Zalco Marine Services Pte Ltd v Humboldt Shipping Co Ltd
[1998] SGCA 26
CA 176/1997
Goh Joon Seng J; Karthigesu JA; L P Thean JA
30 April 1998
Judgment:
KARTHIGESU JA
Cur Adv Vult
(delivering the judgment of the court): The background
1.This appeal arises out of the attempted sale and purchase of a ship known as the `Anna Spiratou`. The appellants, Zalco Marine Services Pte Ltd (Zalco Marine), were interested buyers of the ship, and the respondents, Humboldt Shipping Co Ltd (Humboldt), were the sellers. After considerable negotiations by their respective brokers, the deal fell through. In any event, the ship eventually sank on 15 June 1996 and insurance was later claimed on it by Humboldt.
2.The first issue before us was to ascertain whether a contract of sale existed between Zalco Marine and Humboldt. There was no dispute that all the terms were set out in writing; the question was thus simply whether a binding legal relationship existed between the parties. If there was, then it was conceded by Zalco Marine`s counsel that his client would be in repudiatory breach of such a contract by failing to complete the sale. This therefore raised the further issue of whether Humboldt was entitled to claim the amount of the deposit as compensation.
3.The transaction here was to be in three stages, namely: (a). negotiations between the ship brokers acting for Zalco Marine and Humboldt for the sale;
(b). the signing of an amended standard form memorandum of agreement (MOA), in the form of the Norwegian Saleform 1987 (NSF 87) to reflect the negotiated terms;
(c). the actual performance of the contract.
4.Stages (b) and (c) never took place. The issue was thus whether a contract was already concluded under stage (a).
5.For easy reference, the events which took place in stage (a) could be broken down further into three periods: (a). From 23 February 1996 to 28 February 1996
. There was no dispute that a binding contract was not concluded during this period. The correspondences reflect only the negotiations.
(b). 29 February 1996
. Humboldt took the view that the contract of sale was concluded on this date. There were two `recap` telexes, one from each party`s brokers (a `recap` telex is one which sets out the terms agreed between the parties). There was also an unsigned draft MOA prepared by Humboldt`s brokers.
(c). After 29 February 1996
. There were further negotiations between the parties, but the question was whether these terms merely varied an already concluded contract (as contended by Humboldt) or whether they were evidence to show that a contract had yet to be concluded (as contended by Zalco Marine).
6. The critical documents
The negotiations between the parties were made through an exchange of telexes. In the opening telex by Zalco Marine, in so far as relevant, the offer to purchase by Zalco Marine on 23 February 1996 was made on the following terms:
1 Buyers to lodge 10% deposit into joint account at sellers nominated bank within 3 working days of signing MOA on fax.
Balance of purchase funds to be paid to sellers nominated account on delivery and in exchange for buyers required delivery documentation .
3 Vessel to be delivered charterfree , safely afloat, at a safe berth or anchorage
7 Once MOA signed and 10% deposit lodged the buyers shall have the right to place 2 representatives on board the vsl without any interference to the vessel. Such reps to be on board entirely at buyers risk and expense.
11 Otherwise NSF 87 suitably amended to incorporate the above . [Emphasis is ours.]
So, right from the start, Zalco Marine`s offer to buy was made on the basis that the ship would be free of its time charter on the delivery date.
7.In reply, as far as relevant, Humboldt`s first telex on 23 February 1996 counter-proposed with the following:
Balance of purchase funds to be paid free of bank charges to the sellers nominated London bank on delivery of the vessel against presentation of deliver documentation as reasonably required by buyers for change of flags/registration. [Emphasis is ours.]
After this telex, there were no references in further telexes about the term concerning documentation. On 26 February 1996, Zalco Marine`s brokers replied on their own accept/except terms, and the only unresolved point then was the price of the ship.
8.There were further exchanges. But on 28 February 1996, Zalco Marine appeared to have made the final offer. The telex states:
This for confirmation only for reply by 1600 hrs 28th Feb 1996:
1 Price usd 5,000,000 cash less 3%
3 Agreed sllrs last
9 Agreed sllrs last
End offer
Await yr confirmation
9.On the same day, 20 minutes before the deadline, Humbolt replied:
1 Price usd 5,000,000 cash less 4%
3 Agreed sllrs last
9 Agreed sllrs last
Will draw up recap accordingly,
10.Zalco Marine`s brokers then acknowledged the confirmation:
Tks yr confirmation and for sake good order, confirmation received 1533 hrs london time 28th feb 1996, look forward ownrs lifting their subject by 1600 hrs London on Friday 1st march 1996.
I will do you a favour (whilst you concentrating helping owners to get out of chtr) and prepare the re-cap tomorrow morning. [Emphasis is ours.]
The expression `lifting their subject` meant freeing the ship from its time charter by the time of its delivery date. On 29 February 1996, Humbolt succeeded in lifting the subject and informed Zalco Marine`s broker.
11.On 29 February 1996, in the recap telex prepared by Zalco Marine`s broker, the following was repeated as the agreed terms. In particular, the following was stated:
This is my understanding of re-cap, pls confirm same all in order from sllrs side:
Balance of purchase funds to be paid to sellers nominated account on delivery and in exchange for buyers required delivery documentation. [Emphasis is ours.]
12.On the same day, Humboldt`s brokers replied in its recap telex that the documents presented would be as per their first telex:
Herewith my understanding of recap
Balance of purchase funds to be paid free of bank charges to the sellers nominated London bank on delivery of the vessel against presentation of delivery documentation as reasonably required by buyers for change flag/registration. [Emphasis is ours.]
The term as to documentation against delivery was again repeated in the draft MOA prepared by Humboldt.
13.On 5 March 1996, Zalco Marine`s brokers responded by proposing acceptance of Humboldt`s condition of `reasonably required` but proposed that the documents be actually listed in an addendum. The content of this list remained the only outstanding issue.
14.There were subsequent correspondences on what these documents should be, but before this was resolved, Zalco Marine decided to abort the purchase. The MOA was never signed; the deposit was never paid.
Was there a concluded contract?
The decision below
15.The learned Judicial Commissioner below concluded that a binding contract between the parties was reached on 29 February. His judgment is reported at [1998] 1 SLR 503. He reasoned as follows:
10.2 In fact the evidence in the subsequent telexes sent by the defendants [Zalco Marine] shows that until the 28 February 1996 only two areas of agreement really remained outstanding between the parties, namely, the purchase price of the ship which had not been agreed and the lifting of the subject, ie the plaintiffs [Humboldt] had not freed the ship from its existing time charter. On 28 February 1996 by telex the defendants and the plaintiffs had agreed to the price of US$5,000,000 and the defendants` broker on that day had given the plaintiffs` broker 48 hours, ie until 1 March 1996, to lift the subject. The plaintiffs succeeded in lifting the subject on 29 February 1996 and in so informing the defendants` broker.
16.Hence, in the circumstances, having lifted the subject on 29 February 1996, the sale became outright. As for the list of documents required by Zalco Marine, the learned judicial commissioner held that that was only a detail on what was already agreed upon, namely that all documents `reasonably required` for change of flag/registration would be supplied by Humboldt. The end result was that Humboldt had kept to their side of the bargain to the last by agreeing to give documents in the list as wanted by Zalco Marine.
17.The learned Judicial Commissioner went on to find that the telexes had constituted a contract and Humboldt`s recap accurately reflected and confirmed the contract arrived at on the telexes. Zalco Marine was thus bound to accept the recap by Humboldt`s brokers. He concluded as follows:
12.1 As the only subject as evidenced by the telexes had already been lifted, the plaintiff`s broker`s recap was therefore a clean recap and as I have found for the plaintiffs on the issue of documentation, the defendants were bound, in the circumstances, to accept the plaintiffs` broker`s recap. I found that the telexes had constituted a contract and the plaintiffs` recap accurately reflected and confirmed the contract arrived at on the telexes and the defendants were bound to accept the plaintiffs` broker`s recap. [The Judicial Commissioner`s emphasis.]
The existence of a contract
18.The issue in the appeal was whether the telexes in themselves evidenced a properly concluded contract, or did the term as to documentation mean that the parties were still negotiating and hence had yet to reach an agreement.
19.As counsel for Zalco Marine contended, `all the terms were set down in writing. It [was] therefore unnecessary to consider the oral evidence; indeed it would be excluded under the parole evidence rule.` Therefore, we simply have to look at the telexes to determine the existence of a contract.
20.In this respect, we recalled that a similar situation involving whether a contract was properly concluded arose in Grace Shipping Inc v CF Sharp & Co (Malaya) Pte Ltd [1986] SLR 32 . That case was an appeal from this court to the Privy Council. Lord Goff, in delivering judgment for the Board, stated as follows at p 36:
It was successfully argued by Sharp before the Court of Appeal that no agreement had been reached on four matters:
(1) Who would appoint the vessel`s agent at the loading and discharging ports.
(2) Holiday time.
(3) Arbitration and proper law.
(4) Nomination of the vessel for the first of the four shipments.
Of these four points, points (1), (2) and (4) were resolved in the course of argument before their Lordships,
The only point upon which, in the end, Mr Pollock [counsel for Sharp] placed any real reliance, was the matter of the arbitration clause
21.His Lordship then held at p 37 that, on the evidence, there was a concluded contract, notwithstanding that the arbitration clause had not been settled:
The Court of Appeal held that it was plain from these telexes, which came into existence after 5 February 1975, that the parties intended to agree on the place of arbitration and the law governing the contract but had overlooked these matters earlier; and therefore that, having failed to agree upon them on 5 February, there could be no binding agreement as at that date. Their Lordships are however unable to agree with this conclusion of the Court of Appeal. On the telexes which passed between Sharp and Polfracht Sydney [ship brokers for Grace], there was no mention whatsoever of the arbitration clause until the telex from Polfracht Sydney on 6 February quoted above. The point has to be judged at 5 February, the date upon which agreement is said by Grace to have been reached between the parties; and, in the opinion of their Lordships, the question whether the parties intended a binding contract to be dependent upon agreement being reached on the place of arbitration (and therefore upon the proper law) has to be ascertained from the communications passing between the parties through their brokers before and on that date. In the absence of any mention whatsoever of the arbitration clause by then, it is impossible to infer that the parties did intend that a binding contract was dependent upon filling in the gap in cl 14. That there was in fact no such intention is confirmed by the fact that a meeting took place for the signature of the contract at a time when, to the knowledge of both Sharp and Polfracht Sydney, no agreement had yet been reached on the place of arbitration; though logically this is of no relevance to the state of negotiations on 5 February. For these reasons, their Lordships are unable to accept the conclusion of the Court of Appeal on this point. It follows that they are satisfied that the judge was correct in holding that a complete agreement had been reached on all relevant points on 5 February, 1975, as indeed both Sharp and Polfracht Sydney thought at the time.
22.Next, there was the case of The Great Marine (No 2) [1990] 2 Lloyd`s Rep 250 which we think will greatly fortify the findings of the court below. There, the issue was also whether a binding agreement had been reached after an exchange of telex messages. The only difference in that case and the present one before us was that the contract there had no subjects nor was it expressed to be subject to details. Neither was the recap telex made subject to the signature of a memorandum of agreement on the NSF 87. In his judgment, Legatt J stated as follows at pp 253-254:
[B]y the time of the recap telex messages the parties were ad idem and having manifested an intention to create binding legal relations, an oral agreement had been reached between the brokers.
The fact that the terms of the standard form memorandum of agreement were incorporated into the contract did not prevent a binding agreement being reached, notwithstanding the fact that it was anticipated that the concluded contract would be drawn up and the standard terms amended so as to reflect the specific terms that had been agreed between the parties. The alterations subsequently made were undertaken merely to give effect (by amendment of the form agreed to be used) to the specific terms agreed between the parties, and to give effect to minor variations agreed between them after the date of the recap telex message. The matter is not affected by the fact that the first obligation to be performed was dependent on the signing of the memorandum of agreement, because the signing was not a condition precedent to the contract. Nor was cl 25 of the agreement, which required the sellers to furnish the buyers with specific documents in London in exchange for payment of the purchase price, a term upon the agreement of which the contract was conditional. The parties clearly envisaged that agreement on this term could be readily reached, as indeed it was; and the clause provided its own criteria for determining its precise content. [Emphasis is ours.]
23.Likewise, reverting to the instant appeal, the evidence here revealed that, once Humboldt had counter-proposed with the term that `Delivery of the vessel against presentation of delivery/documentation as reasonably required by buyers for change of flags/registration`, Zalco Marine made no further reference to the term concerning documentation in subsequent telex exchanges until the recap sent by its broker. No doubt, in the recap telex by Zalco Marine dated 29 February 1996, Zalco Marine had repeated its original condition that documentation upon delivery was to be to buyer`s requirement. However, in Humboldt`s recap telex of the same date, Humboldt altered this term and stated that documentation would be that which was `reasonably required`. This documentation term, which was what Humboldt proposed right from the beginning since 23 February 1996, was later incorporated into the draft MOA prepared by Humboldt`s brokers.
24.On 5 March 1996, Zalco Marine`s brokers responded as follows:
21 At the time of delivery the sellers are to hand to the buyers documentation which reasonably required by the buyers for transfer of title, change of flag and registration purposes. such documentation to be listed in addendum no 1 which attached hereto. [Emphasis is ours.]
25.In other words, it was apparent that both parties had agreed that documents were to be those which were `reasonably required`. The only outstanding matter was the list of documents which had yet to be specified.
26.Counsel for Zalco Marine sought to take issue with the fact that the list of documents was never agreed upon. This, he contended, showed that the parties had yet to conclude the contract. We cannot agree with this submission. On the evidence, there is no doubt that both parties were ad idem that the documentation was to be limited to what was `reasonably required.` The subsequent negotiations on the type of documents to furnish against delivery was therefore merely a detail to give effect to what the parties had already agreed upon. This being so, a contract existed between Zalco Marine and Humboldt, the breach of which permitted either party to sue upon.
27.We move on next to the question of compensation upon Zalco Marine`s repudiatory breach.
Issue of whether damages should be in the amount of the deposit
The decision below
28.On the question of Humboldt`s entitlement upon repudiatory breach by Zalco Marine, the learned Judicial Commissioner below concluded:
13.1 [T]he defendants [should read plaintiffs] had particularised their loss and damage specifically in their statement of claim and had equated it with the 10% of the purchase price which was the deposit payable to the plaintiffs being the sum of US$500,000. Following the principles set out in The Blankenstein which case I do not find distinguishable from the present case as urged, I can see no valid reason why damages as claimed by the plaintiffs could not be equal to the sum of the deposit which the plaintiffs could have forfeited from the defendants on their being found to be in breach of and in repudiation of their contract as has been so found. As in The Blankenstein case, the purpose of the deposit was to protect the plaintiffs against the event which in fact happened, namely the failure by the defendants to complete and take delivery of the ship and it mattered little if the amount of the forfeiture - here the deposit of US$500,000 - could be said to exceed the amount of general damages recoverable against the defendants. Further, support is shown for the above principles in the Indian Overseas Bank v Cheng Lai Geok [1993] 1 SLR 470 at p 478A where Chao Hick Tin J observed that where there was a fundamental term in a contract and there was breach a vendor would be entitled to sue for damages including the unpaid deposit . The same reasoning, in my opinion, would apply to the word `compensation` in the first part of cl 13 of the NSF 87.
14 In the circumstances, I made the order as to damages/compensation in the amount of the deposit claimed with interest at the rate of 12% per annum.
Compensation in the sum of the deposit
29.If there was a concluded contract, counsel for Zalco Marine did not dispute that the NSF 87 as modified would form the contractual terms. However, he contended that the learned judicial commissioner had failed to appreciate the case of The Blankenstein; Damon Compania Naviera SA v Hapag-Lloyd International SA [1985] 1 Lloyd`s Rep 93 when placed in the context of the present cl 13 of the NSF 87. And, in so failing, he did not find that cl 13 of the NSF 87 provided specifically that failure to pay the deposit would not result in damages amounting to the sum of the deposit, but would result merely in compensation to be assessed under the usual basis. The substratum of this argument really lies in the wording of cl 13 of the NSF 87. For completeness, the deposit clause (cl 2), the payment clause (cl 3) and cl 13 are set out below:
2 Deposit
As a security for the correct fulfillment of this contract, the buyers shall pay a deposit of 10% - ten per cent - of the purchase money within 3 (three) banking days from fax copies of this agreement being signed. This amount shall be deposited with ANZ Grindlays Bank plc and held by them in a joint account for the sellers and the buyers. Interest, if any, to be credited the buyers. Any fee charged for holding said deposit shall be borne equally by the sellers and the buyers.
3 Payment
The said purchase money shall be paid free of bank charges to ANZ Grindlays Bank plc on delivery of the vessel, but not later than three banking days after the vessel is ready for delivery and written or telexed notice thereof has been given to the buyers by the sellers.
13 Buyers` default
Should the deposit not be paid as aforesaid, the sellers have the right to cancel this contract and they shall be entitled to claim compensation for their losses and for all expenses incurred together with interest at the rate of 12% per annum.
Should the purchase money not be paid as aforesaid, the sellers have the right to cancel this contract, in which case the amount deposited together with interest earned, if any, shall be forfeited to the sellers. If the deposit does not cover the sellers` losses, they shall be entitled to claim further compensation for their losses and for all expenses together with interest at the rate of 12% per annum. [Emphasis is ours.]
30.It was strenuously argued that the difference in the two paragraphs in cl 13 (as italicised above in [para ] 29) was crucial for they were intended to provide different remedies depending on when the repudiatory breach took place.
31.The dissenting speech of Goff LJ in The Blankenstein which dealt with the old cl 13 under the NSF 66 was relied upon heavily by counsel for Zalco Marine. There, the deposit was payable only upon signature of the memorandum of agreement evidencing an already concluded contract, which obligation to sign was also broken by the buyers. Goff LJ stated at pp 106-107:
If the repudiation occurred after Damon had paid the deposit, the sellers would be safe: they would have the deposit and could keep it. If the repudiation occurred after the obligation to pay the deposit had accrued due, but before Damon had paid it, the sellers could sue Damon for the deposit as a debt; whether they could get it or not would depend on whether they could enforce that right, and in particular would depend on the solvency of Damon. But if the repudiation occurred before Damon`s obligation to pay the deposit had fallen due, then the sellers could only recover damages for the repudiation, which would fall to be assessed on the usual basis of compensating the sellers for the loss of their bargain. To assess those damages, it is necessary to compare what the sellers` position would have been if the contract had been performed, with the position as it was following the repudiation To award the sellers damages assessed on the basis of the amount of the deposit would be to compare their present position with what their position would have been if the contract had only been partially performed (ie, the deposit paid), and not with their position if the contract had been performed in full; if damages were assessed in that way, they would be over-compensated for the loss of their bargain. In truth, the inability of the sellers to obtain the protection of the deposit, in the circumstances of the present case, flows from their contracting on such terms that the deposit was not payable forthwith upon the making of the contract. [Emphasis is ours.]
32.The crux of Goff LJ`s objection was that, to allow the seller to recover the amount of the deposit as compensation would be tantamount to placing the seller in a position as if the contract had been partially performed (ie payment of deposit) and not with the seller`s position had the contract been fully performed, therefore resulting in over-compensation.
33.It was further contended by counsel for Zalco Marine that the entire first paragraph of cl 13 in the NSF 87 is notably absent in the same cl 13 of the NSF 66. This therefore suggested that the inclusion of the first paragraph in the NSF 87 was to make it clear that only the usual compensation as opposed to forfeiture of deposit was available where the deposit had not been paid. The rationale appears to be that prior to the payment of the deposit, the parties having freshly contracted the likelihood of any real loss would be minimal as market conditions were unlikely to alter so fast. Thus, the loss, if any, should be compensated on the usual basis. It was thus submitted that Humboldt in this case was only entitled to nominal damages.
34.On the other hand, counsel for Humboldt pointed out to us that the learned author in McGregor On Damages (1997 Ed) had noted as follows at p 545:
The arguments of Robert Goff LJ, dissenting, that so to hold would put the sellers in the position they would have been had the contract been not wholly but only partially performed is unconvincing; this effectively is the case wherever an unpaid deposit - or indeed in a sense wherever a sum of liquidated damages - is claimed upon breach.
35.It was further argued that Goff LJ`s conclusion meant that a contract-breaker is effectively better off by committing two breaches rather than one (ie by repudiating before the deposit is due and refusing to sign the MOA instead of simply refusing to sign the MOA, having paid the deposit): see Dewar v Mintoft [1912] 2 KB 373 in which Horridge J directed the jury that `the defendant could not put himself in a better position by a refusal to pay the deposit than if the deposit had in fact been paid, in which case it could be retained by the seller `
36.It is perhaps useful now to allude to the majority decision delivered by Fox LJ at p 102 which is crucial to this point about the deposit:
The postulated action in the present case, is not an action for failure to take delivery but an action on a particular term of the contract. That term, I suppose, had a practical use in that it required the terms of the contract to be recorded. But its principal, if not its only, legal consequence was that (on the construction which I have adopted) it was the event which obliged the purchaser to pay the deposit. Damages for breach of contract are a compensation for the loss which the plaintiff has suffered through the breach. Accordingly, the plaintiff is entitled to be placed in the same position as if the contractual obligation had been performed.
In the present case, if the obligation had been performed, Hapag-Lloyd [the seller] could have sued Damon [the buyer] in debt for the amount of the deposit and it seems to me that that should be reflected in the damages recoverable for breach of the obligation. The fact that Hapag-Lloyd would thus recover an amount of damages greater than the general loss of the bargain for sale does not seem to me to be a conclusive answer. The purpose of the deposit was to protect Hapag-Lloyd against the event which actually happened, namely the failure by Damon to complete. In that event Hapag-Lloyd was intended to have secured to it, by forfeiture of the deposit, an amount of money which could well exceed the amount of the general damages recoverable against the purchaser for failure to take delivery and pay the purchase price. Consequently to allow a claim for damages for failure to sign the memorandum, in an amount equal to the amount of the deposit does not seem to me to distort the intention of the parties but merely to place Hapag-Lloyd in the position which it would be in if Damon had complied with the obligation to sign the memorandum. [Emphasis is ours.]
37.The learned Lord Justice continued at pp 102-104:
The acceptance by Hapag-Lloyd of Damon`s repudiation, therefore, did not affect any rights to which it was entitled under the contract and which had already accrued. The right to damages for failure to sign the memorandum was, it seems to me, such a right. Thus, in my view there was a promise to sign the memorandum; upon signature by Damon the deposit was payable; and the deposit was forfeitable if the purchaser wrongfully failed to complete. I do not think that cl 13 does anything more than make it clear that prompt payment of the specified amounts of the purchase price upon delivery of each vessel is essential and failure will involve forfeiture of the deposit. But cl 13 does not, it seems to me, detract from cl 2 which states that the deposit is `security for the correct fulfilment of this contract`. That is in wide terms which are in no way restricted to the circumstances stated in cl 13 and are wholly in accord with the general purposes for which a deposit is given. It is, I think, a matter of necessary implication from the language of cl 2 that if the buyers were in default and refused to complete the contract the deposit might be forfeited. The agreement to forfeit may be implied as well as express . And it normally will be implied unless the contract as a whole shows an intention to exclude forfeiture. I would conclude that Hapag-Lloyd is entitled to recover the amount of the deposit by way of damages for breach of contract even though the amount of the deposit exceeds the amount of the general damages
It seems to me therefore that Hapag-Lloyd was at the time when they accepted the repudiation already entitled to a vested right to sue Damon for damages for breach of its obligation to sign the memorandum and that the measure of damages is the amount of the deposit. [Emphasis is ours.]
38.Stephenson LJ agreed with the observations of Fox LJ, although he conceded that he was attracted by the logic of Goff LJ`s contrary opinion. He stated at p 107 as follows:
[T]he measure of damages resulting from Damon`s repudiatory breach is, in my opinion, the loss directly and naturally resulting from the breach in the ordinary course of events, and I agree with Lord Justice Fox that that loss is the amount of the deposit which was not paid or payable in consequence of Damon`s wrongful refusal to sign the contract. It seems to me unreal and unfair to the sellers to exclude the deposit from the court`s estimate of their loss.
39.In our view, the gravamen of the matter is to decide how `compensation` under the first paragraph in cl 13 of the NSF 87 should be assessed. We think that the generic term `compensation` simply refers to the measure of damages which the seller would recover under the law. To this extent, the question remains whether forfeiture or damages in the sum of the deposit could properly reflect the appropriate measure of compensation due to the seller upon breach of the contract in question.
40.The above reasoning of Fox LJ which was accepted by Stephenson LJ, it seems to us, depended on an implied agreement between the parties that where the buyer breached the contract even before the deposit was due, then an amount in the sum of the deposit would be payable or forfeitable as general damages . Such a construction was said to be in accord with cl 2 of the NSF 66 used in The Blankenstein which stated that,
[a]s security for the correct fulfilment of this contract the buyers shall pay a deposit of 10% of the purchase money on signing this contract
Hence it was possible to imply from cl 2 that if the buyers did not complete the sale, the deposit might be forfeited or payable as damages, such forfeiture or payment to apply even if the memorandum was not signed and hence no deposit was payable yet.
41.Clause 13 of the NSF`66 merely stated that,
[s]hould the purchase money not be paid as per cl 16 [which provided for payment of specified sums on the delivery of each ship] the sellers shall have the right to cancel this contract in which case the amount deposited shall be forfeited to the sellers.
This did not alter the complexion of such an implied agreement. Hence, where buyers had failed to pay the deposit (or purchase money), and sellers later accepted the buyers` repudiation of the contract, the sellers were entitled to recover damages equivalent to the amount of the deposit because of this implied agreement, even though the amount exceeded the general damages for compensation.
42.Similarly, after an examination of the authorities, Chao Hick Tin J in Indian Overseas Bank v Cheng Lai Geok [1993] 1 SLR 470 stated as follows at p 479:
The moment the respondent successfully bid at the auction and signed the written agreement, a firm contract has come into being. By not paying the deposit, the respondent was in breach of a fundamental term of the contract entitling the appellants to treat the contract as discharged and to sue for damages, including the unpaid deposit.
Again, forfeiture of the deposit as part of damages was permissible because it seems to us to be implied that the parties had agreed that an amount in the sum of the deposit might be forfeited upon breach of a fundamental term of the contract. And failure to pay the deposit was in itself such a breach. Therefore, the deposit was recoverable as damages, the only prohibition being that the amount to be forfeited must not be in the nature of a penalty. This was why Chao Hick Tin J went on to confirm the nature of the deposit and its forfeiture as a form of liquidated damages and found that, in the case, the forfeiture of the deposit did not amount to a penalty.
43.We are no doubt mindful that the learned author in Goldrein on Ship Sale and Purchase (2nd Ed, 1993) had submitted that `[d]espite this difference [in cl 13] between NSF 66 and NSF 87, the judgments of Fox and Stephenson LJJ in The Blankenstein are applicable to a contract incorporating lines 119 to 121 of NSF 87 [ie the new first para in cl 13].`
44.However, with respect, we do not agree with him. In our view, due to the wording of the NSF 87, it cannot be implied that the parties had agreed to forfeiture or payment in the sum of the deposit as part of general damages for breach of the contract before the deposit is payable. We recognise that cl 2 still retains the old formula that the deposit is ` a security for the correct fulfillment of this contract `. However, the first paragraph in cl 13 of NSF 87 makes its clear that,
should the deposit not be paid as aforesaid, the sellers have the right to cancel this contract, and they shall be entitled to claim compensation for their losses and for all expenses incurred together with interest at the rate of 12% per annum.
45.In other words, the parties had plainly contracted that `compensation` (as opposed to the more precise forfeiture of the deposit in the second paragraph) would be the relevant consequence if the deposit was not paid according to cl 2. The compensatory exercise under the first paragraph in cl 13 is to ascertain the direct and natural loss, and this loss cannot automatically be equated with the amount of the deposit simply because the contracting parties had not provided for it to be such, nor can it be implied. The reference to `compensation` would not be required if forfeiture of the deposit was the intended consequence under the first paragraph. Hence, the first paragraph rendered it obvious that there is a difference between whether the breach took place before or after the payment of the deposit is due since it spells out a different consequence as compared to the second paragraph. This must be the construction given to cl 13 under the NSF 87. Otherwise, the first paragraph in cl 13 will be otiose, and there will be no practical difference between cl 13 of the NSF 66 and NSF 87.
46.Unlike the case of The Blankenstein which concerned the NSF 66, it is not possible on the wording of the NSF 87 to imply an agreement to forfeit or pay the sum of the deposit as general damages upon failure to complete the contract, where the breach occurs before payment of the deposit. To this extent, under cl 13 of the NSF 87, it is clear that before the deposit has accrued due, damages are to be based on the usual compensatory principles; the right to forfeit the deposit only accrues after payment of the deposit is due.
47.In any case, we think that the insertion of the first paragraph in cl 13 does not prejudice the seller who is still protected in damages to be assessed on the usual basis should losses be suffered and expenses incurred. And, if the seller is unable to claim compensation in the sum of the deposit, it is not a matter of allowing a contract-breaker to escape with lesser consequences by breaching his obligations twice. Rather, it is because the parties have not contracted for the deposit to be payable forthwith from the moment of agreement, or that they have not contracted that forfeiture or payment in the sum of the deposit was the consequence for breach of the contract before the deposit is due. Hence, in this instance, we readily adopt Goff LJ`s analysis which we think is more consonant with the wording of the NSF 87.
48.Apart from the claim for the deposit, Humboldt did not particularise any other losses it suffered. Since Zalco Marine is successful in showing that Humboldt is not entitled to compensation in the amount of the deposit, this part of the appeal is allowed. However, we will grant leave to Humboldt to establish whether they have suffered any actual losses based on the usual compensatory principles.
49. Conclusion
For the foregoing reasons, this appeal is allowed in part. Zalco Marine has failed on the issue of whether there was a concluded contract and succeeded on the compensation issue. In the court below they failed on both issues. The learned judicial commissioner ordered that Zalco Marine pay the amount of the deposit by way of damages. We have varied that order to provide for a reference to the Registrar for the assessment of compensation on the usual basis for compensating the sellers for the loss of their bargain and for all expenses incurred and for the same to be paid to Humboldt together with interest at the rate of 12% per annum. In all other respects the order of the learned judicial commissioner is to stand. Accordingly, the appellants, Zalco Marine, shall be entitled to half the costs of the appeal. We so order. The security deposit for the appeal shall be refunded to the appellants.
Goh Joon Seng J Karthigesu JA L P Thean JA |
N Sreenivasan and Valerie Ang (Derrick Ravi & Partners) for the appellants
Richard Kuek and Tan Siew Tiong (Gurbani & Co) for the respondents