In the High Court of the Republic of Singapore
[1995] SGHC 72
Suit No 1069 of 1994
Between
Apollo Enterprises Ltd
… Plaintiff
And
Dynasty Theatre Nite-Club KTV & Lounge Pte Ltd
… Defendant
grounds of decision

This judgment is subject to final editorial corrections approved by the court and/or redaction pursuant to the publisher’s duty in compliance with the law, for publication in LawNet and/or the Singapore Law Reports.
Apollo Enterprises Ltd v Dynasty Theatre Nite-Club KTV & Lounge Pte Ltd
[1995] SGHC 72
Suit No 1069 of 1994
Lai Siu Chiu J
15 March 1995
1 Judgment:
2 Coram: Lai Siu Chiu J
3 GROUNDS OF DECISION
4 The background
5 The plaintiffs are the owners of a building known as 407 Havelock Road, Apollo Hotel, Singapore 0316 (the Hotel). The defendants at the material time were the tenants of the circular block of the Hotel comprising of five levels with an area of 64,229 sq.ft. (the premises), by an agreement dated 23 November 1993 (the lease). The lease was for five (5) years commencing on 17 September 1993 and expiring on 16 September 1998 and one of the terms of the lease was that the defendants would pay the monthly rent and service charge in advance as well as a refuse charge.
6 The plaintiffs alleged in the statement of claim (filed on 30 June 1994) that the defendants failed to make punctual payment of the monthly rent and refuse charges to the plaintiffs commencing from about 16 January 1994 and on or about 26 May 1994 the defendants wrongfully vacated and or abandoned the premises without the plaintiffs' consent. The plaintiffs accepted the repudiation of the lease by the defendants and terminated the same on or about 27 May 1994 without prejudice to their rights. The plaintiffs claimed from the defendants $95,283.59 representing the balance of the arrears of rent, refuse and other charges due under the lease as at 30 June 1994 after deducting the security ($1,059,777) and initial deposits ($100,000) they held and less the proceeds of a distress action they had levied on the premises.
7 The application
8 After the defendants had entered an appearance to the writ and had filed their defence and counterclaim, the plaintiffs applied vide summons in chambers entered no 4587 of 1994 (the application) for inter alia the following orders:
9 1. the defence and counterclaim be struck out;
10 2. judgment against the defendants for a declaration that they had breached the lease;
11 3. final judgment for various sums representing arrears of rent as well as service, pest control and refuse charges;
12 4. interlocutory judgment with damages to be assessed for loss of rental and service charges for the remaining period of the lease, alternatively in the event a new tenant is found, for loss of rental and service charges until the commencement date of a new tenancy.
13 The application was heard by the learned assistant registrar on 12 October 1994 and she granted unconditional leave to the defendants to defend the action, ordered costs in the cause for the summary judgment aspect of the application and ordered the plaintiffs to pay costs fixed at $600 for the costs of the striking-out aspect of the application.
14 The plaintiffs appealed against the orders made by the assistant registrar by way of Registrar's Appeal No 229 of 1994 and I allowed the same when it came on for hearing before me. The defendants have now appealed against the following orders which I made:
15 1. final judgment for the plaintiffs for rent, service charge, pest control and refuse charges for the period 1-30 June 1994 together with contractual interest of 1% per month until payment ie $262,794.31 (interest as at 15 March 1995);
16 2. interlocutory judgment for the plaintiffs in respect of the defendants' premature termination of the lease with damages to be assessed by the assistant registrar such assessment not to be made until after all the floors in the premises have been let and costs of the assessment to be reserved to the registrar;
17 3. dismissal of the defendants' counterclaim for refund of the security deposit; 4.costs of the appeal and costs of the application to the plaintiffs to be taxed unless otherwise agreed.
18 The appeal
19 Before I go into the affidavits filed by the parties for the application, I need to refer to the defence and counterclaim which was the subject of the first part of the plaintiffs' application. In the defence and counterclaim the defendants:
20 1. alleged they were forced by circumstances to vacate and or to abandon the premises; on 25 February 1994 the plaintiffs wrote to the defendants to say they would be renovating the first floor of the premises which included demolishing an area for conversion into a walkway and installing new glass partitions and doors;
21 2. alleged they were required to clear all their belongings in the area and to remove their internal temporary partitions, causing much inconvenience and disruption in their business;
22 3. alleged the plaintiffs' construction of two (2) passenger lifts left a big hole facing the defendants' dance hall which was unsightly and unpresentable and affected the defendants' business. The defendants were forced to put up a temporary partition to block the hole from sight. As the passenger lifts were not operational the fourth and fifth floors could not function for the defendants' intended use as a nightclub and members' club. Seven carpark lots in front of the premises were taken up by the plaintiffs' constructions materials in breach of the plaintiffs' covenant under the lease to provide 20 reserved carpark lots to the defendants;
23 4. said cracks appeared on the beams supporting the ceiling on the fourth floor and the defendants had to engage structural engineers to look into the matter, cracks were also found in the ceiling of the first floor;
24 5. said noise from the first floor escalator penetrated the second floor and affected the defendants' pub business; the defendants were compelled to seal off the escalator for sound proofing considerations but their efforts were unsuccessful;
25 6. contended that as the lifts were not operational there was no access to the second floor and customers had to use the fire staircase which was not only inconvenient but also commercially unattractive;
26 7. alleged that the above factors which constituted a breach of the covenant of quiet enjoyment under the lease, all affected the defendants' business to the extent where they could no longer function at the premises;
27 8. complained the plaintiffs refused the defendants' written request for an extension of time to pay the rent and service charges. The defendants attempted to terminate the lease in their letter to the plaintiffs dated 18 March 1994 and requested the plaintiffs to find alternative tenants, but the plaintiffs refused;
28 9. said they then proposed to pay the plaintiffs a month's rent on 1 May 1994 and 1 months' rent on 1 June 1994 but this was rejected by the plaintiffs who insisted on payment of the full outstanding sum;
29 10. pointed out that on 29 April 1994 the plaintiffs filed and on 6 May 1994 they issued, a writ of distress against the defendants who ceased operations on 14 May 1994; the public auction of the defendants' goods was held on 26 May 1994, the plaintiffs accepted the defendants' repudiation and terminated the lease on 27 May 1994 and the keys to the premises were accordingly returned to the plaintiffs on 30 May 1994;
30 11. admitted they failed to pay punctually the rent and refuse charges to the plaintiffs as alleged in the statement of claim and also that they owed the plaintiffs the sum of $1,241,078.69 set out in para 8 of the statement of claim save and except for the rent due on 1 June 1994 amounting to $240,030.17 and interest thereon amounting to $2,400.30, they also admitted owing to the plaintiffs the sum of $927 for debris clearance;
31 12. counterclaimed from the plaintiffs the sum of $148,096.88 made up as follows:
32 (i) 3 months security deposit $1,059,777.00
33 (ii) net proceeds of sale from distress action 87,895.10 Total 1,147,672.10 Less:
34 (iii)arrears in monthly rental, pest control and refuse charges as at 30 May 1994 $ 964,642.34
35 (iv) interest on the arrears as at 30 May 1994 34,005.88
36 (v) cost of cleaning and clearing debris left behind by the defendants 927.00 Total $ 148,096.88
37 13. contended that the plaintiffs are under a duty to mitigate to minimise their loss and must make concerted efforts to re-let the premises, the plaintiffs are not entitled to the loss of rental, service charges and pest control charges and interest thereon after termination of the lease;
38 14. counterclaimed for damages for breach of the covenants of quiet enjoyment and repair under the lease.
39 I next turn to the affidavits filed in support of and to oppose, the application. On behalf of the plaintiffs Chan Man Ho @ Tan Boen Ho (Chan) their managing director deposed to the following facts in his first affidavit:
40 1. the lease contained inter alia the following clauses:
41 3a(i) the tenant shall pay the rent for the first, second and third levels of the premises amounting to dollars two hundred and thirty-one five hundred and thirty-nine only (S$231,539.00) being 42,098 sq.ft. at $5.50 per sq. ft. (inclusive of service charge at $1.00 per sq.ft.) on 16 January 1994;
42 3a(ii) the rent for the fourth and fifth levels amounting to dollars one hundred and twenty-one thousand seven hundred and twenty and cents fifty only (S$121,720.50) being 21,131 sq.ft. at $5.50 per sq.ft. (inclusive of service charge at $1.00 per sq.ft.) of the premises shall be payable by the tenant two (2) weeks after the new passenger lifts are in operation ie the lifts can transport passengers or goods to the fourth level and the fifth level and when the additional electricity supply from PUB is made available to the tenant;
43 3a(iii) the tenant shall pay to the landlord during the said term the total monthly rent of dollars three hundred and fifty three thousand two hundred and fifty-nine only ($353,259) for monthly rental of 64,229 sq.ft. at $5.50 per sq.ft. (inclusive of service charge at $1.00 per sq.ft) and dollars one thousand ($1,000) for monthly refuse charge, monthly in advance on the first day of every calender month and clear of all deductions;
44 5(a) the tenant shall on or before the execution of the ..lease provide the landlord a security deposit equivalent to the aggregate of three (3) months' rent amounting to Dollars One Million Fifty-nine thousand Seven hundred and Seventy-seven only ($1,059,777)....as a deposit for the due observance and performance by the tenant of the tenant's covenants and conditions herein contained....
45 13(a)(1) if the rent hereby reserved or any part thereof or the tenant's proportion of service maintenance charge shall be unpaid for fourteen (14) days after any of the days on which the same ought to have been paid or if the defendants commit breach or suffer to occur any breach or default in the due and punctual observance and performance of any of the covenants obligations and provisions of this lease or any rules made hereunder then and in any one or more of such events the landlord at any time thereafter shall have the right to re-enter into and upon the demised premises or any part thereof...but without prejudice to any action or other remedy which the landlord have or might have....
46 13(11) However the landlord may nevertheless terminate this agreement by giving three (3) days' written notice to the tenant in the event that the tenant shall:-
47 (ii) have all or a substantial portion of its capital stock or assets seized or have an execution order made against it; or
48 (iii) have been dissolved, liquidated or sold to a third party or entered into any agreement to effect the same;
49 2. the defendants failed and or refused to make punctual payment of the monthly rent and refuse charges to the plaintiff from about 16 January 1994 despite repeated requests by the plaintiffs. In fact the defendants did not even pay the balance of the first month's rent, pest control, refuse and service charge (less the deduction of the initial deposit of $100,000) although they took possession of the premises on 17 September 1993 for rent-free fitting-out works;
50 3. when the plaintiffs refused to accede to the defendants' request for extension of time to pay the rent, the defendants terminated the lease forthwith, in breach of the lease;
51 4. the plaintiffs did not accept the termination and the defendants then proposed in their letter dated 12 April 1994 to pay one month's rent on 1 May 1994 and thereafter half month's rent until the outstanding rent was paid, which proposal the plaintiffs also rejected;
52 5. the defendants then complained for the first time on 20 April 1994 that there were serious cracks on the first level of the premises notwithstanding that they had inspected the premises before they commenced the fitting-out works and had not then complained; they had leased the premises on an 'as is where is' basis. In any case the plaintiffs engaged structural engineers LSB Engineering Consultants (LSB) who found the cracks were insignificant and the building structurally sound and whose report was accepted by the Building Control Division (BCD) of the Public Works Department;
53 6. on 16 May 1994 the defendants sent a notice to the plaintiffs to say that they had ceased business on 14 May 1994 followed by a letter from their solicitors that the defendants would vacate the premises on 20 May 1994. On 26 May 1994 the defendants wrongfully vacated/abandoned the premises and returned the keys on 30 May 1994;
54 7. the plaintiffs accepted the repudiation by the defendants and terminated the lease on 27 May 1994; they paid $927 to clear the debris left behind by the defendants and $950 to repair a cargo lift damaged by the defendants during their fitting-out works;
55 8. the plaintiffs were not able to let out the premises for June 1994 hence their claim for rent for that month by way of damages. As at 2 August 1994 (date of filing Chan's affidavit) the plaintiffs had not found other tenant(s) to mitigate their loss although they were in negotiations with certain interested parties, hence the plaintiffs' claim for loss of rent and service charges for the first three levels at $238,485.17 per month between 1 July to 16 September 1994 and their claim for loss of rental, pest control, refuse and service charges for the fourth and fifth levels 2 weeks after the passenger lifts come into operation to 16 September 1994, alternatively if a tenant is found, from the date 2 weeks after the new passenger lifts come into operation to the date of the new tenancy. For that reason the security deposit cannot be refunded to the defendants as the same is to secure outstanding rent, other charges and damages in the event of a breach of the lease;
56 9. the defendants' purported defence and counterclaim was a farce -- they abandoned the premises because of poor business and had closed down their discotheque and the pub on the first and second levels respectively, not because of the alleged serious cracks in the Hotel;
57 10. cl 9(c) of the lease allowed the plaintiffs to have access to the premises for purposes of renovation and repair which included construction of the 2 lifts for the defendants' exclusive use, this took place during the day whereas the defendants' business hours were after 6 pm. Construction of the lifts was also a term of the lease < cl 3(a)(ii) > and that was the reason why the defendants were not charged rent for the fourth and fifth levels of the premises until after the lifts came into operation. The defendants erected a gypsum board 'partition' (which they left behind when they vacated the premises) even before the lift shafts were constructed. The allegation that the plaintiffs breached the covenant of quiet enjoyment was therefore absolutely baseless, in any event the lifts were constructed outside the premises;
58 11. there was also no truth in the defendants' other allegation of inconvenience caused by the glass partition as it was erected outside the premises and outside the area of the defendants' gypsum board;
59 12. under cl 12(c) of the lease the plaintiffs agreed to provide 20 reserved car park lots for the defendants' VIP customers at seasonal rates but the defendants never applied nor paid for, these lots. Had they done so they would have been allotted as the Hotel has 333 carpark lots;
60 13. the defendants had decided to and had, boxed off the escalators at their own cost before the lease commenced; this was confirmed in a letter from the defendants dated 1 February 1994 (p 69 of exh TBH-1) before their commencement of business on the first and second levels; however they still had access via a door by the escalator to the second level. When they closed their discotheque on the first level in February 1994, the defendants used the fire escape staircase to gain access to the second level as they did not want their customers to pass through a dark/vacant area on the first level where the discotheque used to be -- their decision had nothing to do with the construction of the new lifts. By the defendants' letter dated 7 March 1994, the plaintiffs were informed that the former were renovating the second level with a view to changing the pub to a nightclub, therefore there was no truth in the defendants' allegation that they were inconvenienced by and abandoned the premises due to, the construction of the lifts which construction would have been completed within reasonable time if the defendants had not abandoned the premises;
61 14. in breach of fire regulations the defendants locked a fire escape staircase and further falsely alleged that the building was haunted causing damage to the plaintiffs and to the reputation of the Hotel;
62 15. the defendants had ceased business by the dates (6 May 1994) of the writ of distress and public auction (26 May 1994).
63 In response to Chan's first affidavit, the defendants filed an affidavit by their director Liu Win Yin (Liu) who said:
64 1. the defendants took possession of the premises on 2 November and not on 17 September 1993. The defendants spent approximately $5m in renovating and equipping the premises to operate a deluxe entertainment centre which investment was lost when they were forced to vacate the premises due to the following factors:-
65 a. they noticed cracks on the fourth and fifth levels only after the false ceilings were removed in March 1994. When their engineers refused to certify their renovation works the defendants became concerned about the cracks and asked their engineers East West Engineering Co (East West) to look at all five levels; the defendants informed the plaintiffs on 12 April 1994 of the cracks and when the plaintiffs did not respond to the defendants' request for structural engineers to look into the matter, the latter notified the BCD; the defendants wrote again to the plaintiffs on 20 April 1994 and as a precautionary measure they stopped their discotheque operations temporarily in case the loud music affected the structural integrity of the Hotel; the cracks caused fear in the defendants and their customers;
66 b. if the plaintiffs' structural engineers LSB were of the opinion that the defects did not affect the structural integrity of the Hotel, why would they advise that the situation be monitored for 6 months to confirm no further signs of cracking? LSB obviously had no confidence in the structural integrity of the Hotel;
67 c. LSB further advised that the load imposed on the fifth level should not exceed 3.0 KN/m or 60 lbs/ft on the circular floor bounded by the nine columns 'to prevent further overloading of the structure' which seems to suggest there is already overloading on the building;
68 d. the BCD accepted the report of LSB on condition the plaintiffs complied with the monitoring measures and rendered periodic reports to the BCD on such measures;
69 2. the defendants' business was poor as a result of the above factors and due to the defendants' construction of the passenger lifts as well as the lack of carpark lots in front of the premises;
70 3. due to their poor business the defendants asked for time to pay the rent but their request was refused by the plaintiffs who levied distress and seizure on the premises causing the defendants much embarrassment and having to cease business on 14 May 1994;
71 4. the defendants locked one (of many) fire escape staircase as one of their amplifiers was stolen previously and they sought and obtained Chan's permission to lock the staircase which in any case was already locked when the defendants took over the premises;
72 5. the defendants denied having damaged the cargo lift, it was already faulty when they did the fitting-out works in or about December 1993 - it could not close properly and was not in alignment with, when it arrived at, a floor. The plaintiffs' workers who were using the same lift for their own renovations (air-conditioning and lifts) could have damaged the lift;
73 6. as the lease was terminated on 27 May 1994 the plaintiffs are not entitled to damages from June 1994 and the interest thereon;
74 7. the plaintiffs' calculations are incorrect and the defendants are entitled to a refund of $148,096.88 after deducting the arrears of rent, pest control and refuse charges as at 30 May 1994.
75 On the plaintiffs' behalf Chan filed a rebuttal to the allegations raised in Liu's affidavit, Chan:
76 a. pointed out that the defendants accepted the terms of the plaintiffs' offer to rent the premises (through Chesterton International Property Consultants) on 18 June 1993. It was agreed that the plaintiffs would apply for change of use (for entertainment purposes) while the defendants would apply for all the requisite licences including the entertainment and liquor licences -- the defendants only obtained the liquor licence on or about 17 September 1993; they delayed taking possession of the premises because they did not or could not obtain the requisite licences and permits stipulated under cl 4(ii)(a) of the lease;
77 b. said as the defendants did not commence their fitting-out works until November/December 1993 the plaintiffs agreed to give them a month's extension and to commence payment of rent for the first 3 levels from 16 January 1994 instead of 16 December 1993, the defendants therefore had a longer fitting-out period; the first three levels were served by escalators;
78 c. contended that the allegations that the defendants were forced to leave the premises were fabricated -- they prematurely terminated the lease because of bad business since early March 1994 evidenced by the fact that they did not pay the rent since January 1994 and sought every excuse not to do so;
79 d. pointed out he was informed by another tenant of the plaintiffs who used the same contractor as the defendants that the latter instructed the contractor to damage the beams and ceiling of the premises to create cracks in order to delay payment of rent. The defendants have not produced any evidence to support their allegation of the serious nature of the cracks: the defendants' engineers East West had endorsed the defendants' renovation plans for submission to the BCD and these plans certified that the first 3 levels were structurally sound;
80 e. pointed out that cl 3(i) of the lease stipulated that the defendants had to properly sound proof the premises and control/confine the noise to the premises; if they failed to do so and the resultant vibrations caused cracks in the premises, defendants cannot rely on their own breach of the lease to justify their non payment of rent and other charges; they closed their discotheque before LSB issued their report;
81 f. denied that the plaintiffs did nothing to rectify the cracks; the defendants have no basis to challenge the findings of LSB, the alleged cracks were old cracks which had already been repaired and stabilised; the fourth level was not yet opened to the public and no access was given to the defendants' employees either, so how could the defendants' customers and employees have seen the alleged 'conspicuous and pronounced cracks'?
82 g. said it was untrue that the weight restriction which was only of the fifth level affected the defendants' entertainment business or that it was unreasonable to expect the defendants to observe the restriction -- that level was meant to be a members' club;
83 h. denied that the plaintiffs' levy of distress and seizure caused the defendants to cease business, the defendants themselves sold off all the other items not seized by the sheriff, on 19 May 1994. Indeed they substituted and sold off new karaoke sets, seized by the sheriff with, old sets;
84 i. denied he had been approached by the defendants let alone that he had agreed, to allow them to lock the fire escape staircase, in fact he had written to the defendants drawing their attention to the fire regulations and reminding them to remove all unwanted items and to unlock the padlock the defendants had put on the staircase. When the defendants took possession of the premises the whole of the circular block of the Hotel was unoccupied, hence the fire escape staircase was locked to prevent trespassers from gaining entry but once the premises were occupied the same had to be unlocked to comply with fire regulations;
85 j. pointed out that prior to Liu's affidavit, the defendants had never denied liability for the cargo lift damage for which the plaintiffs after notifying the defendants on 6 December 1993, followed up by forwarding a bill for the cost of repair on 24 February 1994. The plaintiffs' workers carried out the air-conditioning works before the defendants moved in while installation of the lifts commenced in late March/April 1994, therefore the plaintiffs' workers could not have damaged the cargo lift in December 1993;
86 k. the defendants' counterclaim was misconceived as they had breached several covenants in the lease, the premises were not reinstated to their original condition when they vacated and neither were the premises cleaned up;
87 l. explained that the plaintiffs have not been able to let out the premises since April 1994 although they had engaged major property consultants to procure tenants on their behalf. The difficulty has been compounded by the defamatory remarks which Liu published in the Chinese press (LianHe Wanbao) on 18 May 1994 alleging that the premises were haunted. Contrary to what Liu had alleged in his affidavit, in that same article he had said that the reasons for the defendants' closure of business were inexperience, staff problems and keen competition;
88 m. pointed out that the defendants had not even begun renovating the fourth and fifth levels when they moved out, but their renovations of the first three levels were major enough to warrant approval from their structural engineers and the BCD;
89 n. denied that he had represented to the defendants that the lifts would be ready by end March 1994;, the lifts were estimated to be ready by June 1994 according to minutes of a site meeting at which East West was present;
90 o. pointed out that the issue of the carparks was not an issue because the defendants applied for carparks for 7 vehicles at a special concessionary rate which the plaintiffs rejected, thereafter the defendants never applied for nor paid for carpark lots;
91 p. the plaintiffs are entitled to costs on an indemnity basis under cl 16 of the lease, for the preparation of the lease and are therefore claiming $9,746.75.
92 In reply to Chan's second affidavit Liu filed a second affidavit wherein he:
93 1. denied that the defendants were late in fitting out the premises and were given a longer period to do so, in fact the period given was only 2 months;
94 2. denied he had fabricated the reasons for the defendants' giving up the premises let alone that he had instructed the defendants' renovation contractor to damage the beams and ceilings to create cracks; in so far as the cracks on the ceiling of the first level were concerned, they were brought to the defendants' attention by BCD; East West were not engaged to check or certify the cracks but to certify the renovation works which they did, before the defendants noticed the cracks, the defendants left it to the BCD to deal with the problem of the cracks to save incurring additional costs;
95 3. denied that he fabricated the reasons for not paying rent; the defendants did not want to continue with the discotheque as a precautionary measure and also for public safety; the reasons for ceasing business were true and he gave to the press some of the other reasons which affected his business. He did not inform the press of the plaintiffs' breaches of the lease so as not to sour relations with the plaintiffs further;
96 4. pointed out that it was ridiculous to accuse the defendants of switching the items seized by the sheriff with old items as the seized items all had court stickers which cannot be tampered with and it would have come to the sheriff's knowledge if they were tampered with;
97 5. insisted that Chan spoke to the defendants' director Elsie Lim sometime in May 1994 and Chan acceded to her request to keep one fire staircase closed in view of theft of the defendants' equipment earlier but a few days later the plaintiffs' solicitors wrote to say the staircase must be opened, which direction the defendants complied with;
98 6. Chan had also represented to him that the lifts would be physically completed and in operation by end March 1994, contrary to what had been minuted at a site meeting.
99 The delay in the installation of the lifts was a serious breach of the lease as the defendants needed them -- what the defendants told the plaintiffs' architects was that even if the lifts were ready the plaintiffs cannot charge rent for the fourth and fifth levels unless the additional electricity power was also supplied, hence it served no purpose for the plaintiffs to rush to complete the lifts without the electricity to operate them;
100 7. said the defendants had planned to renovate the fourth and fifth levels but shelved the plans because of the fear of structural problems due the cracks;
101 8. denied that the defendants did not apply for carpark lots and that the defendants' customers had alternative access via a door by escalator to the second level.
102 A director Thia Tiong Siong (Thia) from the defendants' contractor Yong Heng Furniture (Yong Heng) also affirmed an affidavit where he deposed as follows:
103 1. he denied he had been instructed by Liu to deliberately damage the beams or ceilings or any part of the premises;
104 2. he had constructed a temporary wooden swing door for the defendants some time in December 1990 which was later removed and a new gypsum board partition erected in February 1994.
105 Chan filed a third affidavit for the appeal and the same was admitted with the consent of the defendants' counsel, Chan deposed that:
106 a. Liu and Elsie Lim with the plaintiffs' representative Jimmy Goh held a joint inspection of the premises with a BCD officer on 11 April 1994 where the defendants' said representatives alleged that the premises were not fit for occupation but the BCD officer merely requested the plaintiffs to engage a professional engineer to investigate and report to the BCD, it was not true that the officer pointed out cracks on the first level to the defendants; the defendants' complaints were before 11 April 1994 as, by their letter dated 12 April 1994 they informed the plaintiffs that they had 'instructed professional structural engineers to look into the matter (cracks on the fourth level ceiling); to date however no report from their engineers had been furnished by the defendants;
107 b. the six (6) months monitoring period stipulated by the BCD had expired without incident;
108 c. he made no representations to the defendants as to when the lifts would be operational but they were installed by the time the defendants abandoned the premises; there was sufficient electricity power to operate the lifts and in any event under cl 3(e)(b)(ii) of the lease it was the defendants' responsibility to pay for additional power required over and above 1,000 KVA; d. the plaintiffs' records showed that between November 1993 - May 1994 the defendants' employees and officers were issued with 7 seasonal carpark cards, the defendants never applied for 20 seasonal carpark lots for their guests;
109 e. the chairman of Apollo Nite-club, a tenant of the plaintiffs, informed him that Yong Heng who was also then doing renovations for Apollo, had been asked by the defendants to damage the beams and ceiling of the premises.
110 The arguments
111 The plaintiffs' submissions
112 The plaintiffs' appeal was confined to the O 14 aspect. By the time the appeal came up for hearing, each party had amended its pleading and the defendants by their re-amended defence and counter claim, admitted (in para 7 thereof) owing the plaintiffs a total of$999,575.22 which comprised of arrears of rent (inclusive of interest), pest control andrefuse charges, as at 30 May 1994 and $927 for debris clearing. Counsel for the plaintiffs submitted that the assistant registrar's decision in granting the defendants unconditional leave to defend the action cannot be sustained for the following reasons:-
113 1. it is not disputed that from the commencement of the lease, the defendants did not/could not pay the rent and other charges, this is evidenced by the defendants' own letter to the plaintiffs dated 7 March 1994 (exh TBH-1 p 73 of Chan's first affidavit); on 10 March 1994 the defendants asked for further time to pay the outstanding rent (p 77 of TBH-1), no allegations were raised about cracks in the premises;
114 2. the defendants terminated the lease on 18 March 1994 a day after receiving a letter of demand for the arrears of rent from the plaintiffs' solicitors;
115 3. it was only in their letter 12 April 1994 that the defendants for the first time raised the matter of the cracks (on the fourth level); the focus of that letter was not the cracks but to propose instalment payments for the arrears of rent. The allegation of the cracks was a tactic to pressurise the plaintiffs to come to some agreement on the rent arrears as, at that time rent for the fourth level had not accrued as the lifts had yet to be installed;
116 4. on 20 April 1994 (p 113 of TBH-1) the defendants alleged for the first time the presence of 'serious cracks' on level one of the premises and used that as an excuse for stopping their discotheque operations. Although the defendants took possession of the first and second levels of the premises on 2 November 1993 and presumably then commenced their renovations (which required BCD approval) under professional guidance, they never mentioned the presence of such serious cracks in the ceiling for a period of five (5) months;
117 5. to date the defendants had produced no evidence to support their allegation whereas LBS had on 18 April 1994 (pp 88-110 of TBH-1) confirmed that the premises are safe -- the cracks on the first and fourth levels are of no structural significance; hence the letter from BCD dated 11 June 1994 (see p 111 of TBH-1) accepting LSB's report;
118 6. if the defendants' stand that they terminated the lease is accepted, they did so before receipt of the report from LSB;
119 7. in their letter dated 29 April 1994 (p 86 of TBH-1) to the plaintiffs the defendants offered to shift out if the latter could find a new tenant citing as reasons for their 'poor sales' that a) the second level had no direct entrance and b) the third level's entrance was via the hotel lobby; the condition mentioned was the state of the premises even before the defendants signed the lease and the defendants should have done their investigations then on access to the first three levels;
120 8. on 18 May 1994, two days after the defendants had terminated the lease, three articles appeared in the LianHe Wanbao (pp 73-82 of TBH-2) in the first of which the following reasons were given for the defendants' ceasing business;
121 a. Liu was wrong in his thinking that a three-in-one business of nightclub, discotheque and lounge would be very good;
122 b. no breakthrough in staff training and a high staff turnover;
123 c. keen competition coupled with rent of $230,000 per month; the volume of business was only $500,000 per month against a projected $1.5m; the defendants therefore ceased business not because of the cracks in the premises or the lack of carparking lots;
124 9. in the second and third articles in the said newspaper, the defendants (through Liu) maligned the plaintiffs by their allegation that the premises were haunted; Liu had not denied the comments he made to the press;
125 10. in their letter of 20 May 1994 (p 120 of TBH-1) to the plaintiffs' solicitors, the defendants' solicitors reminded the plaintiffs they have a duty to mitigate by looking for new tenants which impliedly admitted that the defendants had breached the lease, otherwise why would there be a duty to mitigate?
126 11. the defendants cannot terminate the lease prematurely, at the same time the plaintiffs cannot stop them from returning the keys if the defendants insist on doing so, but the plaintiffs do not consent to or accept the abandonment (see pp 224 and 226 of W D Duncan's Commercial Leases 2 ed); for surrender to operate there must be consent which the plaintiffs did not;
127 12. the chronology of events shows that the defendants have not raised a fair and reasonable probability of a credible defence as the alleged
128 (i) breach of the covenant of quiet enjoyment;
129 (ii) cracks in the ceilings and beams;
130 (iii) lack of carpark lots, and
131 (iv) failure to install the lifts are totally inconsistent with the defendants' stand/conduct and the contemporaneous documents at the material time;
132 13. therefore the defendants have not raised any triable issues (National Westminster Bank plc v Daniel & Others < 1994 > 1 AER 156 following Banque De Paris Et Des Pays-Bas (Suisse) SA v Costa De Naray < 1984 > 1 LLR 21);
133 14. the defendants have admitted that rent is due and owing, if so and the breach which they now alleged occurred within the same period, how can their defence and counterclaim stand? It is a mere sham and clearly unsustainable (Hua Khian Ceramics Tiles Supplies Pte Ltd v Torie Construction Pte Ltd < 1992 > 1 SLR 884). At best the defendants are entitled to a set-off (which the plaintiffs deny); the defendants' contention that the plaintiffs are only entitled to rent for the period January-May 1994 is baseless;
134 15. there is no implied warranty on the part of the plaintiffs that the premises are fit for any purpose (Halsbury's Laws of England 4 ed. vol. 27 p 210 para 270), representations are expressly excluded by cl 8(k) of the lease. It is not disputed that the defendants inspected the premises before the lease was signed and they could ascertain the suitability of the premises for their use bearing in mind that the previous tenant Isetan was a retail operator and change of use was involved;
135 16. the plaintiffs are entitled to all loss and damages consequential on the defendants' repudiation and they have two options:-
136 (i) do nothing and insist that the defendants continue to pay rent and sue for the unpaid rent, or
137 (ii) elect to terminate the lease with notice to the defendants of intention to claim for loss of benefit of lease. The latter option was chosen by the plaintiffs and they are entitled to claim a liquidated sum up to 30 June 1994 (date of writ) that being one month after acceptance of the defendants' repudiation; the plaintiffs' claim thereafter is for damages for premature termination of the lease;
138 17. the plaintiffs have encountered numerous difficulties in finding new tenants, not from lack of effort;
139 18. if the court is minded to allow the defendants' counterclaim to proceed, there should be judgment for the plaintiffs but no stay of execution because:-
140 (i) the counterclaim is fraught with numerous inconsistencies;
141 (ii) the plaintiffs are a well established public company and owner of the Hotel, there is no question of their being unable to pay should the defendants succeed in the counterclaim;
142 (iii) little is known of the defendants or their assets, their director Liu is a Taiwanese.The defendants' submissions Counsel for the defendants contended that the decision of the court below should beaffirmed for the following main reasons:-
143 1. the main thrust of the plaintiffs' arguments is that the defendants terminated the lease because of bad business, but at this stage of the O 14 proceedings, how can the court assume that is the reason?
144 2. even if bad business is the main reason, there are many other reasons why the defendants terminated the lease and if so should the defendants be penalised for it and are they precluded from relying on the other reasons? These are mixed questions of law and fact;
145 3. the triable issues of law and fact are as follows:-
146 (i) whether the defendants are discharged because of the plaintiffs' breach of a condition or nnominate/intermediate term of the lease -- the defendants had been deprived of substantially the whole benefit of the lease because a. the passenger lifts, additional electric power and carparks were not provided;
147 b. the numerous cracks in the premises made the same structurally unsound and there was a weight restriction on the fifth level;
148 (ii) whether the plaintiffs are entitled to the declaration they sought when they themselves had breached the lease --the defendants; contend they are not as they had come to court without clean hands, a declaration being an equitable remedy;
149 (iii) whether the plaintiffs can claim for loss of rental when the lease had terminated;
150 (iv) whether the plaintiffs are under a duty to mitigate their losses;
151 4. the defendants are only required to raise allegations at this stage that there were cracks, whether the cracks render the premises untenantable is a question of evidence not to be determined at present; there is even a dispute as to when the BCD was notified of the cracks. The same argument would apply to the lifts and so long as the defendants can show that the lifts were not provided for 7 months, which they contend is an unreasonable delay, that suffices for the purpose of showing a defence and whether weak or strong, it should not be struck out at this stage;
152 5. the defendants do not dispute the arrears of rent for the period 16 January - 31 May 1994 but only liability for the period commencing from 1 June 1994; the acceptance of the keys precluded the plaintiffs from claiming future rent or damages. In any case the lease having been forcibly terminated on 27 May 1994 due to the distress action, all contractual obligations thereunder ceased including payment of rent, if at all, the plaintiffs are only entitled to damages for its early termination; therefore the plaintiffs' claim for $95,283.59 is misconceived. The proper measure of damages would be the difference between the contractual rent and the rent at the time of the breach or the new rent. The defendants concede that the plaintiffs can deduct the undisputed arrears of rent ($999,575.22) from the initial deposit;
153 6. the defendants had invested $5m in the premises which were irrecoverable when they left. While the law provides no compensation for any improvements made to the premises, the plaintiffs would have derived the benefit from, while the defendants would have wasted, the improvements. The plaintiffs had also benefitted from the surrender of the premises as they were able to lease them out again -- there is no guarantee that the defendants would have been able to pay the rent for the remaining term under the lease;
154 7. the plaintiffs had not advertised at all and it is a triable issue whether they had made concerted and reasonable efforts to look for a new tenant;
155 8. the defendants should not be held liable for the cost of repair to the cargo lift as they did not damage it; any of the plaintiffs' numerous workers could have damaged the lift or it could have been damaged due to frequent usage.
156 The decision notwithstanding the voluminous affidavits filed by both parties, I was of the view that the plaintiffs' appeal should be allowed as the defendants' allegations did not raise any triable issues upon a careful review. Counsel for the plaintiffs had referred to the case National Westminster Bank plc v Daniel the headnotes of which read as follows:
157 On an application by the plaintiff for summary judgment under RSC O 14 a defendant seeking unconditional leave to defend must satisfy the court that there is a fair or reasonable probability of his having a credible defence and not merely that there is a faint possibility that he has a defence. If it is not credible, then there is no fair probability of him setting up a defence. If the affidavits in support of the application for leave to defend give conflicting evidence the court may conclude that, because they cannot both be correct and the inconsistency is such as to cast doubt on whether either is correct, there can be no fair or reasonable probability of the defendant having a real or bona fide defence.
158 The mere assertion by the defendants in their affidavits that there were cracks whichcaused them to move out from the premises, does not provide a basis for leave to defend,as their counsel contended. The court has to look at the whole situation to see whether the defendants have satisfied the court that there was a fair or reasonable probability of the defendants' having a real or bona fide defence; the mere assertion in an affidavit of a given situation does not, ipso facto, provide leave to defend (Banque De Paris Et Des Pays-Bas(Suisse) SA v Costa De Naray). Further as was held in Hua Khian Ceramics Tiles Supplies Pte Ltd v Torie Construction Pte Ltd where the court perceived a distinct opposition in the defendants to distort facts to obtain leave to defend, it provided a sufficient reason to proceed with great circumspection.
159 At the outset counsel for the defendants had conceded that there was no valid surrender of the premises and further that the plaintiffs are entitled to the cost of reinstatingas well as cleaning up the premises. I shall now deal with each of the defendants' allegationsin turn:-
160 1. The cracks A review of the chronology of the relevant events showed that this allegation was obviously fabricated by the plaintiffs as a desperate measure to get out of the lease. The complaint was first raised by the defendants on 12 April 1994 after their request in their letter dated 10 March 1994 for an extension of time to pay the outstanding rent was rejected by the plaintiffs' solicitors. In their earlier letter to the plaintiffs dated 7 March 1994 the defendants admitted their inability to settle the outstanding rent. The defendants had possession of the premises since November 1993 and it is inconceivable that they or their engineers East West would not have noticed the cracks at the time if they existed and were a cause for alarm on the structural integrity of the Hotel. While the plaintiffs' structural engineers LSB substantiated their contention that the premises were structurally sound with a report which was accepted by the BCD, not an iota of evidence let alone a professional report was produced by the defendants to support their contention otherwise. Further it is to be noted that the defendants stopped their pub operations in March while their discotheque was not popular (see their letter to the plaintiffs dated 7 March 1994) even before LSB issued their report.
161 2. Breach of the covenant of quiet enjoyment This contention had even less merit than the defendants' first allegation as the contention that noise emanating from the first floor escalator penetrated the second level was not pursued by the defendants either in their affidavits or in their arguments. As for the noise resulting from the installation of the lifts and other works carried out by the plaintiffs, I find the defendants' attitude ambivalent to say the least -- on the one hand they complain that the plaintiffs did not install the lifts expeditiously, on the other hand they complain of the noise attendant on such construction works. Again the allegation is without merit as the defendants' business activities are nocturnal in nature -- the plaintiffs' workers would have ceased work by the time the defendants commenced their operations.
162 3. Delay in the installation of the lifts The argument of counsel for the defendants that the plaintiffs were tardy in installing the passenger lifts must be seen in the factual matrix at the material time. Viewed in that light, I cannot see what adverse effect that delay, if indeed there was, had on the defendants (as they never spelt it out), when their liability to pay rent for the fourth and fifth levels would not and did not accrue until after the lifts were operational. Whatever Liu may have said in his affidavits regarding the defendants' proposals for the two levels, the fact remained that nothing had been done or shown to have been done to the fourth or fifth levels, by way of renovations, to support the defendants' professed intentions to use them for a nightclub and members' club respectively. Neither have the defendants shown how the weight restriction on the fifth level has adversely affected their business. The defendants' complaint is frivolous; I cannot, with respect, accept the argument of their counsel that the fact of rent not having accrued for the two floors is irrelevant bearing in mind that the parties' rights and liabilities are governed by the lease, in this case by cl 3(a)(ii) and also by cl 8(k) where the defendants expressly agreed that no promise, representation, warranty or undertaking has been given by the plaintiffs in respect of the suitability of the premises or the Hotel for any business to be carried on or to the fittings, finishes, facilities and amenities.
163 4. Restricted and or no access to the second level The defendants' allegation cannot be true as in Liu's affidavit he admitted that there was access by escalator, albeit unsatisfactory, according to Liu, because it was via a fire staircase; the defendants boxed up both escalators for levels one and two for their own reasons. They are again faced with cl 8(k) of the lease coupled with the fact that they had inspected the premises before the lease was even negotiated (in June 1993); their complaint is unfounded.
164 5. Other allegations I am satisfied that the plaintiffs have refuted the allegation concerning the non provision of 20 reserved carpark lots by exhibiting the relevant correspondence in Chan's third affidavit. As for the damage to the cargo lift, Chan had pointed out in his second affidavit that the defendants never denied liability until Liu's affidavits notwithstanding that the plaintiffs had notified them on 6 December 1993 of the damage, followed by an invoice for the repair cost in February 1994; those two facts speak volumes about the defendants' denial of liability.
165 6. Claim for loss of rental after termination of the lease Contrary to the submission of counsel for the defendants this is not a triable issue but strictly an issue of law which determination a court can make in an O 14 hearing if the point is clear and is really unarguable. Where the court is satisfied that there are no issues of fact between the parties, it would be pointless to give leave to defend on the basis that there is a triable issue of law even if the issue of law is complex and highly arguable (see The White Book 1995 vol 1 p 158 para 14/3-4/11). On the substantive law, counsel for the defendants had cited Aspinall v Aspinall < 1961 > 2 AER 751 for his proposition that the plaintiffs are not entitled to rent after 27 May 1994. With respect that case is not relevant, it concerned rents due under two sub-leases which were payable quarterly in advance and rent payable in arrears under a third sub-lease, of leasehold premises to which a testator was entitled to and which he had divided into four parts. The testator died on the morning of a quarter day December 25 1954 and the court had to decide when the rents accrued on the sub-leases for purposes of determining whether the rents were capital or income in the administration of the testator's estate. The correct position is set out in McGregor on Damages 15 ed at p 605 para 961which states The normal measure of damages is the value of the term, which will be calculated as the rental value of the premises less the contractual rent reserved by the lease. There are no direct authorities. The general rule for contract damages is to put the plaintiff in the same position asif the contract had been performed; put briefly he is entitled to his bargain (McGregor at p556 para 873). I see no reason to depart from this general rule for the plaintiffs' claim. The plaintiffs as their counsel submitted, had one of two options -- to resort to specific performance and hold the defendants to the full term of the lease, or, as they chose to do so,to treat the defendants' premature termination of the lease as discharging the contract andclaim for damages. I awarded the plaintiffs final judgment for rent, service charge, pestcontrol and refuse charges for the month of June 1994 as it was unreasonable of the defendants to expect the plaintiffs to secure a new tenant immediately after they returned thekeys on 30 May 1994, bearing in mind that the defendants had neither cleared the debrisfrom, nor reinstated the premises. The premises extended to five levels covering 64,229 sq.ft. and it would not have been easy to find tenants for such a large space so quickly. Indeed counsel for the defendants had conceded that it is not unreasonable for the premises to bevacant for June 1994 but he did not accept the plaintiffs' entitlement to contractual rent for that period. Chan in his first affidavit (pp 142-158 of THB-1) had produced documents which showed that the plaintiffs commenced negotiations with prospective tenants as earlyas 25 April 1994 and these negotiations continued until July 1994 without a tenant being secured. Indeed if it all there was a delay in finding new tenants for the premises, the defendants are partly to be blamed for Liu's comments to the Chinese press that the premisesare haunted. I awarded interlocutory judgment to the plaintiffs in respect of the defendants'premature termination of the lease with damages to be assessed by the registrar after the plaintiffs had tenanted out all five levels in the premises. This order was a logical corollary to my first order as the plaintiffs had yet to secure any tenant despite the efforts they had made. I dismissed the defendants' counterclaim for $148,096.88 representing the balance ofthe security deposit after deducting the undisputed arrears of rent, service and other chargesdue to the plaintiffs, as it was premature -- the plaintiffs' claim for damages had yet to beassessed and it may well be that after assessment the balance of $148,096.88 may not beenough to pay the damages awarded to the plaintiffs. The purpose of the security deposit asset out in cl 5 of the lease was to secure the due observance and performance by the defendants of the covenants and conditions contained therein, the defendants having breached the lease, they are not entitled to be refunded the deposit, without more. I had not, in coming to the conclusion that the defendants had not raised any triableissues, embarked on a minute and protracted examination of the documents and facts of thecase; it seemed clear however that the defence and counterclaim was not sustainable and, it would be a grave injustice to the plaintiffs to have their claim delayed by allowing the sham defence and counterclaim to proceed to trial. Lai Siu Chiu
166 Judge 30 June 1995 Schedule of affidavits filed
167 1. Affidavit of Chan Man Ho @ Tan Boen Ho filed on 2.8.94.
168 2. Affidavit of Liu Win Yin filed on 24.8.94.
169 3. Affidavit of Chan Man Ho @ Tan Boen Ho filed on 30.9.94.
170 4. Affidavit of Thia Tiong Siong filed on 11.10.94.
171 5. Affidavit of Liu Win Yin filed on 11.10.94.
172 6. Affidavit of Chan Man Ho @ Tan Boen Ho filed on 18.11.94.
173 List of Authorities referred to
174 1. National Westminster Bank plc v Daniel & Others < 1994 > 1 AER 156.
175 2. Banque De Paris Et Des Pays-Bas (Suisse) SA v Costa De Naray < 1984 > 1 LLR 21.
176 3. Hua Khian Ceramics Tiles Supplies Pte Ltd v Torie Construction Pte Ltd < 1992 > 1 SLR 884.
177 4. Aspinall v Aspinall < 1961 > 2 AER.
178 5. McGregor on Damages 15 ed.
179 6. Halsbury's Laws of England 4 ed vol 27.
180 7. The White Book 1995 vol 1.
Lai Siu Chiu J
Rebecca Chew (Rajah & Tann) for the plaintiffs
Hee Theng Fong & Doris Lee (Hee Theng Fong & Co) for the defendants