In the Court of Appeal of the Republic of Singapore
[1996] SGCA 33
CA 33/1996
Between
Offshore Pipelines International Ltd
McDermott International Inc
J Ray McDermott SA
… Plaintiff
And
Hyundai Heavy Industries Co Ltd
… Defendant
grounds of decision

This judgment is subject to final editorial corrections approved by the court and/or redaction pursuant to the publisher’s duty in compliance with the law, for publication in LawNet and/or the Singapore Law Reports.
Offshore Pipelines International Ltd and Others v Hyundai Heavy Industries Co Ltd
[1996] SGCA 33
CA 33/1996
Karthigesu JA; L P Thean JA
15 May 1996
1 Judgment:
2 < Delivered by L P Thean JA >
3 GROUNDS OF JUDGMENT
4 This was an appeal from the decision of Selvam J given on 26 February 1996 in which he refused to discharge an ex parte injunction against the appellants. At the conclusion of the hearing, we dismissed the appeal and now give our reasons.
5 The facts
The first appellant, Offshore Pipelines International Ltd ( OPIL ) is a Cayman Islands company and until 31 January 1995 was wholly owned by Offshore Pipelines Inc ( OPI ), a Delaware company. Up to that date, OPI was the head or parent company of the OPI group of companies ( OPI Group ) which provided a full range of offshore marine construction and related services to the oil and gas industry and its area of operation covered the Gulf of Mexico and also Middle East, India, South East Asia and the Far East. The respondent, Hyundai Heavy Industries Co Ltd ( HHI ) is a Korean company and is the head or parent company of the HHI group of companies ( HHI Group ). The HHI Group provides, inter alia, marine construction services specialising in marine fabrication in the Middle East, India, South East Asia and the Far East. It is also engaged in marine construction requiring fabrication and installation of offshore drilling and production platforms, marine pipeline systems and other marine facilities, structures and equipment.
6 On 9 September 1992, OPIL and HHI entered into a joint venture agreement ( JV Agreement ) whereby they agreed to the formation of a joint venture company known as Offshore Hyundai International Ltd ( OHIL ) in which both of them were to have equal shares. Pursuant to the agreement OHIL was incorporated in the Cayman Islands and has been operating from Singapore. It is registered in Singapore as a foreign company.
7 The second appellant, McDermott International Inc ( McDermott ) is the parent company of the McDermott group of companies, and the McDermott group provides, inter alia, offshore marine construction and other related services to the oil and gas industry. The third appellant, J Ray McDermott SA ( JRM ) was, prior to 31 January 1995, wholly owned by McDermott. JRM has controlling interests in two joint venture companies, namely: McDermott-ETPM East Inc ( MEEI ) and McDermott-ETPPM Far East Inc ( MEFE ). In each of these companies JRM owns 80% of the shares and the remaining 20% is owned by ETPM International SA ( ETPM ). Both companies are involved in marine construction activities. MEEI has its operational headquarters in Dubai and has projects in the Middle East and India, and MEFE has its operational headquarters in Singapore and has projects in Asia, South East Asia and Australia. Hence, the McDermott group of companies were competitors of HHI and OPI and their affiliates.
8 On 31 January 1995, JRM acquired OPI under an agreement and plan of merger and OPI merged into a wholly owned subsidiary company of JRM called MCB I (now named J Ray McDermott Holdings Inc), and the shareholders of OPI exchanged their shares in OPI for shares in JRM, with the result that McDermott became a majority shareholder, and the OPI shareholders, minority shareholders, of JRM. In consequence of the merger, OPI ceased to operate as a corporate entity and OPIL became a wholly owned subsidiary of JRM. Effectively, JRM took over the role and activities of OPI including the control of the OPI group of companies. Not unnaturally after the merger, HHI was very concerned that the OPI group, which had been taken over by the McDermott group, would thenceforth be competing with OHIL. This concern was specifically raised by C S Ahn, the executive Vice- President of the offshore and engineering division of HHI, at the board meeting of OHIL held on 4 May 1995. At that meeting, J J Wildasin, the President and chief operating officer of JRM, indicated that JRM was very much interested in maintaining the relationship and strengthening the association with HHI under the JV Agreement. He acknowledged that he was aware that some provisions of the JV Agreement were in conflict with those of other joint venture agreements which McDermott had entered into before the merger, and stated that it was McDermott s intent to work out the differences with the affected parties and resolve the conflicts where necessary. Following the meeting, J J Wildasin on 26 July 1995 despatched a fax to C S Ahn which, among other things, informed the latter of the shareholding structure and operations of MEEI and MEFE and requested HHI to agree to certain amendments to section 6.2(d)(A) and (B) of the JV Agreement. C S Ahn by a fax dated 17 August 1995 replied disagreeing to the proposed amendments and stating that MEEI and MEFE must abide by the rules of bidding provided in section 6.2(d)(A) of the JV Agreement and alleging that the OPI Group had submitted bids for the Ravva and Tapti projects within the territorial waters of India without HHI s consent and was therefore in clear violation of section 6.2(d)(A) of the agreement. On 26 October 1995, Mike H Lam, the President of marine construction services and a director of JRM, informed C S Ahn of HHI that JRM was not bound by the territorial division. In his affidavit affirmed on 16 January 1996, Mike Lam said, inter alia:
9 On or about October 26, 1995, I and Ed Walker representing OPIL held a meeting in Houston, Texas with Dr. Ahn and Mr Lee of Hyundai Heavy Industries Co. Ltd ( HHI ). At this meeting we again discussed with the HHI representatives the territorial rights set forth in the HHI joint venture agreement with Offshore Pipelines International Ltd. ( OPIL ) and various other unresolved disputes between OPIL and HHI. Mr Walker and I again informed HHI that OPIL s position was that the territorial divisions in the HHI-OPIL joint venture were not binding on JRM or its non-OPIL interests. We informed HHI that JRM and its predecessors had been active in India for years and would remain active in India. The HHI representatives reiterated their position that JRM interests are subject to the territorial restrictions of the OPIL-HHI Joint Venture Agreement.
10 HHI alleged that OPIL was in breach of section 6.2(d) of the JV Agreement in that MEEI, an affiliate of OPIL, had submitted bids for marine installation projects in the territorial waters of India without the approval of HHI. On 11 January 1996, HHI commenced an action against OPIL, McDermott and JRM in the High Court in Suit No. 55 of 1996 and obtained ex parte an interim injunction against them. The injunction was in the following terms:
11 The Defendants, and/or each of them, be restrained, whether by themselves, their servants, agents, Affiliates, subsidiaries or otherwise from howsoever committing and/or procuring and/or inducing the following acts:-
12 (a) making a bid requiring Installation Services (other than projects requiring solely Fabrication Services) within the Territorial Waters of India and/or China; and/or
13 (b) taking any steps whatsoever in relation to or in furtherance of any such Bids already made, which steps would include, but not be limited to, accepting the award of any tender in relation to such Bids.
14 Following that the appellants applied for the interim injunction to be discharged and the application was heard before Selvam J and was dismissed on 26 February 1996, subject to the variation that the injunction should not apply to a bid already made by McDermott, JRM or their subsidiaries in respect of the contract for the fabrication, loadout, transportation and installation of platforms and facilities for the Panna Field, Mid-Tapti Field Offshore India, which contract was the subject matter of a letter dated 15 January 1996 from Enron Oil & Gas Ltd to MEEI. Against Selvam J s decision the appellants appealed and the appeal was heard on an expedited basis.
15 The appeal
Before us, two main issues were raised: first, whether there was a serious issue to be tried, and, secondly, if there was, whether the balance of convenience was in favour of discharging or maintaining the injunction. In addition, the appellants raised two subsidiary issues of delay on the part of HHI in seeking relief and the rights of third parties being affected by the injunction.
16 It is convenient at this stage to set out some relevant provisions of the JV Agreement. Section 6.2(d) provides, inter alia, the following:
17 (d) In order to avoid the Joint Venture Company and the HHI Group and OPI Group from competing with one another to utilize the Vessels and the Outside Vessels that the Shareholders desire to make available to each other on a preferential basis in the Designated Territory, the shareholders have agreed that the following rules shall govern the submission of Bids and performance of Projects by the HHI Group and OPI Group within the Designated Territory:
18 Except as may be otherwise agreed to by the Executive Committee with respect to a particular Project, the following rules shall apply to all Projects (other than Projects requiring solely Fabrication Services) and each party shall ensure that the HHI Group or the OPI Group, as appropriate, observes, and does not submit any Bids in contravention of the following rules:-
19 (A) HHI shall decide which of the designated member of the HHI Group, OPI Group or the Joint Venture Company will bid Projects to be performed within the Territorial Waters of India and China. In pursuing the Project, HHI shall give preference in the order of, in utilizing vessels required for the Projects, vessels owned by or available on an exclusive basis to the HHI Group, the Joint Venture Company and OPI Group; and
20 (B) OPI shall decide which of the designated member of the OPI Group including OPMI and TL Offshore, the HHI Group or the Joint Venture Company will bid Projects to be performed within the Middle East and the Territorial Waters of Malaysia provided that for any Turnkey Project within the Middle East whose total value or specified lump-sum price is greater than USD $125.0 million, the HHI Group will be free to bid for such Turnkey Project. In pursuing Projects, OPI shall, in utilizing vessels required for the Projects, give preference to, in the order of, vessels owned by or available on an exclusive basis to the OPI Group, the Joint Venture Company and HHI Group.
21 In pursuing any Turnkey Projects within the Middle East, each Shareholder agrees that the HHI Group and OPI Group shall offer to the other the opportunity to perform any Fabrication Services that it elects to subcontract on a preferential basis, including the right to match on a comparable basis any offers made by Third Parties.
22 In pursuing any Project in any portion of the Designated Territory (or for the specific Projects in the Middle East identified above) where the HHI Group and OPI Group are free to submit Bids and otherwise compete for Turnkey Projects, the Executive Committee shall consult on bidding philosophies and approaches and the HHI Group and OPI Group shall be free to submit Bids and otherwise compete only if the Executive Committee fails to agree in a timely manner on the bidding approach for such project.
23 Section 1.2 defines an affiliate as follows:
24 Affiliate means, with respect to any Person, any other Person directly or indirectly, controlling, controlled by, or under common control with, such Person. For the purposes of this definition, control (including, with correlative meanings, the terms controlling , controlled by and under common control with ), as used with respect to any Person, shall mean the possession, directly or indirectly, of the power to direct or cause the direction of the management and policies of such Person, whether through the ownership of voting securities, by contract or otherwise.
25 It is necessary to refer briefly to the claims brought by HHI against the appellants. It claims against OPIL for damages for breach of the JV Agreement in that OPIL had failed to ensure that its affiliates, in particular JRM and MEEI, did not make a bid for the marine installation services within the territorial waters of India without the approval of HHI. As against McDermott and JRM, HHI claims damages for inducing and procuring OPIL to breach the JV Agreement in that McDermott as the parent company and/or JRM had caused OPIL to breach section 6.2(d)(A) of the JV Agreement by having or causing MEEI to bid for offshore marine construction projects within the territorial waters of India without the approval of HHI and indeed often in competition with HHI. Before us it was not argued that HHI has no cause of action against McDermott and/or JRM, although this argument had been raised and was pursued below and presumably was rejected. Mr Chong for the appellants argued mainly on the basis that if HHI had no serious claim against OPIL for damages for breach of the JV Agreement, there was no serious question to be tried, and should he succeed in that argument, it followed that there would be no question to be tried in respect of HHI s claims against McDermott and JRM.
26 Mr Chong argued that on the true construction of the JV Agreement HHI had no basis of any claim against any of the appellants and in particular OPIL, and founded his arguments on three separate and independent grounds. First, on the true construction of the JV Agreement, McDermott and JRM are not affiliates of OPIL as defined in the agreement. Secondly, the material part of section 6.2(d) relates to the utilization of the Vessels and Outside Vessels as defined in the agreement and not to the territorial division for the parties activities and operations. Lastly, on the true construction of section 6.2(f) of the agreement the territorial restrictions in section 6.2(d) had lapsed.
27 Construction of JV Agreement
The first argument of Mr Chong turns on the construction of the definition of an affiliate in section 1.2 of the JV Agreement. He submitted that the definition is qualified by the commencement part of that section: unless the context otherwise requires , and in the context of the agreement, in relation to the observance of the restrictions laid down in section 6.2(d), the term affiliate means and refers to a company which the party concerned, i e HHI or OPIL, can control and does not mean or refer to one which it cannot control. Where a party is not in control of an affiliate it cannot ensure that the affiliate would not submit a bid in contravention of that section. Whilst it is possible to contemplate that HHI and OPIL could have intended to enter into an obligation requiring them respectively to ensure that affiliates within their control would not submit bids in contravention of the rules, it could not have been their intention to agree to a term under which they would be in breach of the JV Agreement for failing to ensure that the affiliates which they could not control or which controlled them would not submit any such bids. Neither HHI nor OPIL would be in a position to direct the behaviour of affiliates it has no control. Further, the JV Agreement defines OPI Group as OPIL and its affiliates and not OPI and its affiliates. If the intention of the parties to the agreement was to bind OPI, then the agreement would have been made with and signed by OPI and not OPIL. Mr Chong pointed out that significantly the agreement specifically refers to the following affiliates of OPIL, namely: (i) OPI International Inc, (ii) OPI International Vessels Ltd and (iii) OPMI Ltd, but curiously there is no such specific reference to OPI as an affiliate. This omission, he said, was deliberate and was consistent with his contention that the definition of an affiliate refers only to an affiliate which OPIL can control and thus must necessarily exclude OPI.
28 In response, Mr Tan for HHI argued that the agreement must be looked at in its proper context. The JV Agreement was a marriage between the OPI Group headed by OPI and the HHI Group headed by HHI and a wide definition of an affiliate was drafted so as to facilitate co-operation between the two groups. Accordingly, the definition was deliberately drafted in that manner to include entities controlled by OPIL, entities controlling OPIL and entities under common control with OPIL. Thus OPI is an affiliate of OPIL as it controls OPIL and all other entities controlled by OPI are also affiliates of OPIL, as they are under common control with OPIL. The OPI Group refers to OPIL and whoever are OPIL s affiliates at the material time, and in relation to section 6.2(d)(A) it refers to whoever was an affiliate of OPIL at the time of the bid.
29 We agree with Mr Tan that the joint venture effected by the JV Agreement was essentially one between the OPI Group headed by OPI and the HHI Group headed by HHI. In entering into the agreement HHI itself decided to be a party, whereas OPI chose to make one of its subsidiaries, namely, OPIL, as a party only. Notwithstanding this, it must have been in the contemplation of both parties, namely, the heads of the two groups, that the agreement would bind them and their respective subsidiaries. Whatever might have been the reason for OPI not being made a party to the JV Agreement, it would not have made any commercial sense for HHI to enter into such an agreement with OPIL alone without ensuring that in some ways OPI and those subsidiaries of OPI over which OPIL had no control would be bound by the terms also. It seems to us that it was because OPI was not directly and expressly made a party to the agreement that the term affiliate was drafted in that very wide manner. As Mr Tan submitted, and we agree, the term affiliate was drafted to include entities controlled by OPIL, entities controlling OPIL and entities which are under the common control with OPIL. The term affiliate thus drafted include all those companies above and controlling OPIL including OPI; otherwise that part of the definition referring to an entity controlling or under the common control with the party concerned would be otiose in all circumstances; it has no application so far as HHI is concerned because it is the head of the HHI Group but it has application so far as OPIL is concerned, as OPIL was controlled by OPI and was under the common control with other companies within the OPI Group.
30 In our opinion, the prohibition in section 6.2(d) of the JV Agreement refers to OPIL s obligation to ensure that the .... OPI Group observes and does not submit any Bids in contravention of the ... Rules . The OPI Group is defined as OPIL and each of its affiliates, and such definition refers to OPIL and whoever are OPIL s affiliates at the time of the submission of the bids contemplated in section 6.2(d)(A). This interpretation gives effect to the purpose of ensuring cooperation between the two groups, i e the OPI Group and the HHI Group, as contemplated in the JV Agreement.
31 It is common ground that the effect of JRM s acquisition of OPI was that JRM in place of OPI controlled and still controls OPIL and the OPI Group. Just as OPI was an affiliate of OPIL, JRM has become and is an affiliate of OPIL, as it controls OPIL. JRM controls and operates MEEI and MEFE. MEEI and MEFE are therefore under common control with OPIL, i e all three of them being controlled by JRM, and accordingly MEEI and MEFE being under such common control are affiliates of OPIL.
32 We can see no reason why OPIL could not have intended to undertake that OPI and its subsidiaries would not make bids in contravention of section 6.2(d). The mere fact that OPIL was and is not really in a position to fulfil its undertaking, and would have to rely on its parent company to do so, is neither here nor there. There is nothing alien about an undertaking assumed by a party to bring about a result which the party may not be able to achieve or may have difficulty in achieving. It may be foolhardy for the party in such circumstances to assume such an obligation. At any rate, this is not the case here. At the material time, OPI was the head and was in full control of its group; it used OPIL as a vehicle to enter into the joint venture with HHI in full knowledge that its subsidiary, OPIL, would be in a position to observe, and to ensure that its affiliates would observe, the bidding rules provided in section 6.2(d). If the parties, namely, OPIL and HHI, had intended that the undertakings in the agreement applies only to companies in the respective groups in which the parties had control, then they would have used the word subsidiaries instead of affiliates and would not have couched the word affiliate in such broad terms. In our opinion, there is no reason why the word affiliate in section 6.2 should be read restrictively as contended on behalf of the appellants.
33 In fact, given the context in which the JV Agreement was made, the irresistible conclusion is that the word affiliates includes companies controlling and sister companies not controlled by, but under common control with, OPIL. In our judgment, the term affiliates include McDermott, JRM, MEEI and MEFE.
34 Mr Chong s second main argument was that the underlying purpose behind section 6.2(d) is to avoid OHIL, the HHI group and the OPI group competing with one another to utilise the Vessels and Outside Vessels, as defined in section 1.2 of the JV Agreement. A bid for a project in India or China by MEEI or the McDermott group is not, per se, a breach of the restriction in section 6.2(d)(A). For a bid to be in contravention of the restrictions in section 6.2(d)(A), the bid must necessarily involve the utilization of the Vessels and/or the Outside Vessels. There was no suggestion that the bids by MEEI or the McDermott Group would involve competition with HHI for the use of the Vessels and/or Outside Vessels. In essence, Mr Chong submitted that section 6.2(d) does not operate to carve out territories for the respective parties. Rather, it only serves to regulate the utilisation of Vessels and Outside Vessels. As the McDermott group uses its own fleet of vessels, there is no question of there being any competition in the use of Vessels and Outside Vessels. Hence, there has been no breach by OPIL.
35 In our view, such an interpretation is against the natural and ordinary reading of section 6.2. In order to get the full flavour of section 6.2, it is necessary to reproduce in extenso the other provisions of the agreement:
36 (a) The Shareholders have agreed to jointly pursue opportunities to provide Installation Services within the Designated Territory utilizing the Vessels. Except as may be determined by the Executive Committee on a case-by-case basis with respect to a particular Project, no Vessel shall be utilized outside the Designated Territory, and the Shareholders agree that neither they nor any member of the HHI Group or OPI Group, as the case may be, shall submit a Bid contemplating performance by a Vessel outside the Designated Territory without the prior approval of the Executive Committee.
37 (b) HHI and OPIL shall effectively communicate the Projects that they and other members of the HHI Group and OPI Group, as the case may be, intend to Bid within the Designated Area or contemplating the use of one or more of the Vessels. The Executive Committee shall establish procedures, after consultation with their legal counsel, to exchange information on a periodic basis regarding such Projects. The Executive Committee shall consult on a frequent basis regarding bidding philosophies and approaches being followed by the HHI Group and OPI Group in order to attempt to ensure maximum utilization of the Vessels. If the Executive Committee determines after appropriate consultation that members of the HHI Group and OPI Group intend to submit Bids contemplating the use of one or more of the Vessels in a manner that may prevent any Vessel from performing both Projects, a meeting of the Board of Directors shall be held to determine which of the competing Bids shall be given priority and the terms of the Subcontract for that specific Project. In reaching its decision, the Board of Directors shall give primary consideration to the projected profitability and long-term benefits for the Joint Venture Company of the Projects under consideration.
38 (c) The Board of Directors shall approve from time to time a fixed rate or schedule of rates and prices at which each Vessel shall be made available to members of the HHI Group and OPI Group pursuant to a Subcontract. The minimum rates, regardless of whether fixed or variable, established by the Board of Directors shall provide for recovery by the Joint Venture Company of (i) all fixed costs and expenses anticipated to be incurred by the Joint Venture Company in connection with the control, possession and use of the Vessels on a fully recovered basis (ii) the cost of all other specific services, support, equipment and supplies contemplated by a particular Subcontract, and (iii) a minimum 20% gross profit margin. Following the completion of the transactions contemplated by the Vessel Upgrade Contract, the Board of Directors shall review the minimum gross profit margin for the DB Sarita to ensure a premium deemed appropriate by the Board of Directors for heavy lifts involving 2,000 tons or more because of the unique heavy lift characteristics of the DB Sarita.
39 (d) ....... < set out above >
40 (e) The Shareholders agree and desire to restate for the sake of clarity that there shall, except as specified in this Section 6.3, be (i) no restrictions on either the HHI Group s or OPI Group s Bidding or competing for any Project I and (ii) no restrictions on either the HHI Group s or OPI Group s pursuit of contracts solely to provide Fabrication Services within the Designated Territory.
41 Section 6.2 covers an area much wider than the utilisation of Vessels and Outside Vessels. It speaks of sub-contracts on preferential basis and market potentials. No doubt, the utilisation of Vessels and Outside Vessels is an integral part of the agreement, for the parties require the use of these vessels to do installation work. However, it is not the sole consideration. The division of territory is on an equal footing. The issue sought to be addressed by this part of the JV Agreement is one of competition between the two groups. Competition may arise in two situations. The first is where both parties to the joint venture are interested in the same project in a designated territory. The second is where both parties wish to use the same vessels. Both considerations are equally important. The two stand side by side and are complementary. That is the essence of the synergy in the combination between the HHI Group and the OPI Group. Section 6.2(d) is therefore not limited to situations where there is a competition for the use of the Vessels or Outside Vessels.
42 The last argument advanced by Mr Chong was that the restriction in section 6.2(d) had lapsed. Mr Chong relied on section 6.2(f), which is as follows:
43 (f) Following the first three years of the Joint Venture Company operations, the Board of Directors shall review and reestablish the rules governing the matters covered in Section 6.2(d) with the view to ensure that the HHI Group and OPI Group are allocated areas within the Designated Territory that the Board of Directors believes have comparable market potential for such additional period of time as the Board of Directors deems appropriate.
44 In allocating such areas of comparable market potential to the OPI Group and HHI Group, if and only when the general market condition in the Designated Territory is such that the Middle East market has to be shared between the OPI Group and the HHI Group so as to ensure comparable market potential, OPIL shall ensure, on a best effort basis, that HHI be allocated the maximum market potential in the Middle East possible without breaching OPIL s non-competition obligations under the existing joint venture contract with OPMI.
45 It seems to us that the natural interpretation of section 6.2(f) is that it deals with re-establishment of the rules of bidding in the context of a review of the joint venture operations after a lapse of three years. This clause effectively means that after the first three years of operation, the Board of Directors shall review and re-establish the rules governing the matters covered by section 6.2(d) with a view to allocating areas between the HHI Group and the OPI Group, and it follows that unless and until the Board of Directors has re-established such rules, the rules presently contained in section 6.2(d) governing the allocation of areas between the HHI Group and the OPI Group will continue to apply. In our opinion, it does not have the effect of terminating the effect of the rules in section 6.2(d) on the lapse of the first three years of operation.
46 The balance of convenience
We now turn to the second main issue. Mr Tan submitted that by reason of the terms of the JV Agreement the consideration of balance of convenience should not apply. The JV Agreement was made between two major corporations of equal bargaining power and was entered into with the benefit of legal advice on both sides, and the agreement expressly provides for the grant of interlocutory injunction in the event of a breach or threatened breach of any terms of the agreement. He relied on sections 10.5(b)(viii) and 10.13. Section 10.5(b)(viii) provides:
47 Notwithstanding any other provision of this Agreement any Shareholder shall be entitled to seek preliminary injunctive relief from any court of competent jurisdiction pending the final decision or award of the arbitrators.
48 And Section 10.13 provides:
49 OPIL and HHI shall be entitled to injunctive relief under this Agreement if either Shareholder shall breach or threaten to breach any of the terms. Nothing in this Section 10.13 shall be construed to limit the obligation of the Shareholders to submit disputes to arbitration or to limit the finality of an arbitration award made pursuant to Section 10.5.
50 Relying on these provisions Mr Tan argued that the parties to the agreement had specifically addressed their minds to appropriate relief for a breach or threatened breach of the negative covenant in section 6.2(d) and agreed that there was an entitlement to an interim injunction. As there was a clear breach in the instant case the court should lean against refusing to grant the interim injunction to HHI and there was no necessity or requirement of the court to consider the question of the balance of convenience.
51 In our view, sections 10.5(b)(viii) and 10.13 do not have the effect as contended on behalf of HHI; they merely declare and preserve the parties right to apply for interlocutory injunctions, notwithstanding their obligations to submit disputes to arbitration. They further provide that such an application does not affect the parties obligations to submit their disputes to arbitration. Both these provisions are of no assistance in determining the issue whether or not the injunction should be discharged.
52 Mr Chong sought to demonstrate that the balance of convenience lay in discharging the injunction. Relying on the principles laid down in the well-known case of American Cyanamid Co v Ethicon Ltd < 1975 > AC 396, 408, he submitted that in considering the balance of convenience, the first step was for the court to consider whether HHI would be adequately compensated by an award of damages for the loss it would have sustained, if the injunction was discharged and it succeeded at the trial of the action. If damages recoverable would be an adequate remedy and the appellants would be in a financial position to pay them in this case there was no doubt that the appellants were in such a position no interlocutory injunction should be granted, however strong HHI s claim might appear. In the instant case, an award of damages would be an adequate remedy. As HHI s damage would only be losses in revenue and opportunity, he submitted that both these losses were quantifiable. If the injunction was discharged and HHI could establish that it had made a bid and would have succeeded in being awarded the project in question but for the competing bid by MEEI, the loss it suffered would be easily assessable by reference to the nett profit they would otherwise have earned. But, if HHI could not establish that it would have been awarded the project but for the competing bid by MEEI, then HHI would have suffered no loss. On the other hand, he submitted that if the injunction was not discharged and HHI did not succeed at the trial, the loss to McDermott and JRM would be incalculable and damages would not be an adequate remedy. He said that India and China were among the most significant markets in the world for McDermott s and JRM s businesses and the injunction would restrain them and their subsidiaries, and in particular MEEI and MEFE, from tendering bids for projects and the damage including the loss of goodwill and business prospect caused thereby would be irreparable. The balance of convenience was therefore in favour of the appellants and on that ground the injunction should be discharged.
53 It was not argued by Mr Tan that damages would be an adequate remedy to the McDermott group for the loss they would sustain if the injunction is not discharged and HHI does not succeed in establishing their right to a permanent injunction at the trial. That point was not seriously in dispute. We accepted Mr Chong s argument that if the injunction is not discharged and HHI fails in the claim at the trial, the loss sustained by the McDermott group would be very difficult to quantify. However, we did not accept his argument that an award of damages would be an adequate remedy to HHI if the injunction is discharged and it succeeds in the claim. In our view, Mr Chong had understated the difficulties faced by HHI. If the injunction is discharged and HHI succeeds at the trial, the loss it sustained would not be so easily assessable as Mr Chong contended. First, the tendering process for a project is normally confidential and the full results of the bids and their ranking are not known. They are not matters of public knowledge. No doubt, in some cases it might be possible to find out which of the parties have submitted the lowest and the second lowest bids. However, it does not follow that such would be the position in all cases. Assuming that such results are known generally, the question of proof may pose some difficulty. It would be extremely difficult for HHI to prove that it would have succeeded but for the bid made by MEEI. Secondly, a project may not necessarily be awarded to the lowest bidder, and the reasons of the party, who awarded the project, for preferring one bid over the others may also not be so evident and transparent. And there would also be the difficulty or problem on the part of HHI of proving causation, that is, that the loss of their bids or loss of a share of the market is due or attributable to the bids submitted by the McDermott group. There is one further factor in this balancing exercise. HHI Group has entered into a strategic alliance with the OPI Group and by this alliance they had secured a competitive advantage in India and China and damages alone would not be an adequate remedy for the loss of such advantage.
54 In Chuan Hong Petrol Station Pte Ltd v Shell Singapore (Pte) Ltd < 1992 > 2 SLR 729 and Singapore Press Holdings Ltd v Brown Noel Trading Pte Ltd & ors < 1994 > 3 SLR 151 this court held that in determining the grant or refusal of an interim injunction the fundamental principle is to take the course that appears to carry the lower risk of injustice, if the decision granting or refusing the interim injunction, as the case may be, should turn out to be wrong . In this case the lower risk of injustice clearly lay in the continuation of the injunction. OPIL and HHI had entered into a JV Agreement and the balance of convenience clearly lay in preserving the relationship between them in the joint venture. This relationship is best served at this stage by not discharging the injunction. A discharge of the injunction will reduce or remove the efficacy of the whole joint venture and the very basis for the existence would thereby be undermined. Lastly, on the material before us and on the basis of our construction of the JV Agreement it was evident to us that there was a clear breach by OPIL of section 6.2(d)(A) of the agreement. On this ground alone the injunction ought to continue: see Films Rover International Ltd and ors v Cannon Film Sales Ltd < 1987 > 1 WLR 670, 686, and Attorney- General v Baker and anor < 1990 > 3 All E R 257, 260 and 262.
55 There were two further grounds relied upon by the appellants for the discharge of the injunction. First, it was contended that there had been a considerable delay on the part of HHI in seeking the injunctive relief, and secondly, the interim injunction, if not discharged, would affect the interest or rights of third parties.
56 Delay
It was submitted by Mr Chong that there had been a clear delay by HHI in seeking relief. HHI was aware as early as March 1995 that the McDermott group was competing with it for projects in India. However, HHI applied for the injunction only on 11 January 1996. It had therefore permitted the McDermott group to make bids for projects, and altogether there were about six projects for which the McDermott group had bid.
57 We do not think that there had been a considerable delay on the part of HHI in taking proceedings against the appellants. True it is that on or about 27 March 1995, HHI received a fax from their customers, Command Petroleum (India) Pty Ltd, and that fax was addressed to all the parties who had submitted bids for certain projects, and in that fax it was clear that MEEI was one of the parties who had submitted a bid. Presumably by that time HHI was aware of the merger between JRM and OPI. However, it was by no means clear from the fax that MEEI was an affiliate of OPIL. It was also unclear when those bids were submitted.
58 At any rate, at the board meeting of OHIL held on 4 May 1995, J J Wildasin expressed in clear terms that the JRM group were very much interested in maintaining the relationship and strengthening the association with HHI. Subsequent to the meeting there was a fax from J J Wildasin dated 26 July 1995 informing HHI the structures of MEEI and MEFE and requesting for certain amendments to the JV Agreement. That appeared to be the first time HHI was apprized of MEEI and MEFE. HHI replied on 17 August 1995 disagreeing to the proposed amendments and pointing out that MEEI and MEFE were members of the OPI group and were prohibited from submitting bids for projects without HHI s consent and that these two companies had committed a clear violation of article 6.2(d)(A) of the agreement . It seems to us that at that time, HHI would have to make further investigation as to the breaches on the part of OPIL before they could commence any action. On 26 October 1995 Mike H Lam of JRM informed HHI in clear terms that JRM was not bound by the territorial restrictions contained in the JV Agreement. About two and a half months later, HHI commenced action against the appellants. In the light of these events we do not think that there was any delay on the part of HHI such that it was fatal to their claim for an interlocutory injunction.
59 Third party rights
We turn now to deal with Mr Chong s argument that third parties would be affected by the interlocutory injunction. In this respect, Mr Chong specifically referred to ETPM and the parties calling for the tenders.
60 In our view, the impact on third parties had been exaggerated. No doubt, had the injunction not been granted, the parties calling for the tenders might or would have been able to receive bids from the McDermott group. However, this is something that must necessarily follow from an injunction in this type of situation. In fact, that was the whole point of the JV Agreement.
61 If third party rights in this sense take precedence over all other considerations, then we do not see how trade restriction provisions can ever be enforced, regardless of how reasonable they may be. That would be too dogmatic a position to take. In the present case, we are not persuaded that the interests of these third parties would be materially affected by the injunction to such an extent that the injunction should be discharged.
62 As for ETPM, it is only a minority shareholder in MEEI and MEFE. As such, it must know that it would be affected by the decisions and actions of the majority shareholder, which is ultimately McDermott or JRM. MEEI and MEFE may be constrained by the restrictions in the agreement from making bids for projects in India and China; however, on the other side of the coin MEEI and MEFE now enjoy priority over HHI in the Middle East for certain projects, something which they never had. We therefore do not find this argument persuasive.
63 For the reasons we have given we dismissed the appeal.
- Sgd -
- Sgd -
KARTHIGESU
L P THEAN
< Judge of Appeal >
< Judge of Appeal >
64 15 May 1996
Singapore
65 < Solicitors: M/s Drew & Napier; M/s Shook Lin & Bok >
A B C D E F A B C D E F
Karthigesu JA
L P Thean JA
Steven Chong and Collin Seah for the appellants
Kenneth Tan and Kevin Kwek for the respondents