Prophecy Asia (Singapore) Pte Ltd v MCSB Systems (S) Pte Ltd and Another
[1998] SGHC 176
Suit 1226/1996
Goh Joon Seng J; Lai Kew Chai J; L P Thean JA
21 May 1998
Judgment:
Cur Adv Vult
Introduction
The plaintiffs were at all material times in the business of inter alia developing computer software and they have the exclusive right to licence the use of the computer software known as "Prophecy" ("the software") which is an INGRESS based financial accounting software package for medium to large business organisations. The first defendants are a member of a group of companies, headed by a Malaysian public listed company known as MCSB Systems (M) Berhad ("MCSB Malaysia"). This group of companies sold hardware and software. The second defendant ("Mr Leong") was at all material times the Chief Technology Officer of the first defendants. One of his duties was to evaluate and supervise the introduction and sale of new products to complement the products which the first defendants could sell. The CEO of the first defendants is Mr Paul Lim.
2 On 18 January 1996 the plaintiffs' Mr Slattery and the first defendants' Mr Leong signed a Business Partner Prophecy Agreement ("the agreement") which covered Singapore. A separate agreement for the territory of Malaysia was signed between the plaintiffs and Mr Leong on behalf of MCSB Malaysia. Under both agreements the plaintiffs granted to the first defendants and MCSB Malaysia non-exclusive rights in Singapore and Malaysia respectively to enable them to inter alia market the software, to grant non-exclusive sub-licences for the software to users including the source programs of the software. For an annual maintenance fee the first defendants and MCSB Malaysia were licensed to use the software free of any licence fee for the purposes of running their own accounting operations.
3.1 The plaintiffs claim the sum of $92,700 being one year's annual Internal Use and the costs of the Initial Starter Pack, inclusive of GST. The plaintiffs further claim the sum of $172,500 for loss and damage based on one sale per year which would have generated $100,000 in licence fees per year for three years which was the duration of both the agreements. If Mr Leong did not have the authority of the first defendants to sign the agreement, the plaintiffs claim from him those sums as damages for his breach of the warranty of authority.
3.2 Central to the defendants case was their assertion that it was agreed between Mr Slattery, the Managing Director of the plaintiffs and Mr Leong that both the agreements though signed were not to take effect until the happening of three conditions precedent, namely, (a) the Prophecy software must work on the CHEN Systems Server; (b) the plaintiffs must issue the first defendants and the MCSB Malaysia group of companies with a letter allowing them to distribute Prophecy Open without additional charge; and (c) the first defendants' Board of Directors must give its approval.
3.3 It is the defendants' case that none of the events had happened and that there can be no claims under the agreement. The first defendants further allege that the plaintiffs had failed to make the software work on the CHEN Systems Server and had failed to issue the letter. They therefore counterclaim for damages for lost opportunity to market the software and/or Prophecy Open, for the costs incurred in engaging a software engineer to evaluate the software put at $31,998 and the value of machine time spent to evaluate the software which was estimated at $30,000.
4 Both parties invited me to deal with the question of liability in the first instance. The assessment of damages, depending on liability, would be undertaken later. I therefore deal only with the issue of liability.
The admissibility of defendants' evidence
5.1 Initially, there was some dispute about the admissibility of the defendants' evidence. Since the two agreements were signed, it was thought that no evidence could be admitted to "contradict" or "vary" the terms thereof. I agree with the defendants' submission that their evidence could be received under proviso (c) of s 94 of the Evidence Act, Cap. 97 (1997) Ed. The relevant parts of the section and the proviso read as follows:
"When the terms of any such contract...have been proved according to section 93, no evidence of any oral agreement...shall be admitted as between the parties to any such instrument...for the purpose of contradicting, varying, adding to, or subtracting from its terms subject to the following provisions:
..... (c) the existence of any separate oral agreement constituting a condition precedent to the attaching of any obligation under any such contract..., may be proved;" (Italics added)
5.2 Illustration (j) clarifies it further. It says this: "A and B make a contract in writing to take effect upon the happening of a certain contingency. The writing is left with B, who sues upon it. A may show the circumstances under which it was delivered."
5.3 At common law, the law of evidence did not exclude oral evidence to the effect that there was no agreement although a written agreement had been signed. This was eminently a matter of common sense and, in principle, the principle of upholding a person's signature must yield to the superior principle that evidence, oral or documentary, should be admitted to challenge the very existence of the agreement, evidenced in the document in which the signature appeared. Oral evidence, therefore, was admissible to show that a document executed by a party was never intended to be acted upon as an agreement until the happening of an event: Pym v Campbell, 6 E&B 370. In that case there was a written agreement to buy from the plaintiff three eighth parts of the benefits of an invention. The seller's claims against the buyers failed. The buyers were allowed by the trial judge, Lord Campbell CJ sitting at Guildhall, to lead evidence that the agreement in writing was conditional upon the approval of an engineer. The jury found that the engineer did not approve. The seller obtained a rule nisi for a new trial on the ground of misdirection. The rule nisi was discharged by the King's Bench Division. Lord Campbell CJ moved rapidly. The appellate court heard arguments on Saturday, 3rd May 1856 and delivered judgment on the following Monday. Obviously, this was because an important principle was at stake.
5.4 Lord Campbell CJ sitting in the King's Bench Division as well said at p 375:
"No addition to or variation from the terms of a written contract can be made by parol: but in this case the defence was that there never was any agreement entered into. Evidence to that effect was admissible; and the evidence given in this case was overwhelming. It was proved in the most satisfactory manner that before the paper was signed, it was explained to the plaintiff that the defendants did not intend the paper to be an agreement till A had been consulted and found to approve of the invention; and that the paper was signed before he was seen only because it was not convenient for the defendants to remain. The plaintiff assented to this, and received the writing on those terms. That being proved, there was no agreement."
5.5 Lord Erle said earlier at p 373:-
"The point made is that there is a written agreement absolute on the face of it, and that evidence was admitted to show that it was conditional; and if that had been so it would have been wrong. But I am of opinion that the evidence showed that in fact there was never any agreement at all. The production of a paper purporting to be an agreement by a party with his signature attached, affords a strong presumption that it is his written agreement; and, if in fact he did sign the paper animo contrahendi, the terms contained in it are conclusive and cannot be varied by parol evidence ..... but, if it be proved that in fact the paper was signed with the express intention that it should not be an agreement, the other party cannot fix it as an agreement upon those so signing. The distinction in point of law is that evidence to vary the terms of an agreement in writing is not admissible, but evidence to show that there is not an agreement at all is admissible."
5.6 The then Indian Legislature gave effect to the decision in Pym v Campbell in proviso 3 to section 92. That proviso and section are in pari materia with paragraph (c) of section 94 of our Evidence Act.
5.7 A contract may contain terms which are conditions as opposed to warranties. A conditional clause, in terms of its nature and effect as a matter of law, may be a condition precedent or condition subsequent. In the context of considering the admissibility of the alleged three conditions precedent, it is essential to remind ourselves of the distinction between the two. If the clause is a condition precedent, there is no contract until the condition is fulfilled; if subsequent, there is a contract until it may unscrambled by the happening of an event stated in it. The former goes to the formation of the contract; the latter goes to the performance of a contract which has been formed.
The background & facts
6 The plaintiffs, a Singapore company, is within the Prophecy group of companies based in Adelaide, South Australia. The group has been involved with computer application package development and support. The group as of October 1997 had invested 75 person years into the design of the software and Mr Slattery claimed that it is one of the world's leading software development houses. The group operates through authorised distributors which market and support the software in over 30 countries around the world.
7 The Prophecy group has over 800 sites worldwide and is acclaimed by its software partners Computer Associates who develop INGRESS with which the software interacts. INGRESS is a database platform product which the software is written in and sits on. A client therefore would store its data into the INGRESS database resulting from transactions processed by the software. I was told that Computer Associates, the third largest software organisation in the world, recognises the software as the leading financial software product worldwide on the INGRESS database platform.
8 In the last quarter of 1995 there was a confluence of important events in the corporate development of the plaintiffs and the group of the first defendants. The plaintiffs were looking to develop their market in Singapore and Malaysia; in particular, Mr Slattery was searching for a suitable distributor in Singapore. The MCSB group of companies had invested about US$10 million into the CHEN Systems Server. It was launched on or about 1 October 1995. Upon being launched, it immediately won two international awards. Unfortunately, the MCSB group did not have any commercial software application which could run on the CHEN Systems Server which was the hardware. The backdrop therefore was that the MCSB group was just as keen to buy the software as the plaintiffs were to sell it. As is well-known, hardware without software is useless. At the same time, the MCSB group was looking for a very high end accounting/financial software for their own use, quite apart from selling the software to customers who needed various programmes offered by the plaintiffs as described in their brochure, Prophecy Introduction.
9.1 In the plaintiffs' search for a distributor, Mr Slattery on or about 6 September 1995 first met Mr Freddie Au who was at that time Sales Manager for MCSB Malaysia. He introduced the plaintiffs' product through the brochure known as "Prophecy Introduction".
9.2 From the very first meeting, Mr Slattery and Mr Leong discussed both (a) the plaintiffs' software, Prophecy Classic; and (b) the plaintiffs' proposed software, Prophecy Open. Mr Slattery briefed Mr Leong on Prophecy Classic and stated that the plaintiffs proposed to introduce Prophecy Open in April 1996. In fact, Ms Cindy Tan Lay Bi, the former Regional Support Consultant of the plaintiffs, told the court that the plaintiffs at all material times were giving a preview of Prophecy Open.
9.3 Mr Slattery showed Mr Leong the document entitled "Prophecy Introduction" to explain what Prophecy Classic could do. He said that Prophecy Open would have the following features. First, it would be a state-of-the-art accounting software designed and developed based entirely on Object Oriented Technologies. Objects are software which are written in such a way as to make them easily reusable by other programs. Second, they are also easier to customise and modify. This would be in contrast with traditional software which consists of a long string of sequential instructions which are difficult to customise or modify. The Prophecy group expected that Prophecy Open, being based entirely on technology oriented towards objects would put it at least a generation ahead of competitors like Oracle Finance. Mr Leong said he was told that it would allow users to customise input screens and logic flows without having to write any programming code.
9.4 Mr Slattery also told Mr Leong that Prophecy Open wold also have full Windows capability as compared with Prophecy Classic which was actually a Windows emulation. Unlike Prophecy Classic, where users had to use INGRESS as the database, Prophecy Open would allow users to choose any SQL database such as Oracle, Informix, INGRESS and Microsoft SQL. SQL is a technique of organising a database into rows and columns.
9.5 I was satisfied that Mr Slattery expressly told Mr Leong that he wanted the first defendants to sell Prophecy Open when it became available. Mr Leong was very keen as it would give the first defendants a distinct advantage in selling CHEN Systems. To give substance to their proposed sale of Prophecy Open on the CHEN Systems Server as "a complete solution" to the computerisation of customers' accounting and management, the MCSB group was also keen to operate Prophecy Open on the CHEN Systems Server as a complete solution to their corporate needs.
9.6 Anticipating the launch of Prophecy Open, Mr Leong and Mr Slattery decided to port and link Prophecy Classic on the CHEN Systems Server, a process which they knew would take some time.
10 On 3 November 1995 Mr Leong sent his first fax (AB2) to Mr Slattery. He stated that his Board of Directors had met and they had decided to pursue a business partnership with the plaintiffs "pending the result of porting and testing of Prophecy on our CHEN Systems."
11 Mr Aruna Kodikara, who was the plaintiffs' Technical Consultant, undertook the task of porting and testing the software onto the CHEN Systems Server. The idea was to prove that Prophecy as a financial software would be a compatible, productive and complimentary solution in the CHEN Systems environment. He commenced porting and testing on 6 November 1995. Porting is transferring a piece of software from one system to another. Here, it was a transfer from the SUN to the CHEN Systems. The process of "porting" involved three basic steps: (1) installation of the database, INGRESS; and (2) copying of the source code to the system.; and (3) complete the compilation. During porting Mr Aruna encountered problems "throughout". He reported the problems to Mr Raymond Ong of the first defendants, the Head Office in Australia and even to Computer Associates, the suppliers of INGRESS. Primarily he reported to Mr Slattery.
12 Mr Aruna candidly told me and I accepted that not all the modules listed in the plaintiffs' brochure Prophecy Introduction were installed.
13 After more than 5 weeks of porting and testing, there was a demonstration of the software on the CHEN Systems Server. But it turned out that many modules did not work at all.
14 The next demonstration was the second and last demonstration. It took place on 29 December 1995. I am not referring to the recent demonstrations which I ordered and which took place in February and March 1998. In view of Mr Aruna's evidence, I was not surprised and I find, as Mr Leong asserted and contrary to what Mr Slattery asserted before the demonstrations ordered by me, that the following modules were not working:
(1) Reporting not working
(2) Queries (enquiry feature) not working
(3) Billing (Billing & Audit) not working
(4) Order Entry & Invoicing
(stock allocation) not working
(5) Inventory not working
(6) Purchase Requisitions not working
(7) Accounts Receivables not working
(8) Sales & Profits reporting not working
(9) Accounts Payable &
Purchasing not working
(10) Project Control not working
(11) Bank reconciliation not working
(12) Payroll & Personnel not working
(13) Assets (reports) not working
(14) Plant (History & Maintenance) not working
(15) Budget (reports) not working
15.1 On the evidence, it was clear that after 29 December 1995 Mr Aruna went back to the premises of the first defendants and did further compilation and linking on the CHEN Systems Server. As will be seen later, even these visits did not complete the porting and linking work. Not all the modules were linked. Because of the compilation and linking work done by Mr Aruna, there were fewer modules which were not working. Mr Leong had alleged that the above 15 modules were not working. He had recorded the modules on a rough working paper which he put aside or threw away after noting them formally in his affidavit evidence. The fact that Mr Aruna went back and did further work explained the difference in the number of modules which were found not working after the two court demonstrations and the list of modules Mr Leong first set out in his affidavit evidence-in-chief.
15.2 The second demonstration for the assistance of the court in its evaluation of the evidence was held in February 1998. A Unixware expert was brought in. He changed six Unixware Kernel Parameters. At the second demonstration, it was found that three modules, namely the Purchase Requisitions, Payroll and Personnel and Plant (History and Maintenance), were not working. Further, the Health and Safety module was missing altogether.
16 In the first weeks of 1996, whilst the porting and linking exercises were going on, both parties were at the same time looking for buyers of the modules in the software. Obviously, at that point of time they were moving forward with enthusiasm. On 16 January 1996 they arranged and carried out in Penang, Malaysia, a demonstration each to the Majlis Perbandran Pulau Pinang ("MPPP"), the local authority in Penang, and to a company known as Hunza Land. As recorded in the plaintiffs' fax of 15 January 1996, Mr Slattery conducted a presentation of the following topics to the MCSB staff in Penang: (1) What is Prophecy, (2) Prophecy Market, and (3) Prophecy Open.
17.1 On 18 January 1996 at about 3 pm Mr Slattery met Mr Leong at the office of the first defendants at Little Road, Singapore. They were alone. They discussed the territories, which were reduced to Singapore and Malaysia, the Starter Pack fee of $50,000 and the Annual Maintenance Fee of $40,000 for the internal use of the software by both the first defendants and MCSB Malaysia.
17.2 After the discussion Mr Slattery asked Mr Leong to sign the two agreements. Mr Leong told him that he did not have the first defendants' Board of Directors' approval. He also told Mr Slattery that he was not allowed to sign the two agreements without the approval of the Board because of the amount involved. Mr Leong reminded Mr Slattery that in any case the first defendants were interested in Prophecy Open.
17.3 Mr Slattery was "very, very insistent" and pressed Mr Leong to sign the two agreements to show some form of commitment. By that time, the plaintiffs had been engaged in marketing their product to the first defendants and MCSB Malaysia for about three months. Mr Slattery assured Mr Leong that he could go ahead and sign subject to the first defendants' Board of Directors' approval and that he would amend the two agreements to reflect Prophecy Open and not Prophecy Classic when the latter became available. Mr Leong in evidence elaborated on the mode of the amendment. Mr Slattery was to write a letter to the first defendants and, of course, MCSB Malaysia to the effect that the two agreements included Prophecy Open when launched without any further charge to the first defendants. At that point in time, it was a matter of three months, give or take, before Prophecy Open would be launched.
18 Two agreements were signed between the plaintiffs on the one hand and Mr Leong on behalf of the first defendants and MCSB Malaysia on the other. Obviously, in the absence of convincing evidence to the contrary, what is agreed and signed in writing must be given effect as a matter of contract. Indeed, the provisions of ss 93 & 94 of the Evidence Act stipulate that "no evidence of any oral agreement or statement shall be admitted as between the parties to any (such contract)...for the purpose of contradicting, varying, adding to, or subtracting from its terms..". But it has to be noted that in this case the first defendants are invoking the proviso under s 94(c) under which they seek to prove that there were agreed between the plaintiffs and the first defendants three conditions precedent to the formation of the agreement (AB51-74) under which the plaintiffs are suing. But more of the law on this aspect later.
19 Subject to what is noted above, I would mention some of the terms of the agreement, other than the operative terms which have been referred to earlier. By cl 1.2 the agreement shall commence on the date "hereof": the date on the agreement was not written. But the signatories, Mr Slattery and Mr Leong, put down the date "18/1/96" below their signatures. Under cl 6.1 the plaintiffs agreed that it would "do all things and take all necessary steps at its own cost to remove all Program Errors." By cl 20.1 it was provided that the agreement "sets forth the entire agreement and understanding of the parties relating to the subject matter (therein) and supersedes all other discussions, agreements or representations made by or between the parties (therein). No modifications of or enhancements to this Agreement or any waiver of rights under this Agreement shall be effective unless in writing and signed by both parties."
20 On 2 February 1996 the plaintiffs requested for payment of $92,700, which included GST of $2,700. Mr Slattery in the letter claimed that the plaintiffs had supplied and installed the software and the first defendants already had the software running on the CHEN Systems Server. That statement did not accord with the facts.
21.1 On 3 February 1996 Mr Leong faxed Mr Slattery. In polite terms, Mr Leong started by saying that he understood Mr Slattery's eagerness in getting the payment from the defendants. He said he wanted to explain "what has been going on in MCSB". I would like to quote the following material passage:
"When I signed the contract with you, I mentioned that I was doing this basing entirely on my own initiative. As all directors are travelling most of the time, it is very difficult to have a meeting with all of them. You also requested that we have to show some form of commitment. After working with you for the last few months, I felt that we have a good synergy in working together. You are aggressive and so are we. At the point of signing the contract, I am fairly confident that I can persuade all the other directors to go ahead and do business with Prophecy. I believe I have brought this point clearly to you.
Our board of directors met for the last few days. We discussed the business opportunity with Prophecy in length. The board took a longer time than expected because Prophecy (or other software) forms one of our core strategy for 1996. Finally, the board has agreed pending one final demonstration of the software to our three financial controllers this morning."
21.2 Mr Leong concluded the letter by saying that to wrap up the matter, he was arranging for Mr Slattery to meet Mr Paul Lim on 6 February 1996 at 3 pm.
21.3 Mr Slattery did not give any rebuttal reply; this to me was very significant. He struck me as a man who was a very good salesman. He was also as tough as his nails. He was not the sort of person who would let any contrary assertion to pass without an immediate rebuttal.
22 After the two agreements were signed, Mr Slattery refused to discuss any further any of the problems in connection with the porting of the software into the CHEN Systems Server. Mr Leong phoned Mr Slattery a few times. The latter said that he could turn up to discuss the problems provided the first defendants paid up $90,000 first. Mr Slattery asserted that the plaintiffs had done enough already and that his Australian partners were getting very impatient because the $90,000 was not paid.
23.1 The impasse led to a series of meetings and correspondence between Mr Slattery and Paul Lim, the CEO of the MCSB group. They negotiated but it ended in a stalemate. The MCSB group was very keen to work with the plaintiffs. But Mr Slattery, in my view, turned too tough after Mr Leong had signed the two agreements. Admittedly, he had invested a lot of man hours and resources and had not been paid. He was mistaken to think that he already had in hand two agreements binding on the first defendants and MCSB Malaysia. As will be explained, they were not binding until the fulfilment of the three conditions precedent to the formation of the two agreements.
23.2 I refer to another "arrangement" reached between Mr Slattery and Mr Paul Lim for their respective principals, as evidenced in the plaintiffs' letter of 8 March 1996 which both Mr Slattery and Mr Paul Lim signed. I used the word "arrangement" advisedly. It was agreed that the first defendants would issue the plaintiffs the cheque for $45,000 but Mr Slattery was to complete the porting and render the software working on the CHEN Systems Server. The cheque was signed by Mr Paul Lim but because Mr Slattery refused to do one further jot of work until the plaintiffs were paid, the attempt to resolve the differences between the plaintiffs and the first defendants again failed. This little chapter in the history of their relationship has but peripheral relevance, since the plaintiffs' claims are not founded on any agreement of 8 March 1996.
24 At the early stage of the trial, it became clear that an assessor with the necessary expertise had to be appointed. The assessor appointed was of great assistance and he advised that since the software was still retained by the first defendants it could be accessed and a demonstration could be conducted. The results of a demonstration would reliably establish if all the modules were ported and linked to the CHEN Systems Server. The plaintiffs resisted a demonstration, contending that the burden was on the first defendants to show that the modules in the software was not ported and linked. But Mr Slattery in his affidavit evidence-in-chief had affirmed that in a demonstration the software was "working completely and fully successful on the CHEN Systems."
25 One of the conditions precedent to the binding effect of the two agreements alleged was that the software must work on the CHEN Systems Server. Instead of hearing voluminous oral evidence, I thought it better to rely on "hard" and objective evidence. A lot of time would be saved. Accordingly, a demonstration was ordered.
26 As stated earlier, two demonstrations were conducted for the court's assessment. The results have been set out above.
27 I turn to the material facts which I have found on the evidence. I will elaborate further and bring the strands together. I found Mr Leong highly credible and forthright as a witness regarding his oral agreement with Mr Slattery about the three conditions precedent. His facility of the English language might not compare to Mr Slattery's command of English. But that was to be expected. English after all is not Mr Leong's mother tongue. He was also not as prolific a writer as Mr Slattery.
28.1 First, on the issue whether the software was working on CHEN Systems Server. Mr Leong did not write anything about the problems of porting. Technically, he did not know much about porting or linking. The reason was simple. As he explained in the witness box, he was confident that given the will and reasonable amount of resources, it was to him as a technical man a matter of time that the problems of porting could and would be overcome. I accept his evidence that there was an oral agreement between him and Mr Slattery that the software would be completely ported on the CHEN Systems Server and that, in time, Prophecy Open would be added as well. There was no doubt that at all material times linking of the modules to the CHEN Systems Server was problematic.
28.2 Mr Slattery's evidence had shifted, very subtly but noticeably at crucial points. For example, he unreservedly affirmed in his affidavit in October 1997 that on 29 December 1995 the demonstration of the PROPHECY showed that the software was "working completely and fully successfully on the CHEN Systems." The tests which I ordered in court and which took place in February and March 1998 ineluctably drove Mr Slattery to revise his evidence. He told me and the court's assessor for the first time after the first tests in February 1998 that only a "cross-section" of the software was compiled and linked or that only a "partial port" of the said software was carried out: see paras 23 and 24 of the Assessor's Report. I found that revision told much against Mr Slattery in the light of the fact that it was the plaintiffs' case from the beginning that everything worked. Even after the second tests in March this year, following the change by a Unixware expert to 6 Unixware kernel parameters, the modules which were found not working were the Purchase Requisitions, Payroll and Personnel and Plant (History and Maintenance). The last module was required by customers of the first defendants who wanted to monitor their plants in their factories. In addition, the Health and Safety module was missing altogether. One need hardly say that the first defendants were very keen as a potential distributor that the entire range of modules were available for sale. It was less likely that Mr Leong would have agreed to the two agreements taking effect without assurance that all modules would be properly ported and linked and working completely on the CHEN Systems Server.
29 Next, I consider further the issue whether the deal between the parties included Prophecy Open. The negotiations hinged very much on the plaintiffs' agreement to provide the first defendants in April 1996 with the new software Prophecy Open with no additional charge. According to the plaintiffs' own Prophecy Business Plan (AB236-287), it was stated:
"While the current Prophecy/Ingress solution remains a highly marketable and desirable business solution Prophecy Asia wishes to also establish and prepare the Asian market for Prophecy Open as the natural progression for existing Prophecy customers. Prophecy Open will be the first commercially available object oriented (OO) business solution and therefore presents a significant business opportunity for entrepreneurial solution providers who can demonstrate the drive, commitment and ability to reach the top with this much applauded technology.
With Prophecy and Prophecy Open we bring to the market significant business solutions with a current and continued research and development fund of $20M."
30 Prophecy Open is shown in the plaintiffs' plan to be able to operate on INGRESS, Oracle, Sybase, DBL, Informix and SQL Server. The software could only operate on INGRESS. At page 255 of the Business Plan, Prophecy Open was described as "Replacement showcase product under development in Open Road-full object oriented and multi-database." (emphasis added). At page 271 the plaintiffs promised to undertake modifications to the software.
31 Finally, regarding the Board of Directors' approval, Mr Leong wrote when it really mattered. What he did write was decidedly more consistent with his version of what had been agreed between him and Mr Slattery: see his second and last fax of 3 February 1996 to Mr Slattery, which was only his second and last fax on what had verbally transpired between the two of them. That fax referred to the approval of the Board of Directors. I was satisfied that Mr Slattery knew for a fact that Mr Leong did not have the authority to enter into the two agreements on behalf of the first defendants and MCSB Malaysia. There was no question of Mr Leong warranting to him, either expressly or by necessary implication, that he had authority to bind the first defendants and MCSB Malaysia. He in fact told Mr Slattery he did not have the authority.
32 Upon a consideration of the entire evidence, I am satisfied and I find that in fact Mr Leong and Mr Slattery had on behalf of their respective principals agreed to the three conditions procedent. Those conditions precedent did not take place and in accordance with the intention of both the plaintiffs and the first defendants, the two agreements therefore did not take effect.
33 Accordingly, the plaintiffs' claims against both defendants are dismissed with costs. Mr Leong should be indemnified his full solicitor and client's costs. He was unnecessarily dragged into this piece of litigation. Interlocutory Judgment is entered in favour of the first defendants against the plaintiffs with costs. The damages payable by the plaintiffs to the first defendants are to be assessed by the Registrar.
Sgd:
Lai Kew Chai J
Judge
Singapore,
Goh Joon Seng J Lai Kew Chai J L P Thean JA |
Khush Chopra [Khush Chopra] for the plaintiffs
Philip Lam [Foo & Liew] for the defendants