This judgment is subject to final editorial corrections approved by the court and/or redaction pursuant to the publisher’s duty in compliance with the law, for publication in LawNet and/or the Singapore Law Reports. |
Comtech IT Pte Ltd v Chartered Electronics Industries Pte Ltd
[1997] SGHC 277
Suit No 581 of 1995
Judith Prakash J
29 October 1997
Judgment:
Cur Adv Vult
1. At the time the events giving rise to this dispute took place, both the plaintiffs and the defendants were manufacturers of computers and computer peripherals including inkjet printers. The plaintiff company became dormant some time in 1995.
2. The plaintiffs and the defendants had a business relationship during the years 1992 to 1994. The relationship ended unhappily for both parties and as a result, in this suit, each has claims against the other. The plaintiffs are claiming the price of goods sold and delivered to the defendants, damages for breach of a contract to assemble printers and damages for conversion of the plaintiffs' material and equipment. The defendants claim damages from the plaintiffs for breach of the same contract in respect of the assembly of printers and, secondly, damages for the breach of an alleged contract whereby the defendants were to supply the plaintiffs with 24,000 printer circuit board assemblies (PCBs). I will take the claims in turn.
1. Plaintiffs' claim for goods sold and delivered to the defendants
3. In paragraph 1 of the statement of claim, the plaintiffs plead that the defendants owe them the sum of US$45,632.95 under nine invoices for goods sold and delivered to the defendants between 8 July 1993 and 16 August 1994. Against this sum which, using the exchange rate of US$1 = S$1.51, amounts to S$68,905.75, the plaintiffs agree that the defendants are entitled to set off an amount of S$18,632.95. The balance which the plaintiffs claim is S$50,272.80.
4. The defendants admit that there are sums payable to the plaintiffs under the invoices listed in the statement of claim except for the following:
(1) invoice no. EX2030 dated 19 July 1994 for the sum of US$759.50 which the defendants say should not be charged because it was for items consigned to the defendants as replacements under warranty obligations;
(2) invoice no. 2835 dated 8 July 1993 for US$192; and
(3) invoice no. EX2034 dated 16 July 1993 which the defendants say ought properly to be for the sum US$11,278.50 instead of US$15,038 as the quantity actually ordered was 150 pieces as opposed to the 200 pieces billed for because 50 of the later were warranty replacements.
5. The defendants' case in respect of invoices EX2034 and EX2030 was only raised during the trial. The allegation that the parts delivered were in respect of replacements made under warranty obligations and therefore not billable was not pleaded nor was it included in the defence. Paragraph 1 of the defence simply said that paragraph 1 of the statement of claim was not admitted apart from the fact that the defendants agreed that the plaintiffs owed them S$18,632.95. The defendants did not put forward any positive case as to why they were not liable for the invoices. Once therefore the plaintiffs proved that they had delivered the goods in the invoices to the defendants, the defendants were precluded by their pleading from giving any factual reasons excusing them from payment. In the circumstances, the plaintiffs are entitled to judgment in respect of those invoices, subject to my finding in respect of the defendants' counterclaim.
6. The only substantive issue which the defendants have raised in relation to this claim is that the plaintiffs' use of the exchange rate of S$1.51 = US$1 is not accurate and that the sum which the plaintiffs claimed ought to be converted into Singapore dollars only at the time of execution. They rely on Tatung Electronics (S) Pte Ltd v Binatone International Ltd [1991] 3 MLJ 212 and Miliangos v George Frank (Textiles) Ltd [1976] AC 443 for the proposition that where the relevant currency of the contract is a foreign currency, the court may award judgment in the foreign currency which will only be converted to the local currency at the date when the plaintiffs are given leave to execute on the judgment. Those two cases permit the court to make a judgment in a foreign currency. They do not mandate that the court does so. The following passage from The Supreme Court Practice 1997 Vol 1 under item 42/1/5 is pertinent:
'... the Court retains a residual discretion to determine whether the judgment should be expressed in sterling or in a foreign currency and ... it will exercise this discretion having regard to all the circumstances including the position of the parties and the fluctuations in the rates of exchange between the currency of the contract and sterling during the period between the date when the cause of action whether in contract or tort arose and the date of judgment. There may well be cases in which although the plaintiff may elect that the judgment should be expressed in sterling, yet the defendant may wish, or it might otherwise be just, that the judgment should be expressed in the foreign currency of the contract and vice versa.'
7. In the present case, I have no evidence on why the plaintiffs converted US dollars to Singapore dollars at the rate they chose. The writ was issued in April 1995 and there is nothing before me to show that the rate chosen was the applicable rate either at that time or when payment fell due. Whilst it was sensible to convert the amount claimed to Singapore dollars in order to give the defendants' credit for what the plaintiffs owed them, since US dollars was the currency of the account of the contract and since I do not know why the particular rate was chosen, or the fluctuations in the exchange rates between the respective dates on which the various invoices were issued and the date of the writ, I think that judgment should be entered for the plaintiffs in US dollars for the full amount of US$45,824.95 and the conversion should take place at the time of judgment at which date the S$18,632.95 can be set off. Since this is what the defendants have asked for, they cannot complain that since April 1995, the rates have moved decisively in favour of the plaintiffs.
2. Claim and counterclaim arising out of the contract for the assembly of inkjet printers
8. In October 1993, the parties agreed that the defendants would assemble inkjet printers for the plaintiffs from material kits supplied by the plaintiffs. The assembly was to take place at the defendants' factory in Batam, Indonesia. The contract is contained in or evidenced by two documents: the defendants' written quotation dated 29 September 1993 and the plaintiffs' purchase order dated 6 October 1993 accepting the quotation. Among the express terms of the contract were the following:
(1) the printers assembled were to pass four tests as specified in the quotation;
(2) the plaintiffs were to provide all dedicated presses, jigs/fixtures, testing equipment and accessories required for efficient production for a volume of 20,000 units per month eventually;
(3) the plaintiffs would be responsible for arranging the shipment of kit materials to the defendants' Indonesian company and also for the quality of the parts so consigned;
(4) the plaintiffs were to pay for the goods 30 days after delivery.
Further, by the said purchase order the plaintiffs ordered an initial quantity of 2,500 completed printers for delivery in November 1993. It was accepted by both parties that the agreement contemplated mass assembly although the defendants allege that mass assembly was implicit from the very beginning whereas the plaintiffs imply that the kits should only be suitable for mass assembly at the time when the defendants were to deliver 20,000 units per month.
9. Thereafter, between October and December 1993 the plaintiffs did send to the defendants most of the materials necessary to assemble the printers although some remaining materials were never sent and it would have been difficult to complete all 2,500 units. The defendants in fact did not complete even 15 printers successfully. In May 1994, the defendants informed the plaintiffs that the printers could not be assembled from the materials that were supplied to them. The plaintiffs now claim damages for breach of the contract of supply and the defendants in turn say that because the kits supplied were unsuitable for mass assembly, they were unable to comply with the contract and earn the profits they would otherwise have earned. They too claim damages.
Summary of the facts
10. Mr Ben Ang Siew Hock, who is employed by the defendants as their Head of Offshore Operations, was the person who provided the quotation for the assembly of the printers and who took charge of the project on behalf of the defendants. He dealt, on technical issues, with Mr Jerry Seow Kim Chuan, the plaintiffs' project manager at that time.
11. According to Mr Ang, in mid December 1993, he attended a project status review meeting with Mr Seow. He was told that the plaintiffs were facing assembly problems in relation to the kit in their assembly house in China. In the light of the problems faced, the plaintiffs had concluded that a mandatory design change was necessary for the printers and therefore they had decided to postpone the start of the mass assembly of the printers to April 1994 so that their third party contractors could re-design and re-manufacture the defective parts. At that meeting, Mr Seow handed to Mr Ang a list of the defects that the plaintiffs had found in their printers assembled in China.
12. The plaintiffs have denied that the meeting took place and further deny that they asked that the date for mass assembly be postponed. In court, Mr Seow professed to have no memory of the meeting. However, it should be noted that on or about 21 December 1993 Mr Ang wrote an internal memorandum to the defendants' personnel setting out some of the principal problems raised by the plaintiffs during the meeting. This contemporaneous memorandum supports Mr Ang's account of what happened at the meeting. It also sets out his proposal that since by that time the defendants were holding a large quantity of the plaintiffs' materials, they should proceed to do a pilot run of a limited quantity of 50 to 300 units depending on the yield. His intention was to salvage as much material as possible and also learn how to assemble the kits. The defendants would also be able to give advice on improving the design for assembly.
13. In December 1993, one Mr Koh Thong Hui was employed as the process engineer in charge of the defendants' factory in Batam. He received instructions from Mr Ang to commence the trial run of the assembly of the printers. The trial run took place in early January 1994. It was conducted with kits that should have ordinarily produced ten printers. It lasted for approximately one week and, says Mr Koh, revealed almost immediately that there were serious problems with the parts supplied by the plaintiffs. By the end of the week, after following the procedures specified by the plaintiffs, the defendants' work team of eight persons could only assemble one working printer out of the 15 kits they worked on.
14. During the course of that week, Mr Koh was in constant contact from Batam with Mr SH Liow, a mechanical engineer working with the plaintiffs. According to Mr Koh, Mr Liow told him that the plaintiffs were encountering similar problems at an assembly house in China. He suggested that whenever the defendants encountered such problems, they should re-work the plastic parts. The defendants attempted to follow Mr Liow's suggestions but found that the problems persisted. Mr Koh then asked Mr Liow to go to Batam to show the defendants how to assemble the printers.
15. Shortly after the trial run, some time in the second or third week of January Mr Liow and another test engineer from the plaintiffs' office, visited the defendants' factory in Batam. They showed Mr Koh what sort of re-work was required. According to Mr Koh, the re-work suggested comprised principally: (i) using paper cutters, penknives, needle files etc, to clear all unwanted mould flashes on the plastic parts; (ii) using files or drill bits to enlarge gear holes and (iii) using a heat gun to straighten warped paper guides. Mr Koh's opinion was that these suggestions involved ad hoc repairing on a printer by printer basis rather than a system whereby the problems could be rectified.
16. Mr Liow and his colleague attempted to assemble three printers. After three days only one out of the three worked and was able to pass the plaintiffs' tests. The defendants' team followed Mr Liow's suggestion for re-working the printers. Out of the 15 kits they had originally sought to assemble, only one worked. After Mr Liow's departure, the defendants made a final attempt at assembling five printers. The same problems were faced and not a single printer was successfully assembled. Shortly thereafter, Mr Koh wrote a report of the problems that he was facing and of Mr Liow's visit to Mr Ang.
17. The defendants concluded that the material supplied, without design and other changes, could not be assembled and could certainly not be mass assembled. The defendants therefore stopped all further work on the assembly and informed the plaintiffs of the same. On 3 March 1994, the plaintiffs who had previously complained that the defendants had insufficient support personnel in Batam for the job, wrote to one of the defendants' directors. The letter stated simply that Mr Ang had informed Mr Seow that the assembly of the printer in Batam had ceased due to circumstances such as the defendants' inability to assemble and/or difficulty encountered during the process and that the plaintiffs wanted to bring the matter to the defendants' attention.
18. The next day, the defendants replied to inform the plaintiffs that their manufacturing engineer had concluded that the printer was not manufacturable due to printer design related problems and that they strongly recommended that before they could continue with the mass production assembly, the plaintiffs' engineer had to resolve all the design related problems. The defendants also said that despite doing all the necessary re-work on the printer parts as recommended by Mr Liow, they still encountered a 100% failure rate when the various tests were carried out. A copy of the test results was also sent. The plaintiffs responded on 7 March to totally disagree with the defendants' comments. They could not understand why the defendants could not assemble fully functional printers whilst the plaintiffs' own production team could do so. In cross-examination Mr Ang stated that it had taken the plaintiffs about two months to assemble 300 printers. He explained this rate by saying they had not worked full time on the assembly.
19. Thereafter, rather surprisingly, everything went quiet until early May when the parties decided to meet to discuss the problems. At a meeting held on 5 May 1994 it was decided that the defendants were to conduct a second trial run to assemble the printers and that Mr Koh should visit the plaintiffs' factory at Ang Mo Kio to learn the method of assembly from the plaintiffs' technicians.
20. According to Mr Seow he thought that the defendants did not have sufficient skills to undertake the project and did not appreciate the skills involved. He therefore decided to prepare a list of a common assembly problems to assist the defendants. He gave this list to Mr Ang on or about 18 May. It contained examples of problems experienced by the plaintiffs during the assembly process at their other assembly plants and also their suggested remedies for these problems.
21. On or about 13 May 1994, Mr Ang instructed Mr Koh to take the 15 printers that the defendants had earlier tried assembling to the plaintiffs factory to troubleshoot the problems in the printer and to learn the plaintiffs' methods of assembling them. Accordingly, Mr Koh then spent about four days in the plaintiffs' factory. According to him, the plaintiffs' technicians only suggested ad hoc re-working of defective parts. The procedures suggested were time consuming and involved tedious re-working on a printer by printer basis. Mass assembly under those conditions was, in Mr Koh's opinion, impossible. Even after the re-working was carried out the pass rate for the printers was not good.
22. Mr Koh submitted a report on his first two days training to Mr Ang. His report stated that after re-work four printers passed the tests. The problems with all failed printers were similar. The plaintiffs' technicians had faced all these problems before and they agreed there were problems with the design and materials.
23. Mr Ang's next step was to prepare an executive summary for the defendants' management using both Mr Koh's reports and the plaintiffs' own lists of defects and problems. He also tabulated the problems in the form of a producibility review. The principal conclusion he reached was that the printer was not suitable for mass production.
24. On 30 May 1994, another meeting was held with the plaintiffs. Mr Ang showed his producibility review to them. According to him, they agreed with the defendants' findings. They asked whether the defendants would like to take over ownership of the printer. The defendants declined.
25. Two of the plaintiffs' representatives present at that meeting gave evidence. They were Mr Seow and Mr Chalton Ong, a director of the plaintiffs. In his affidavit of evidence-in-chief, Mr Seow mixed up the second meeting with the first and, as he admitted, his evidence in his affidavit about the 30 May meeting was actually what occurred at the 5 May meeting. When asked about the 30 May 1994 meeting in court, he agreed the defendants' producibility review had been presented at the meeting but denied it had been discussed. On the producibility review, Mr Chalton Ong's evidence was that when it was presented, the plaintiffs did not agree with the findings. He had understood that the findings in the review were taken from Mr Seow's list of problems. However, Mr Seow's list was only a list of possible problems with suggestions for possible remedies. Mr Ong did not accept that these problems had actually been encountered by the plaintiffs.
26. The 30 May meeting was the last substantive contact the parties had on the matter. The defendants, having taken the view that the printers could not be mass-produced, made no further efforts to do so. Since they heard nothing further from the plaintiffs either, they assumed that the plaintiffs had either disposed of the project or had effected changes to the design.
27. In October 1994 Mr Ang informed Mr Seow that the plaintiffs should take back their kits and equipment. Nothing was done. On 9 December 1994, Mr Ang wrote to the plaintiffs giving them notice that if they did not remove their property from the defendants' factory by 16 December 1994, the defendants would dispose of it. The plaintiffs' response came via their solicitors' letter of 14 December 1994. They told the defendants not to dispose of the plaintiffs' property or they would be held liable for the damages sustained. This was followed by a further letter from the plaintiffs' solicitors dated 4 January 1995 whereby the plaintiffs made, inter alia, a claim for damages suffered by reason of the defendants' failure/refusal to assemble the printers.
Findings
28. At the trial, to support their allegations of defective material kits, apart from the evidence of Mr Ang and Mr Koh, both mechanical engineers, the defendants also adduced a report from a team of mechanical engineers from the National University of Singapore. Dr Chew Chye Heng, a Senior Lecturer at NUS led the team and testified in court. The plaintiffs did not adduce any expert evidence. They relied on the evidence of Mr Seow, an electronics engineer, who stated he had been familiar with the plaintiffs' printer since it was first designed. In my view, Mr Seow could not be regarded as an expert. It was notable that the plaintiffs did not call anyone from their production line to testify. Unfortunately, Mr Liow had died before the case came to trial, but no attempt was made to call any of the technicians who worked with Mr Koh or the other engineer who had visited the defendants' Batam factory. The plaintiffs were handicapped by the lack of detailed testimony to set against the first hand experience and expertise of Mr Koh, Mr Ang and Dr Chew.
29. It is my finding that it was a condition of the contract between the parties that the plaintiffs were to provide material of sufficient quality to enable mass assembly of the printers. It was an uncontroverted point that the plaintiffs' printer was a low-cost product aimed at the lower end of the market. The defendants quoted the plaintiffs a total of S$13.20 (including testing) as the assembly charges for each unit. At that price the plaintiffs must have known that they were not going to get individually handcrafted units. The only way that the defendants could make a profit would be to set up a production line to complete as many units as possible a day. The defendants were, in fact, expecting to produce 1,000 units a day once production got into full swing. The defendants were, as the plaintiffs must have known, expecting to receive material kits that were suitable for mass production on an assembly line.
30. The material kits supplied by the plaintiffs were not suitable for such mass assembly because of the numerous defects in the gears and other parts which required painstaking re-working. I accept Mr Koh's evidence that the rate of production after hours of work and re-work would have been two printers per operator per day. Based on a production line of eight operators that would mean about 16 printers per day. The plaintiffs when they placed their first purchase order expected 2,500 printers to be delivered in about two months. At the rate of production Mr Koh thought feasible the defendants would only have been able to produce 960 printers in 60 days (assuming they worked seven days a week).
31. Dr Chew testified that the prime yield to be expected from the assembly of such a printer would be at least 80%. By prime yield is meant the percentage of printers that would work perfectly after being assembled without any re-work having to be done. The plaintiffs attacked this estimate on the basis that Dr Chew had never had any working experience in a printer producing factory. Mr Seow, however, admitted that the prime yield for a 'middle-end' printer would be 80%. He sought to qualify that admission by saying that the plaintiffs' printer was a 'low-end' one.
32. In this respect, I accept the defendants' submission that the prime yield of a 'low-end' printer should not be any different from that of a 'high' or 'middle-end' printer as the prime yield relates to the producibility of the printer and not its durability, function or feature. If anything the prime yield of a 'low-end' printer ought to be higher, given the lower profit margin involved and given that any re-work would drive up the cost. The prime yield of the plaintiffs' printer was, as the evidence established, nowhere near 80%.
33. The evidence adduced by the defendants of the defects in the material kits was convincing. The evidence of Dr Chew established that:
(1) the problems found by the defendants' employees as reflected in Mr Seow's list of defects, were consistent with those found by him and his team (save for the electrical problems and some additional problems which Dr Chew did not review);
(2) the material kits were not well manufactured and were not suitable for assembly into working printers, whether mass or otherwise; and
(3) there were flaws in the design of the printer.
34. Dr Chew was adamant in his conclusions and, in my view, his opinion and report were not in any way impugned by the cross-examination to which he was subjected. He and his team focused their attention on two mechanisms which they identified as being essential for the proper feeding of the paper into the printer. One was the gearbox assembly which drove the paper feed, and the other was the paper guide assembly which ensured that the paper was fed to the printer properly. If proper feeding of paper could not be achieved, the printer would not meet its desired function.
35. From the study of the two important assemblies, Dr Chew's team found the following defects:
(A) Gearbox Assembly
(1) The gears were not produced according to the dimensions specified in the drawings.
(2) The gearbox assembly could not be assembled in the manner that it was designed (for free running fits).
(3) The gears had to be forced into the gear pins. This process resulted in intermittent motion of the gear train and thereby rendered its intended function, to drive the paper guide assembly smoothly, ineffective.
(4) In order to alleviate problem (3) above, a manual enlargement of the inner holes of the gears was necessary. This process was, however, incompatible with the concept of mass assembly.
(B) Paper Guide Assembly
(1) From the drawings, the pivot bar roller and pivot bar may not lie on the same plane.
(2) From the tolerances specified in the drawings, the gap difference between guide 1 and guide 3 was plus minus 0.17mm from the plane.
(3) The measured gap difference between guide 1 and guide 3 in the team's samples was within the specified tolerance and yet did not serve the function of gripping the paper properly.
(4) As a result the paper was pulled on one side only, resulting in a skewing of paper during feeding. This was unsatisfactory as the printer needed a constant and regular paper feed to function properly.
(5) The poor quality control of the gearbox housing the loose tolerances specified for the pivot arm left and pivot arm right also resulted in intermittent motion of the feeding mechanism of the paper guide assembly and improper feeding of the paper.
36. The plaintiffs' evidence also supported the defendants' submission relating to the defects in the material kits. Mr Seow admitted compiling a comprehensive list of defects that he acknowledged were found in the printer. He further admitted that he had set out in this list remedies that would need to be carried out to various parts in order for the printer to function properly. Mr Seow conceded too that new moulds were necessary for certain parts and that the plaintiffs had employed sub-contractors to do these re-designs. Yet, during cross-examination, Mr Seow refused to acknowledge that the printers could not be mass assembled, still maintaining that they could be assembled with re-work. In my judgment, this last position flew in the face of the evidence and I could not accept it.
37. Mr Seow did claim that the re-work on the parts of the kit ought to have been done as 'preparatory work'. When asked whether or not the re-work needed to be done on a printer by printer basis, he said no. Yet, he admitted that as far as one of the parts of the printer, the pivot bar, is concerned, the problems that would require re-working would not surface until the printer had been fully assembled. When asked again whether re-work was therefore necessary on a printer by printer basis, Mr Seow refused to agree. He was determined to maintain the plaintiffs' stand notwithstanding that it had no basis in logic.
38. Another aspect of Mr Seow's evidence which was not satisfactory related to his denial of the conversation with Mr Ang that took place in December 1993. It would be recalled that Mr Ang's contemporaneous memorandum noted the fact that the plaintiffs had decided to postpone the date for mass assembly from November 1993 to April 1994. Mr Seow denied having given the information to Mr Ang. He then had to explain why if there had been no postponement the plaintiffs had not complained when the defendants failed to deliver the 2,500 printers in November 1993. His response to that was that he was not aware that the scheduled delivery date was in November. This answer is not credible given that Mr Seow held the position of project manager and purported, from his evidence, to be completely familiar with the production of the printer and the dealings which the plaintiffs had with the defendants on this matter.
39. I therefore find that the defendants were not in breach of contract in failing to deliver 2,500 assembled printers to the plaintiffs. Instead, it was the plaintiffs who were in repudiatory breach of the contract because they delivered material kits which were so defective that the defendants were not able to carry out their part of the contract. By reason of this breach, the defendants were discharged from their obligation to assemble the printers. The plaintiffs' claim under this head must be dismissed. The defendants are entitled to judgment on their counterclaim with damages to be assessed on the basis that by reason of the defects in the material kits supplied, the defendants were unable to assemble the 2,500 printers which were the subject of the plaintiffs' firm order and were unable to earn profits from this contract.
3. Claim for conversion
40. The following legal propositions relating to the tort of conversion are derived from Clerk & Lindsell on Torts 16th Ed., Chapter 22 and Abdul Muthalib bin Hassan V Maimoon bte Haji Wahid [1992] 2 MLJ 108.
41. It is not conversion of another's chattel simply to keep it without the permission of the owner. To constitute conversion, there has to be some detention of the chattel which is consciously adverse to the rights of the owner. The usual way of showing this is by proving that the owner made a specific and unconditional demand for the return of the goods and the defendant, the person in possession, unconditionally refused to do so. The demand which is made for the return of the chattel must be unconditional and also specific. Further, there is no right of action unless the demand is brought to the knowledge of the defendant before the issue of the writ.
42. The defendant's refusal to return the chattel is in itself not conversion but only evidence of conversion. It is necessary to consider whether the refusal is unconditional or not and to decide whether in either case, the refusal is justified. If there is an unconditional/unjustifiable refusal, then the defendant is denying the title of the owner and can be made responsible for conversion. It should also be noted that a refusal does not cease to be unconditional if the defendant, while admittedly in possession of the goods and while not disputing the owner's right, claims time to do something to the goods other than taking steps towards their return.
43. In the present case, the plaintiffs have two claims for conversion. In their original statement of claim, they pleaded that on 2 February 1995, the defendants wrongfully refused to permit the plaintiffs to re-take possession of the printer kit materials and had thereby converted the same to their own use. The defendants claimed US$53,450 being the cost of the printer kits. On 16 October 1996, the plaintiff amended their statement of claim by, inter alia, adding an allegation that the defendants had also converted to their own use the computer system, production fixtures, test jigs and packing boxes (hereinafter collectively, 'the additional items'). The quantum of the claim was also amended and a total of S$390,297.67 (out of which S$244,655.67 was stated to be the value of the printer kits) was claimed. I now turn to consider the facts.
44. According to Mr Ang, some time in October 1994, he informed the plaintiffs that they should remove their printer kits as these were occupying space in the defendants' factory and the defendants wanted to renovate the factory. It appears that this was not the defendants' first request for the removal of the kits as, in a letter dated 23 September 1994, Mr Seow referred to a conversation he had had with Mr Ang during which Mr Ang had suggested that the plaintiffs should give the defendants instructions on what to do with the 2,500 printer parts in Batam.
45. The plaintiffs did not remove the kits. So, on 9 December 1994, the defendants wrote to the plaintiffs to inform them that if they did not take the kits away by 16 December, the defendants would dispose of them. The plaintiffs then instructed solicitors who wrote initially to the defendants telling them not to dispose of the kits as otherwise the plaintiffs would hold the defendants responsible. On 4 January 1995, the plaintiffs' solicitors sent a letter to the defendants making various claims on behalf of the plaintiffs. They also stated that their clients were prepared to take re-delivery of 'the inkjet printer material kits' and would require a reasonable time to do so.
46. On 13 January 1995, a reply was sent to the plaintiffs' solicitors on behalf of the defendants. The plaintiffs were asked, inter alia, to advise as soon as possible when they would be able to take delivery of the defective printer kits as the defendants were unable to store the kits for much longer. Some more correspondence passed between the parties in the course of which the plaintiffs denied that the kits were defective. Then, on 2 February 1995, a letter was sent on the defendants' behalf to the plaintiffs' solicitors stating that the defendants' position was that the kits were defective and that since the plaintiffs had now asserted that the kits were not defective, the defendants 'intend[ed] to retain the material kits to support its assertion'.
47. The plaintiffs commenced this action on 5 April 1995. Their claim for conversion at that stage as noted above was only in respect of the kits. The first mention in these proceedings about the plaintiffs' intention to recover the additional items was in para 28 of Mr Ong's affidavit filed on 10 September 1996. On the first day of the trial ie 14 October 1996, the plaintiffs applied to amend their statement of claim to, inter alia, include the claim for conversion of the additional items. At that stage I was informed by Mr Yeo, counsel for the defendants, that he had first been given notice of the proposed amendment on 9 October 1996 and that was the first time that the plaintiffs had indicated that they wanted these items back. Mr Yeo stated that he had informed the plaintiffs' solicitors on 9 October itself that the defendants were prepared to give back the additional items but the plaintiffs had decided to proceed with the claim. It should also be noted that by their solicitors' letter of 10 October 1996, the defendants expressly offered to return the additional items and the kits to the plaintiffs. The plaintiffs, however, refused to accept the same.
48. In view of the way in which the matter was handled, I think it right, as the defendants have submitted I should, to consider the claim for conversion of the additional items separately from that for conversion of the kits. The defendants' submission is that the plaintiffs did not make a specific demand for the return of the additional items before the action commenced or even before they amended their statement of claim to include these items. The defendants also say that they have never refused to return the additional items. On the law, therefore, there is no cause of action in conversion for these items.
49. The plaintiffs did not dispute that they must have made a demand for the return of the additional items in order to found an action in conversion. Their contention was that they did make such a demand. They cited Mr Ang's letter of 9 December 1994 in which he referred to 'the return of the material kits'. They argued that since during cross-examination, Mr Ang confirmed that the defendants intended to return everything belonging to the plaintiffs and not just the printer kits, when he referred to 'the return of material kits' in his said letter, he used the phrase loosely to include all items consigned to the defendants for assembly of the printers. Likewise, they say, when the plaintiffs' previous solicitors in their letters sent on 4, 17 and 24 January 1995 to the defendants referred to 'the inkjet printer material kits', the 'printer material kits' and 'the said printers' respectively and asked for the return of these items, they meant and were understood to mean that the request was made for everything in the defendants' possession.
50. I do not accept the plaintiffs' submission. The law is clear. The demand must be specific and must identify the items which are to be returned. It must be made before the writ is issued. In this case, the plaintiffs apparently overlooked the additional items and they cannot rely on the defendants' intention to return the same to make up for their own deficiency. Accordingly, I hold that the defendants did not convert the computer system, production fixtures, tests jigs and packing boxes.
51. The position in relation to the kits is different. A clear demand was made. The defendants refused to comply with this demand because they wanted to retain the kits in order to prove that they were defective so as to defend any claim which the plaintiffs might bring against them. The defendants have submitted that it was reasonable for them to temporarily retain the kits as they were the only evidence the defendants had of the defective nature of the kits. They said that their refusal was a qualified refusal such that the moment the defendants had the expert's evidence on the kits they would be returned. In fact, the defendants did offer to return the kits to the plaintiffs shortly after Dr Chew's report was finalised in September 1996 but the plaintiffs refused to accept them.
52. In my judgment, the defendants' prolonged retention of the kits was not justified. On 2 February 1995 their refusal to return the kits was unconditional. It would be recalled that a refusal is not conditional if the defendant simply claims time to do something to do something to the goods apart from taking steps to return them. Even if at the start, their refusal to return the kits could perhaps have been considered a qualified refusal, the effect of this was that it would become their duty, after having had reasonable opportunity to examine the kits, to return them. The plaintiffs could very well have obtained an expert's report on the kits in February 1995 itself and could have returned them to the plaintiffs at the latest in April 1995. They cannot justify keeping the kits right up to October 1996 when they finally offered to return them. I therefore hold that the plaintiffs have made out their claim in conversion in respect of the kits.
53. This holding is not, however, the end of the matter. I have to consider what damages the plaintiffs are entitled to claim as a result of the conversion. According to vol 45, Halsbury's Laws of England (4th Ed.) the measure of damages in conversion is normally the value of the goods at the time of conversion, together with any consequential damage flowing from the conversion which is not too remote to be recoverable in law. However, there is no universal rule for the assessment of damages and the plaintiff can recover no more than the loss actually sustained by him. See para 1454.
54. The plaintiffs submitted that they had spent S$244,655.67 acquiring the printing kit materials and had the defendants returned the items, they would have been able to fulfilled their orders under an agreement which they had with Samsung UK Limited ('Samsung UK'). The defendants' conversion therefore also caused the plaintiffs to lose the opportunity to earn a profit of $73,000 on the printers. Thus, the plaintiffs submitted their total loss amounted to S$317,655.67.
55. The only evidence that the plaintiffs led on the cost of the kits was a seven page bill of materials that had been compiled by Mr Seow. This contained a list of the parts making up each printer and indicated the cost of each such part. The total cost of the printer was stated to be S$91.5966. This figure included, however, S$13.20 being the defendants' price for assembling the unit and S$3.61 being the cost of spray painting the printer on completion. The actual material cost was therefore approximately S$74.79. The problem, however, is that Mr Seow did not give any evidence of how the costs of the individual components were derived nor provide any documents upon which the figures were based except for an invoice from Ngai Keung Metal and Plastic Manufacturing Ltd of Hong Kong showing that this company had sold the plaintiffs 3,000 pieces of 'inkjet printer full port kit' at the price of US$21.38 per kit. This meant that 2,500 kits cost the plaintiffs US$53,450 or S$80,709.50 using the plaintiffs' rate of US$1 = S$1.51. The plaintiffs were also able to produce a copy of the letter of credit established to pay this invoice. The plaintiffs have, therefore, only been able to establish a cost of S$80,709.50 for the kits.
56. As regards their loss of profit, the plaintiffs calculated this on the basis of a contract which they had with Samsung UK dated 15 September 1993 for the supply of 25,000 printers per year. The printers were to be sold under the brand name 'Vortec' which belonged to Vortec UK Ltd, a subsidiary of Samsung UK. The plaintiffs said that their profit per printer was S$42.40.
57. Although the plaintiffs alleged that they intended to service this contract with the printers assembled by the defendants, they did not produce any evidence to show that they were unable to fulfil the contract by reason of the defendants' failure to return the kits. There were no copies of letters of credit established pursuant to the contract nor any correspondence between the parties either explaining or complaining about a delay/failure in supply. I cannot rule out the possibility that either the contract was cancelled or the plaintiffs satisfied it from other stock which they had.
58. Further it was Mr Ong's evidence that the plaintiffs found a company to take over the assembly of the printer project and the patent rights were transferred to the joint venture partner towards the end of 1994. The plaintiffs said that this was the time when they requested the return of the printer kits and the additional items so that all could be passed to the new joint venture partner. However, no documentation was produced to substantiate this. If everything was to be passed to the joint venture partner as alleged, then the party who lost the opportunity of making a profit from the printer kits in 1995 was the joint venture partner and not the plaintiffs. This evidence also raises questions of what happened to the Samsung contract. If everything was transferred to the joint venture party, would not that have included the benefit of the Samsung contract? This evidence therefore undermines the plaintiffs' claim for loss of profits considerably.
59. In my judgment, the plaintiffs have succeeded in proving only that the cost of the printer kits as at February 1995 was S$80,709.50. I have no alternative but to take this as the value of the kits. The plaintiffs have not proved their alleged loss of profit. In the circumstances, the plaintiffs are only entitled to the sum of S$80,709.50 as damages for the defendants' conversion of the kits.
4. Defendants' counterclaim in respect of the sale of PCBs
60. In April 1993, the parties entered into a contract for the defendants to supply the plaintiffs with PCBs. This contract is contained in or evidenced by the defendants' quotation dated 14 April 1993 and the plaintiffs' purchase order no. 1108 dated 15 April 1993. The terms of the quotation were:
(1) that the plaintiffs would place an order for 24,000 PCBs of which 8,000 pieces were to be firm ie non-cancellable;
(2) the remaining 16,000 pieces were subject to confirmation which confirmation had to be given at least 12 weeks prior to the desired delivery date ('the lead time');
(3) payment was to be made 30 days after delivery.
The defendants also state that it was a term of the contract that the plaintiffs would supply them with ASIC chips which were essential for the PCBs. This term does not appear in either the quotation or the purchase order but the plaintiffs do not dispute it. By their purchase order, the plaintiffs ordered 24,000 PCBs specifying that 8,000 pieces constituted a firm order and the remaining 16,000 pieces were subject to cancellation. A delivery schedule was given in the purchase order: the defendants were to deliver 2,000 pieces on each of 15 July, 29 July, 12 August and 26 August 1993.
61. In the event, the defendants invoiced the plaintiffs for a total of 10,000 PCBs. Only 9,872 PCBs were actually delivered as 128 were unsatisfactory and had to be repaired/re-worked. The plaintiffs have paid for the 9,872 PCBs which they accepted. The defendants' claim is that the plaintiffs had placed a firm order for all 24,000 PCBs and that they had therefore incurred expense by purchasing the necessary components to make up these pieces. They were unable, however, to make more than the initial 10,000 pieces since the plaintiffs had stopped supplying them with the ASIC chip. The plaintiffs were therefore in breach and the defendants are entitled to sue them for this breach. The plaintiffs' defence is that they only confirmed the initial 8,000 pieces and therefore having paid for all that they ordered, they have no liability to the defendants. Neither were they obliged to supply the defendants with additional ASIC chips for PCBs they did not order.
62. The first issue is what the contract actually provided for. The plaintiffs say that they had a firm contract to buy 8,000 PCBs and the possibility of buying a further 16,000 PCBs provided they gave the defendants the necessary 12 weeks' notice of the proposed delivery dates. The defendants say that there was a firm contract for the sale of 24,000 PCBs with the delivery dates for the first 8,000 pieces having been confirmed and the delivery dates for the remaining pieces to be notified to them.
63. The wording of the two documents supports the plaintiffs' interpretation rather than that of the defendants. The defendants' quotation states:
'Comtech shall place an order for the full 24,000 pcs of which 8,000 pcs are firm order (non-cancellable). Comtech shall confirm order for the remaining 16,000 pcs at least 12 weeks prior to the desired delivery dates.'
The plaintiffs' purchase order, consistently with the quotation states:
'COMTECH JM2692-2 PRINTER BOARD ASSEMBLY
8000 pcs firm order
16000 pcs subject to confirmation'
In my judgment, the contract which was made between the plaintiffs and the defendants was for the purchase of at least 8,000 PCBs with the plaintiffs having the possibility at their option of ordering up to 16,000 more pieces which the defendants would then have to supply. If the parties had intended a firm order for 24,000 pieces from the outset, the documentation would have been worded differently.
64. The next question that arises is whether in fact the plaintiffs confirmed any order for more than the initial 8,000 pieces. The defendants' stand as explained by Mr Ang in his affidavit in chief was that the plaintiffs' purchase order was a blanket purchase order which meant that the quantity was specified in the purchase order though the delivery times were not. Thus, when the purchase order was received it was clear in the defendants' mind that the quantity specified was 24,000 pieces. This contention is undermined, however, by two internal documents which the defendants prepared on 21 April 1993 in connection with the purchase of the components for the PCBs. In both those documents it was noted that the plaintiffs had placed firm orders for two deliveries of 4,000 sets each in June and July 1993 and that the remaining 16,000 sets were subject to confirmation from the customer. I must now examine the facts to determine whether any such confirmation was subsequently given by the plaintiffs.
65. In their purchase order, the plaintiffs had specified that they wanted the 8,000 pieces delivered in batches of 2,000 pieces at two week intervals commencing 15 July 1993. On 14 May 1993, Mr Seow sent a letter by facsimile transmission to Mr Ang entitled 'Re: Production Schedule'. The contents of this letter are important and I therefore reproduce them below:
'Please note following expected delivery schedule (July-Sept).
We reserve the right to make changes provided CEI [ie the defendants] is informed of the changes at least two weeks in advance.
Delivery date | Quantity | Total delivery |
5 July | 1000 | 1000 |
12 July | 1000 | 2000 |
19 July | 1500 | 3500 |
26 July | 1500 | 5000 |
2 August | 1500 | 6500 |
9 August | 1500 | 8000 |
16 August | 1500 | 9500 |
23 August | 1500 | 11000 |
30 August | 1500 | 12500 |
6 September | 1500 | 14000 |
13 September | 1500 | 15500 |
20 September | 1500 | 17000 |
It would be noted that pursuant to this delivery schedule, the first 8,000 pieces which had been confirmed on 15 April 1993 were to be delivered by 9 August 1993 and a further 9,000 pieces were to be delivered between 16 August and 20 September 1993. The first delivery date in respect of the additional pieces was 16 August 1993 which was about 13 weeks after 14 May 1993. The contractual lead time was thus adhered to.
66. On 15 May 1993, Mr Seow sent Mr Ang a further letter. It was also entitled 'Re: Production Schedule'. In this letter, he stated: 'Yesterday, I submitted an expected delivery schedule for the period July to September. However, we need to know how far we can push production. So the following is a proposed production schedule'. He then set out his production schedule with delivery dates running weekly from 5 July 1993 right up to 13 December 1993 envisaging a total quantity of 82,000 PCBs being delivered by 13 December 1993.
67. In late June 1993, the defendants sent the plaintiffs three proforma invoices in respect of the PCBs. Each was dated 25 June 1993 and signed by the defendants on that date. In each invoice, the total quantity ordered was stated to be 24,000 pieces. The first invoice was in respect of 6,000 pieces to be delivered in July 1993, the second, in respect of 12,000 pieces to be delivered between 2 and 23 August 1993 and the final one was for 6,000 pieces, half of which were to be delivered on 30 August 1993 and the balance on 6 September 1993.
68. According to Mr Ong's oral testimony, he rejected these three invoices since the plaintiffs had ordered only 8,000 pieces. Several days later he spoke with Mr Ang on the phone and during that conversation, they agreed that the plaintiffs would take 5,000 pieces in July. Mr Ang also asked Mr Ong whether the plaintiffs could take an extra 2,000 pieces. As the plaintiffs were then negotiating their contract with Samsung UK, Mr Ong thought they could absorb that additional number and asked Mr Ang to give him another proforma invoice for 5,000 sets.
69. The defendants subsequently issued a further proforma invoice also dated 25 June 1993. The total quantity ordered was as mentioned in the invoice was 24,000 pieces and the invoice was for 5,000 pieces to be delivered in July 1993. This invoice must have been accepted by the defendants as it bears the signature of Mr Ong Soo Chuan, one of their directors. On 18 August 1993, the defendants issued a proforma invoice in respect of an order of 5,000 pieces to be delivered in September 1993. This was accepted by Mr Ong on behalf of the plaintiffs. It was agreed by all that the defendants did deliver 5,000 pieces to the plaintiffs in July 1993 and a further 5,000 in September 1993. However, 128 pieces were defective and had to be taken back.
70. In court, Mr Ang disagreed that Mr Ong had told him, on receipt of the first set of invoices, that the plaintiffs had not ordered 24,000 PCBs. He also disagreed that Mr Ong had asked him to re-send invoices for 10,000 PCBs only. He explained that the first set of invoices had been sent out because Mr Ong had asked him whether the defendants could allow the plaintiffs to pay for the PCBs by letter of credit. In the quotation, the payment term had been '30 days nett'. Mr Ang had no problem with Mr Ong's request and since the latter did not specify the amount of the letter of credit, Mr Ang assumed that Mr Ong had wanted it to apply to the whole purchase order. He prepared three invoices so that the plaintiffs could apply for credit as and when the delivery dates drew near. After he sent out the three invoices, either Mr Ong or one of his accountants telephoned Mr Ang and requested that since the defendants were very sure that 5,000 pieces were going to be delivered in July, the invoice should be made for 5,000 pieces as applying for a credit for 6,000 PCBs as per his first invoice would leave 1,000 pieces unutilised. Mr Ang acceded to this request and sent out the invoice dated 25 June for 5,000 PCBs. Mr Ang disagreed with Mr Ong's evidence that he had been informed by Mr Ong that the invoices were not correct and the purchase order only referred to 8,000 pieces being required. Mr Ang said that if this had been so, his replacement invoice would have been for the 8,000 pieces instead of only 5,000 pieces.
71. In their counterclaim, the defendants have pleaded that the plaintiffs confirmed orally on or about May 1993 and by letters dated 14 May 1993 and 15 May 1993, the order for the remaining 16,000 PCBs. The defendants were not, however, able to substantiate their assertion of an oral confirmation. Their witness, Mr Lim Piak Hwa, the recipient of this confirmation, could not remember the relevant conversation. Thus, the defendants have to fall back on the two letters.
72. In court, Mr Ang agreed that the defendants did not regard the letter of 15 May as a confirmation of the plaintiffs' order. It was simply a forecast of production because the plaintiffs wanted to know to what extent the defendants would be able to push up production. That leaves the letter of 14 May 1993. In my opinion, that letter was a confirmation that the plaintiffs wanted 17,000 pieces in total. They specified not only the expected delivery dates but also the exact quantities to be given on those dates. It was not qualified in the same way as the letter of 15 May and cannot be read as an enquiry as to whether the defendants would be able to provide the quantities mentioned on the dates mentioned. The factual matrix at the time of the letter was that the plaintiffs had earlier indicated that they mostly probably wanted at least 24,000 pieces if not more and they knew that in order that the production schedule not be disrupted, they had to give their confirmation of the additional amounts fairly quickly. They must have sent the letter of 14 May knowing that the defendants would regard it as confirmation of the additional 9,000 pieces mentioned therein and with the intention that the defendants should do so.
73. The fact that the plaintiffs accepted 9,872 pieces is a further indication that they had ordered more than the original 8,000 PCBs. The plaintiffs recognised that this acceptance was inconsistent with their contention. Mr Ong's first explanation for this inconsistency, as set out in the plaintiffs' letter of 10 March 1994 was that there was no such confirmation for the excess pieces and that they were only accepted out of 'goodwill'. In para 14 of the amended reply and defence to counterclaim and during cross-examination, he changed his explanation and said that it was pursuant to an oral agreement that he reached with Mr Ang that these nearly 2,000 extra pieces were accepted. When questioned further, he was unable to explain why he had not raised this earlier or why he had said something quite different in his own letter. I also found his evidence in relation to the rejection of the original proforma invoices unsatisfactory. I accept Mr Ang's testimony that these were sent to the plaintiffs at Mr Ong's request because the plaintiffs wanted to pay by letter of credit at 60 days sight rather than 30 days after delivery. This was a payment term that was less favourable to the defendants than that originally agreed and it is highly unlikely that they would have come up with it unilaterally without a specific request being made.
74. The letter of 14 May 1993 is, however, evidence only of the plaintiffs' confirmation that they wanted 17,000 PCBs in total. It does not support the defendants' contention that the plaintiffs had confirmed all 24,000 pieces. There is no evidence that the plaintiffs confirmed their order for the last 7,000 pieces.
75. The defendants have contended that they have suffered damages in relation to the breach of the contract of supply by the plaintiffs. They have asked for these damages to be assessed. The plaintiffs contended that the defendants are not entitled to any damages because they have failed to mitigate such damages. That is an issue that can be taken up on assessment. The defendants are, in my view, entitled to judgment on their counterclaim in respect of the extra 9,000 PCBs ordered on 14 May 1993.
Conclusion
76. On the basis of my findings above, the following orders should be made:
(1) there will be judgment for the plaintiffs for such sum as is equal to US$45,824.95 converted into Singapore dollars at the rate mid way between the buying and selling rates applicable as at today's date as published in the Straits Times less S$18,632.95. I will hear the parties on the appropriate interest order to be made;
(2) there will be judgment for the plaintiffs for the sum of S$80,709.50 and interest thereon at 6% per annum from the date of the writ in respect of the plaintiffs' claim for conversion of the printer kits;
(3) the plaintiffs' claim for breach of the contract of assembly of printers is dismissed and there will be judgment for the defendants in respect of their counterclaim relating to that contract for damages to be assessed; and
(4) there will be judgment for the defendants in respect of their counterclaim relating to the breach of the contract for the supply of PCBs (in respect of the 9,000 PCBs not taken by the plaintiffs) for damages to be assessed.
77. As for costs, I make the following orders. First, the plaintiffs are entitled to the costs of their claim for their outstanding invoices. They are also entitled to the costs of their claim for conversion of the printer kits. The plaintiffs shall, however, pay the defendants their costs in respect of the plaintiffs' claim for conversion of the additional materials. As the claim and counterclaim in respect of the assembly of the printers are intertwined, there will be one set of costs for those matters and that will be paid by the plaintiffs to the defendants. Finally, the defendants are entitled to their costs in respect of the counterclaim for breach of the PCB contract.
JUDITH PRAKASH
JUDGE
See Tow Soo Ling with Gan Theng Chong (Patrick Wee & Co) for the plaintiffs
Alvin Yeo and Nishith Shetty (Wong Partnership) for the defendants