. Hong Leong personnel are in Taipei to accelerate work on site. Work expected to start next week.`
63 The plaintiffs` claim is based on this apportionment to which no objection was raised by Chotek and Darimbi on receipt of the minutes. HLIH went on to discharge its obligations under the JVA and the compensation agreement, subscribing for the said shares at par when the value of the same was below par because of the said losses incurred by AHDL. AEL also went on to discharge its apportioned liability. The hotel project was accordingly revived and the investments of Chotek and Darimbi were thus saved from forfeiture.
64 In , there were two proprietors of an estate, the father and son. The son without the express authority from the father agreed to sell the whole estate on behalf of both and without express authority signed the contract for sale on behalf of both, and the father never expressly asserted or signed the contract but after knowledge of the contract did not within reasonable period disavow it or express absolute dissent. The father was held bound by the contract because of his tacit acquiescence. At p 769, Sir John Stuart, the Vice-Chancellor, said:
It is clearly established that the father had full notice of the agreement, if not immediately, or on the same day, yet certainly within five days after it was signed. It cannot be considered that any express act on his part, such as signature of the agreement by himself or any other solemnity by him after he became privy to the act done by his son on behalf of both, was essentially necessary. Subject to his right to a reasonable opportunity to express his dissent, every additional day and hour of silence after he became privy to the contract operates as tacit acquiescence, and raised the presumption of assent. It cannot be said that tacit recognition is insufficient, for, if in perfect silence he accepted the price to which he knew he was entitled according to the agreement, it could not be said that the assent and recognition were not sufficiently binding.
65 In an agent of the railway company, without any direct authority, agreed to sell to the plaintiff a piece of land of the company at a certain price per acre. Some of the terms were that the company should lay down a branch railway to the land; that the plaintiff, who was going to erect ironworks on the land, should use the company`s railway in preference to others; use it whenever reasonably practicable, and for the longest distance it was reasonably capable of use; and that the traffic to and from the works should be conveyed on the terms of a prior agreement between the parties relating to another piece of land bought by the plaintiff from the company, and the other stipulations of that agreement carried out. The company`s surveyor measured the land, the company`s engineer laid down the branch railway to it, the plaintiff was let into possession, and his machinery was brought in the company`s wagons to the land, and deposited there. After this the company refused to complete the sale. Turner LJ held that although the railway company`s agent contracted without sufficient authority, the company by its acts had ratified the contract. At p 465 he said:
But, then, it was said on the part of the plaintiff that the directors ratified this contract, and I think they must be held to have done so. Upon this contract being entered into, the machinery belonging to the plaintiff, which had been deposited on some land on the west of the railway which the plaintiff alleges that he had previously bought from the company, was brought over to the land in question, and there deposited. Other machinery belonging to the plaintiff, which had been landed at the company`s harbour, was also brought by the company`s waggons to and deposited on this land. The plaintiff was let into possession of the land. The land was measured by an officer of the company. The company laid down lines of rails for the purpose of communication between this land and their main line of railway, and they made borings in the land. These acts were in conformity with the contract, and they amount I think to a representation by the defendants to the plaintiff that the contract was a subsisting and valid contract.
66 Chotek and Darimbi are therefore bound even if they did not expressly authorize AEL to negotiate and conclude JVA, the compensation and the novation agreements on their behalf. By their conduct, especially by their assignment of pre-emption rights and agreeing to the amendments of the articles of AHDL in line with the JVA, they had ratified or affirmed or acquiesced to the same.
67 Further by acting as though they agreed to be bound, Chotek and Darimbi are also estopped from contending otherwise. Spencer Bower and Turner on The Law Relating To Estoppel By Representation (1977 Ed) at p 52 state:
Where A and B are parties to a negotiation or transaction, and, in the course of the bargaining or dealings between them, A perceives that B is labouring under a mistake as to some matter vital to the contract or transaction, he may come under an obligation to undeceive B, at all events if the circumstances are such that his omission to do so must inevitably foster and perpetuate the delusion. In such cases silence is in effect a representation that the facts are as B mistakenly believes them to be, and A is accordingly estopped from afterwards averring, as against B, any other state of facts. A duty of this kind may arise when B, or even a third person, in the presence or to the knowledge of A, states or does something which indicates to A that B is being, or will be, misled unless the necessary correction be made, whereupon, an omission on A`s part to make the correction amounts to a tacit adoption by him of the incorrect statement as his own.
68 In , the House of Lords held that if a man, either by words or by conduct, has intimated that he consents to an act which has been done, and that he will offer no opposition to it, although it could not have been lawfully done without his consent, and he thereby induces others to do that from which they otherwise might have abstained, he cannot question the legality of the act he had so sanctioned to the prejudice of those who have given faith to his words, or to the fair inference to be drawn from his conduct. In such cases proof of positive assent or concurrence is unnecessary. It is enough that the party had full notice of what was being done, and the position of the other party was altered.
69 Chotek and Darimbi are therefore liable to reimburse the first plaintiff in accordance with the terms of the JVA, the compensation agreement and the novation agreement. Accordingly judgment is entered in favour of the first plaintiff against Chotek in the sum of NT$8,780,525 and against Darimbi in the sum of NT$2,926,842 or their equivalent in Singapore currency, both sums pursuant to cl 1 of the compensation agreement to carry interest from 2 April 1987 the date of HLIH`s capital remittance to AHDL to date of judgment at the Bank of Taiwan`s prime two year non-secured lending rate. The plaintiffs` claim against AEL is dismissed. The costs of the plaintiffs and of AEL are to be taxed and paid by Chotek and Darimbi.
70 Plaintiffs` claims against the first defendants in both suits allowed.
Michael Hwang and Goh Choon Hiang (Allen & Gledhill) for the plaintiffs in both suits
Koh Kok Wah (Wendy Wong & Koh) for the first defendant in S 129/90
Gan Choon Beng (Chu Chan Gan & Ooi) for the first defendant in S 130/90
Muthu Arusu and Philip Tay (Drew & Napier) for the second defendant in both suits