This judgment text has undergone conversion so that it is mobile and web-friendly. This may have created formatting or alignment issues. Please refer to the PDF copy for a print-friendly version.

In the Court of Appeal of the Republic of Singapore
[1996] SGCA 9
CA 69/1995
Between
China Resources Purchasing Co Ltd
… Appellant
And
Yue Xiu Enterprises (S) Pte Ltd
Another
… Respondent
grounds of decision
Contract — Remedies — Damages; Contract — Remedies — Damages

This judgment is subject to final editorial corrections approved by the court and/or redaction pursuant to the publisher’s duty in compliance with the law, for publication in LawNet and/or the Singapore Law Reports.
China Resources Purchasing Co Ltd v Yue Xiu Enterprises (S) Pte Ltd and Another
[1996] SGCA 9
CA 69/1995
Karthigesu JA; L P Thean JA; Yong Pung How CJ
07 March 1996
1 Cur Adv Vult
2 China Resources Purchasing Co Ltd (China Resources) commenced an action in the High Court against Yue Xiu Enterprises (S) Pte Ltd (Yue Xiu) on 17 August 1993 for certain liquidated sums or alternatively for damages and certain other reliefs for non-delivery of 10,000 metric tons, plus or minus 10%, of deformed steel round bars (the steel bars) under a contract in writing dated 20 February 1993. On 3 September 1993 Yue Xiu brought third party proceedings against Bulsing (Pte) Ltd (Bulsing) for an indemnity. On 1 December 1993 China Resources obtained an interlocutory judgment against Yue Xiu for damages in a sum to be assessed and costs. On 2 March 1994 Yue Xiu obtained an interlocutory judgment against Bulsing by way of judgment or declaration that Yue Xiu be entitled to recover from Bulsing such damages and costs for which Yue Xiu may be held liable to pay to China Resources or its customers. It was not disputed by either Yue Xiu or Bulsing that China Resources` purchase of the steel bars was for the purpose of immediate resale to Success Honour Development Ltd (Success Honour).
3 The learned assistant registrar assessed the damages at US$110,000 being the difference in the price for the steel bars payable by China Resources to Yue Xiu and the price at which China Resources had sold the steel bars to Success Honour. China Resources had also claimed for the banking charges and other expenses amounting to HK$10,654.69 but this claim was disallowed on the basis that China Resources would have had to incur these expenses in order to earn their profit of US$110,000. Moreover, there was no evidence to show that China Resources would have been entitled to reimbursement of these expenses had the contract been successfully performed.
4 In addition, China Resources also claimed an indemnity from Yue Xiu in the sum of US$153,000 which they alleged they were liable to pay Success Honour for their failure to deliver the steel bars to Success Honour. However, no action as yet had been commenced by Success Honour against China Resources and there was no evidence of the actual loss suffered by China Resources. Hence, this claim being only a potential liability of China Resources was not allowed but was reserved for assessment if and when China Resources had to meet such a claim from Success Honour. The authority relied on by the learned assistant registrar was Benjamin`s Sale of Goods (4th Ed) p 860 and Trans Trust SPRL v Danubian Trading Co Ltd [1952] 2 QB 297 at pp 303 and 307.
5 Accordingly, China Resources entered judgment against Yue Xiu on 23 January 1995 for US$110,000 together with US$9,492 being interest at the rate of 6% pa from 17 August 1993 to 23 January 1995 and costs of the action to be taxed. The judgment further provided that the issue of China Resources` claim for damages to Success Honour be reserved for assessment if and when China Resources meet Success Honour`s claim.
6 Yue Xiu and Bulsing being dissatisfied with the foregoing assessment of damages appealed to the judge-in-chambers. The learned judge allowed the appeals; set aside the judgment entered on 23 January 1995; affirmed the order of costs in favour of China Resources made on 23 January 1995; gave judgment for China Resources in the sum of US$21,000 with interest at 6% pa from 17 August 1993 to 8 May 1995 (the date of his judgment); ordered that Yue Xiu be indemnified by Bulsing in respect of the judgment in favour of China Resources; and further ordered that the costs of the appeal to the judge-in-chambers be taxed and paid by China Resources to Bulsing.
7 The learned judge arrived at the figure of US$21,000 in this way. He reasoned that since China Resources` contract with Yue Xiu and their contract with Success Honour was for the same specifications of the steel bars and in the same quantities for each specification totalling 10,000 metric tons, with a tolerance of 10%, Yue Xiu would have fulfilled their contract with China Resources and China Resources with Success Honour were 9,000 metric tons of steel bars delivered respectively. The difference in the unit rate of the two prices was US$11 per metric ton. Accordingly, China Resources was entitled to claim from Yue Xiu US$99,000 and not US$110,000. Further, Success Honour was also entitled to a commission of US$3 per metric ton from China Resources, that is to say, US$27,000 on 9,000 metric tons which should be set off against the US$99,000 reducing it to US$72,000. The learned judge then accepted the argument of Bulsing that since the price payable by China Resources to Yue Xiu was c & f whereas the price payable by Success Honour to China Resources was cif, there ought to be a deduction for the cost of insurance and he further accepted Bulsing`s contention that the insurance cost would be US$1 per metric ton. Hence, there was a further deduction of US$9,000 reducing the figure to US$63,000. Finally, the learned judge accepted the further argument of Bulsing that China Resources should have accepted an offer made by Yue Xiu to China Resources through Bulsing to supply 6,000 metric tons of steel bars, of 2,000 metric tons each of the specifications, 12 mm, 16 mm and 18 mm in diameter notwithstanding that the contracts were for 2,000 metric tons each of the specifications, 12 mm, 16 mm, 18 mm, 20 mm and 22 mm in diameter. Failure on the part of China Resources to accept this offer, so the learned judge held, was a failure to mitigate the damages. Had China Resources accepted this offer they would have reduced their loss by two-thirds. Accordingly, the learned judge arriv ed at US$21,000 by deducting two-thirds of US$63,000 from US$63,000. On the question of the reservation of China Resources` relief for the potential claim of Success Honour, the learned judge held that as no such claim had yet been made by Success Honour on 23 January 1995, China Resources had not proved that item of loss and disallowed reservation. Since the arguments he accepted were advanced by Bulsing and since he had rejected Yue Xiu`s arguments, he ordered the costs of the appeal to be paid to Bulsing and did not award Yue Xiu any costs. He did not interfere with the order for costs made by the learned assistant registrar.
8 China Resources now appeal against the decision of the learned judge but confine their appeal to four issues, namely:
(a) Whether China Resources ought to have mitigated their loss by two-thirds by accepting the offer of 6,000 metric tons of steel bars offered by Yue Xiu through Bulsing;
(b) Whether the cost of insurance deducted ought to have been the sum of US$9,000;
(c) Whether China Resources` claim to relief from Yue Xiu in respect of the potential claim of Success Honour against China Resources ought to have been reserved for further assessment if and when Success Honour pursued their claim against China Resources; and
(d) Whether China Resources ought to have been ordered to pay Bulsing`s costs in the appeal to the judge-in-chambers.
9 The first three issues are against Yue Xiu and the fourth is against Bulsing.
10 Before we deal with these issues we should outline the salient facts; but before we do that, we should dispose of Bulsing`s motion to this court to strike out China Resources` notice of appeal, in so far as it is related to the appeal against the order for costs made by the learned judge on the ground that China Resources` appeal against Bulsing being only on the question of costs, leave which was required under s 34(2)(b) of the Supreme Court of Judicature Act (Cap 322) had not been obtained, and secondly for leave to intervene in this appeal and file a case. We saw no merits in the first prayer of the motion and dismissed it but gave leave for Bulsing to intervene, China Resources not objecting, and dispensed with the case. The costs of the motion was reserved.
11 The salient facts we should set out are these.
12 In early February 1993, Yue Xiu by a faxed transmission offered to sell to China Resources a quantity of steel bars of the quality ST 25. As China Resources then had an interested buyer of steel bars of the quality ST 25, they duly informed Yue Xiu of their interest in steel bars of the quality ST 25. Relying on this communication from Yue Xiu, China Resources entered into an agreement with Success Honour, the interested buyer, on 17 February 1993 under which Success Honour agreed to purchase from China Resources 10,000 metric tons of ST 25 steel bars with a 10% tolerance, comprising 2,000 metric tons each of the specifications 12 mm, 16 mm, 18 mm, 20 mm and 22 mm in diameter at the cif price of US$306 per metric ton, delivery in one lot at Zhanjiang, China, latest by 31 March 1993 but later extended to 10 April 1993. However, on 18 February 1993 Yue Xiu inquired from China Resources whether they would accept the quality ST 18 instead of ST 25. China Resources replied after conferring with Success Honour that ST 18 quality was acceptable and accordingly the agreement entered into with Success Honour was duly amended to reflect this.
13 On 20 February 1993 China Resources concluded a contract with Yue Xiu for the purchase of 10,000 metric tons of ST 18 steel bars with a tolerance of 10% comprising 2,000 metric tons each of the specifications 12 mm, 16 mm, 18 mm, 20 mm and 22 mm in diameter at the c & f price of US$295 per metric ton, delivery at Zhanjiang, China, not later than 31 March 1993; partial shipment prohibited.
14 In the meanwhile, Yue Xiu entered into an agreement with Bulsing for the supply of 10,000 metric tons of ST 18 steel bars comprising 2,000 metric tons each of the specifications 12 mm, 16 mm, 18 mm, 20 mm and 22 mm in diameter and to have the same shipped to Zhanjiang, China, not later than 31 March 1993 to enable Yue Xiu to perform their contract with China Resources. However, it appears that Bulsing were unable to supply Yue Xiu with the ST 18 steel bars in the quantities of the specifications agreed by 31 March 1993 at Zhanjiang, China. This led to Yue Xiu proposing to China Resources on 10 April 1993 an alternative shipment of 10,000 metric tons of steel bars of the quality of ST 25 instead of ST 18 and in the alternate quantities of 2,500 metric tons each of the specifications of 12 mm, 14 mm, 16 mm and 18 mm and for the shipment to be effected between 1 and 10 May 1993. Yue Xiu also informed China Resources that they had suggested to Bulsing that Bulsing should give a 3% performance bond as an inducement to China Resources to accept the alternative shipment.
15 China Resources responded to Yue Xiu`s alternative offer on 19 April 1993 ` after a few days hard conversation with buyer` meaning with Success Honour. They said that they would be prepared to accept the alternative shipment provided they got the 3% performance bond and provided the specifications of deformed steel bars remained unchanged and further provided that they, China Resources, got a reduction in the price of between 0.5% and 1% as compensation for the delay.
16 There was no response to this from Yue Xiu and on 24 April 1993, China Resources sent a fax transmission to Yue Xiu requesting a response. Yue Xiu responded on 27 April 1993 by faxing to China Resources a telex message that they, Yue Xiu, had received from Bulsing which said that Bulsing would respond by the evening of 28 April 1993. However, Bulsing did not respond to Yue Xiu and Yue Xiu did not respond to China Resources. Accordingly on 30 April 1993, China Resources notified Yue Xiu by telex that their agreement with Yue Xiu entered on 20 February 1993 was terminated and that they would claim compensation. As already stated China Resources commenced proceedings against Yue Xiu on 17 August 1993.
17 With this statement of the salient facts we can now address the issues canvassed before us.
18 Firstly, the issue of mitigating the damages. It should be noted that the issue of China Resources mitigating their loss was not raised before the learned assistant registrar. It was raised for the first time before the learned judge and it was not raised by Yue Xiu but by Bulsing. Be that as it may the contention which the learned judge accepted was that had China Resources accepted the alternative offer made to China Resources by Bulsing through Yue Xiu, China Resources would have mitigated their loss. He said:
There was an offer by the third party (Bulsing) to supply 2,000 metric tons for each of the contractual descriptions of 12, 16 and 18mm diameter making a total of 6,000 metric tons. This offer was made to the defendant. But the defendant, when informing the plaintiff of this offer, suggested that the third party be required to furnish a performance bond for 3% of the contract value. The plaintiff however came back with an additional condition of price reduction. The offer by the third party should have been accepted. See Ebrahim Dawood Ltd v Heath (Est. 1927) Ltd (Dalal (London) Ltd, third party)[1961] 2 Lloyd`s Rep 512. If this had been accepted, the plaintiff could have reduced its loss by 6/9. By failing to accept the 6,000 metric tons of the contractual descriptions, the plaintiff had not mitigated its damages. Its damages should therefore be reduced by 6/9 of $63,000. This works out to US$21,000.
19 With respect, the learned judge was in error. In the first place as at 10 April 1993, the date by which China Resources were required to deliver the steel bars to Success Honour, Yue Xiu had not made a firm offer of the alternative steel bars to China Resources. In fact no firm offer was ever made. Secondly, the alternative steel bars were not of the contractual specifications; they were ST 25 steel bars whereas the contractual specification was ST 18 steel bars. Thirdly, they were only three of the five dimensions specified in the contract and in larger quantities then the contract provided for. Fourthly, when the offer of the alternative steel bars was made, Yue Xiu were already in breach of their agreement with China Resources. In these circumstances China Resources cannot be faulted for having counter proposed. The counter proposal, in any event, was not accepted by Yue Xiu. All this is clear from the salient facts we have set out.
20 It is clear therefore on the facts that Yue Xiu were not only in breach of their contract with China Resources but were also by the alternative offer offering steel bars of a different quality and in larger quantities in respect of three of the dimensions and a fourth not in the contract specifications and none for the other two dimensions; they were not supplying steel bars of the contractual specifications notwithstanding the change of quality from ST 18 to ST 25. In this situation there is no issue of mitigation and as we have already noted China Resources cannot be faulted for not accepting the alternative offer (even if it had been a firm one) and for counter-proposing. The authoritative textbook, Benjamin`s Sale of Goods (4th Ed) at para 17-024 p 852 says:
The rules of mitigation do not oblige the buyer to accept from the seller goods which do not conform with the contractual standard and which he is therefore entitled to reject. Thus, where the buyer properly rejects goods on the ground of their defective quality, he is not obliged to accept them when the seller offers them in mitigation of his breach of contract. However, the buyer`s damages may be calculated on the basis that he should have accepted a reasonable offer by the seller to mitigate his breach by supplying goods which are in fact up to the contractual standard, but are to be delivered on different terms so far as the timing and method of payment are concerned.
21 We respectfully agree that the above is a correct statement of the law.
22 It would be useful if we set out sub-ss (1) and (4) of s 30 of the Sale of Goods Act (Cap 393, 1994 Ed) which are pari materia with s 30(1) and (4) of the English Sale of Goods Act. They are as follows:
(1) Where the seller delivers to the buyer a quantity of goods less than he contracted to sell, the buyer may reject them, but if the buyer accepts the goods so delivered, he must pay for them at the contract rate.
...
(4) Where the seller delivers to the buyer the goods he contracted to sell mixed with goods of a different description not included in the contract, the buyer may accept the goods which are in accordance with the contract and reject the rest, or he may reject the whole.
23 The contract between China Resources and Yue Xiu was for 10,000 metric tons of ST 18 steel bars (with variation of 10% allowance). Yue Xiu`s alternative offer made through Bulsing was for 10,000 metric tons of ST 25 steel bars of which only 6,000 metric tons conformed to the diameter measurements prescribed by the contract. The alternative shipment offered by Bulsing was of mixed goods as under s 30(4). However, the learned judge treated it as an offer for less than the contracted amount, in which case China Resources would still have been entitled to reject it pursuant to s 30(1).
24 Furthermore, the learned judge`s reliance on Ebrahim Dawood Ltd v Heath (Est 1927) Ltd (Dalal (London) Ltd, third party) [1961] 2 Lloyd`s Rep 512, with respect, was misplaced. In this case the parties entered into a contract for the sale of 50 tons of galvanized steel which were to be 6, 7, 8, 9 and 10 feet long with equal tonnage per size. The sellers delivered an entire shipment consisting of 6 foot lengths only. The buyers claimed to be entitled to accept one-fifth of the total and reject the balance and additionally sought to recover four-fifths of the purchase price which they had paid. They relied on what is the equivalent of our s 30(4) of the Sale of Goods Act. Judgment was given for the buyers in accordance with their claims. This was a case dealing with contractual liability and not with the mitigation of damages.
25 We have already observed s 30 of the Sale of Goods Act does not really deal with the situation of assessment or mitigation of damages, but merely with the question of liability and the entitlement of the innocent buyer to affirm or repudiate the contract in part or in whole. There can be no doubt that China Resources on the facts were in the position of an innocent buyer. If, notwithstanding the particular facts of this case, there was a duty to mitigate then the standard of reasonableness to be applied to the decision of the innocent buyer is not a high one. `The law is satisfied if the party placed in a difficult situation by reason of the breach of a duty owed to him has acted reasonably in the adoption of remedial measures and he will not be held disentitled to recover the cost of such measures merely because the party in breach can suggest that other measures less burdensome to him could have been taken.` See Banco de Portugal v Waterlow & Sons Ltd [1932] AC 452 at p 506. It is a question of fact, depending on the circumstances of the particular case, whether the plaintiff acted reasonably. See Payzu Ltd v Saunders [1919] 2 KB 581 at pp 588-589. See also Benjamin`s Sale of Goods at p 853 para 17-025.
26 In the instant case, China Resources in our view acted reasonably in refusing to accept the alternative offer. After all, Success Honour were not obliged to accept anything less than the full contractual quantity of the quality specified, namely ST 18, and China Resources would have been left with goods which they could not then dispose of. It was, we think, conceded by both Yue Xiu and Bulsing that there is no available market for steel bars of the kind in question. Moreover, there was no evidence that Yue Xiu or for that matter Bulsing had made any firm offer, nor was there any evidence that either of them would have delivered the alternative steel bars. In fact it is in evidence that China Resources had not received a response from Yue Xiu as to the alternative steel bars until 3 May 1993 when Yue Xiu sent to China Resources a letter from Bulsing stating that Bulsing`s licences for steel export had been suspended; it was not until 6 July 1993, some three months after the shipment date, that Bulsing made a fresh offer to supply ST 25 steel bars in performance of the alternative shipment which was rejected by Yue Xiu without reference to China Resources. It is clear to us beyond peradventure that neither Yue Xiu nor Bulsing could have delivered the steel bars whether ST 25 or ST 18 within a reasonable time.
27 In the circumstances, China Resources acted reasonably and if there was a duty to mitigate had discharged such duty. China Resources succeed on this issue.
28 We now turn to the second issue, whether the cost of insurance deducted ought to have been the sum of US$9,000. As in the case of the issue on the mitigation of damages, this issue also was not raised by either Yue Xiu or Bulsing before the learned assistant registrar; it was raised by Bulsing at the hearing before the learned judge. However that may be the learned judge thought fit to deal with it and in our view quite rightly.
29 The problem the learned judge was faced with was that there was no direct evidence adduced by either side as to what the cost of insurance would have been on a shipment of steel bars from an Ukrainian port to Zhanjiang, China, in February, March and April of 1993. However, Bulsing seized upon documents disclosed by China Resources relating to another transaction altogether but transacted in February and March of 1993 to deduce what the insurance quotient would have been in the cif price also of US$306 per metric ton for steel bars shipped from an Ukrainian port to Qingdao, China, which also contained the element of a commission of US$3 per metric ton and arrived at US$1 per metric ton. The learned judge accepted this method of deducing the cost of the insurance and accordingly fixed the cost of insurance for 9,000 metric tons of the steel bars had the shipment in the instant case been effected according to the contractual terms to be US$9,000.
30 This unsatisfactory situation, in our view, arose through the lack of diligence on the part of China Resources, for they should have been ready with this evidence at the assessment hearing before the learned assistant registrar; but they were not and should not now complain.
31 In any event, China Resources` complaint is not that a deduction for the cost of insurance was made but rather that the premise on which the cost of US$1 per metric ton was arrived at was wrong. It was wrong, so it was submitted to us, because in the one case the shipment was to Qingdao and in the other to Zhanjiang. We cannot accept this because in our view the risks covered in both cases were the same; the permitted age for the carrying vessels in both cases in the respective contracts were also the same and both voyages were at the same time of the year. This is the material consideration and not that the shipments were to two different China ports. The latter may also be a material consideration but there is no evidence to show how the risks to be covered would or might be affected by the difference.
32 On the other hand, China Resources have urged upon us to consider a quotation they obtained in 1995. Even if we were inclined to consider it notwithstanding that no formal application was made to us to admit it as fresh evidence, we could not place any reliance on it as the basis on which the quotation was made was not made available to us. The basis on which such a quotation as this is made is all important.
33 In the circumstances the learned judge having determined, rightly in our view, that a deduction ought to be made for the cost of insurance acted on the best evidence available to him. In the premises the appeal on this issue fails.
34 We now address the third issue as framed before us. The learned judge gave no reasons for reversing the learned assistant registrar. In dealing with this question the learned judge said:
On the reservation for assessment of the plaintiff`s claim for damages in respect of the potential action by Success Honour for assessment if and when the plaintiff meets the claim, the proceedings before the assistant registrar on 23 January 1995 was for assessment pursuant to the O 14 judgment. If there was no such claim by Success Honour on that date, the plaintiff had not proved its loss.
35 With respect this only begs the question. Clearly China Resources` claim for US$153,000 in respect of damages payable to Success Honour could not have been allowed. But at the same time it cannot be ignored that China Resources have a potential liability which arises directly from Yue Xiu`s breach. It is not clear to us why China Resources should be penalized for commencing their action against Yue Xiu early or why they should be precluded from obtaining a remedy from Yue Xiu if Success Honour should subsequently commence proceedings against China Resources and obtain an award from them.
36 We approve of and endorse the view taken by the learned assistant registrar in his grounds of decision. It is supported by authority. He said:
At best, the plaintiffs are potentially liable to a claim by Success Honour. There is however no such liability established before me, and I am not inclined to order the defendants to provide a blanket indemnity to the plaintiffs. This would only encourage the plaintiffs to compromise any claim which Success Honour may subsequently bring against the plaintiffs. Such an approach is totally inconsistent (sic) with that adopted by LP Thean J in Fazlur Rahman v Bombay Trading Co (Pte) Ltd [1993] 1 SLR 440 , where the judge proceeded to assess whether any damages were due to the plaintiff in respect of a sum allegedly paid by the plaintiff to his sub-buyer as compensation pursuant to an arbitration award. Similarly, in Frebert-Borgnis v J & W Nugent (1885) 15 QBD 85, the court allowed the plaintiff to recover damages awarded by a French court only because that award was assessed to be a reasonable one.
37 It is true that the plaintiffs have breached their contract with Success Honour and that they are potentially liable to Success Honour for damages. But on the material before me, I am unable to say that those damages would be substantial. In the result, it may be that the plaintiffs are entitled to be indemnified only in respect of nominal damages.
38 I, therefore, reserve this item of the plaintiffs` claim for assessment if and when the plaintiffs meet Success Honour`s claim. (There is authority for such an order to be made in such circumstances in Benjamin`s Sale of Goods (4th Ed, 1992) at p 860 and Trans Trust SPRL, v Danubian Trading Co Ltd [1952] 2 QB 297 at pp 303 and 307.) Until then, they have suffered no loss for which they need be compensated.
39 The remarks of Denning LJ in Trans Trust SPRL v Danubian are apposite to this appeal. He said:
If the liability of the sellers to a third party were within the contemplation of the parties, but had not yet been assessed, then the proper course for the judge was to reserve that head of damages. Judgment could be entered for the damages already ascertained, leaving the rest to be ascertained later by the same or another judge.
40 More recently in Deeny & Ors v Gooda Walker Ltd & Ors (No 3) [1995] 1 WLR 1206, Phillips J said:
The provision of O 33 (which would appear to be equivalent to O 33 r 2 of the Rules of the Supreme Court, and which on 1 April 1996 will be O 33 r 2 of the Rules of Court 1996) enable the court to make an award of damages in relation to part of a claim while deferring for adjudication another part. The more difficult question was whether it was appropriate to defer the assessment of that part of the (plaintiff`s) claim that related to anticipated claims. ...
41 Where relief was sought in respect of potential third party liability which was uncertain the appropriate course would usually be to defer dealing with that head of damages until the extent of the plaintiff`s liability had been determined.
42 The fourth and final issue in this appeal is the order for costs the learned judge made. We can only surmise that the learned judge was exercising his discretion and in doing so probably considered that Yue Xiu and Bulsing had substantially succeeded in the appeal before him. After all the damages had been reduced from US$110,000 to US$21,000. Accordingly Yue Xiu and Bulsing were entitled to the costs but that only one set of costs should be allowed. In the exercise of his discretion he probably felt that since he rejected Yue Xiu`s arguments but accepted Bulsing`s, Bulsing should be awarded the costs rather than awarding it to Yue Xiu. Yue Xiu do not complain and we do not see any question of principle involved in this issue.
43 China Resources have not appealed against the learned judge`s decision to calculate the loss of profit on 9,000 metric tons of the steel bars instead of on 10,000 metric tons. They have also not appealed against the deduction of US$27,000 being the commission of US$3 per metric ton payable to Success Honour. They have succeeded on the first and third issues in this appeal which are by far the most important issues in this appeal. We will therefore set aside the judgment of the learned judge and the order of court entered on 8 May 1995 and enter judgment for China Resources for US$63,000 together with interest thereon at 6% pa from 17 August 1993 to the date of this judgment. We also reinstate that part of the judgment of the learned assistant registrar dated 23 January 1995 wherein he ordered that the issue of China Resources` claim for damages payable by Success Honour be reserved for assessment if and when China Resources meet Success Honour`s claim.
44 On the question of costs we award three-quarters of the costs of this appeal and three-quarters of the costs of the hearing before the learned judge to the appellants, China Resources, to be taxed and paid jointly and severally by Yue Xiu and Bulsing. There shall be only one set of costs in both instances. We do not disturb the order for costs made by the learned assistant registrar. We make no order for costs on Bulsing`s motion. The security deposit for the appeal shall be paid out to the appellants or their solicitors.
45 Appeal allowed in part.
Karthigesu JA
L P Thean JA
Yong Pung How CJ
S Suresh and Julia Loh (Allen & Gledhill) for the appellants
James Ponniah (Wong & Lim) for the first respondents
Jason Lim (Winston Chen Ong & Pnrs) for the second respondents