In the High Court of the Republic of Singapore
[1998] SGHC 25
OS No 331 of 1997
Between
Ard Co Pte Ltd (formely known as Pan-Electric Appliances (Pte) Ltd)
… Plaintiff
And
Lionapex Equipment Pte Ltd (formerly known as Lionapex Trading Co Pte Ltd)
… Defendant
grounds of decision

This judgment is subject to final editorial corrections approved by the court and/or redaction pursuant to the publisher’s duty in compliance with the law, for publication in LawNet and/or the Singapore Law Reports.
Ard Co Pte Ltd (formely known as Pan-Electric Appliances (Pte) Ltd) v Lionapex Equipment Pte Ltd (formerly known as Lionapex Trading Co Pte Ltd)
[1998] SGHC 25
OS No 331 of 1997
Chan Seng Onn JC
23 January 1998
Judgment :
GROUNDS OF DECISION
The sole question for determination in this originating summons is the proper construction of a settlement agreement contained in an exchange of letters between the plaintiffs and the defendants on 24 February 1997. The central issue concerned the sum of S$237,000 paid by the plaintiffs to the defendants.
Background
2 By an agreement dated 7 February 1995, the plaintiffs agreed to purchase 30 timber drying kilns from the defendants for S$2,370,000 CIF Russia Main Port. The price was inclusive of delivery and installation of the kilns in Russia. Delivery was to be in 2 batches of 15 kilns each.
3 It is not disputed that the contract price was S$1,185,000 for each batch of 15 kilns. The unit price inclusive of delivery and installation was therefore S$79,000.
4 On 20 February 1995, the plaintiffs paid the defendants S$237,000, being the 20% non-refundable downpayment for 15 kilns. This payment was made as required under Clause 3.1 of the agreement.
5 The 1st batch of 15 kilns was delivered. However, disputes arose concerning the delayed delivery of the 2nd batch.
6 On 6 August 1996, the defendants wrote to the plaintiffs setting out the outstanding accounts to be settled between them as follows:-
"We write to confirm our understanding that you have agreed to make the following settlement:-
1. Outstanding Accounts
The sum of S$209,316.00 as per our Statement of Account as at 31 July 1996 (copy attached) will be paid to us prior to or by 31 August 1996 latest.
2. Remaining 15 units of KDs
(a) You will also pay us the sum of S$200,000.00 being partial settlement for the remaining 15 units of KDs by 30 September 1996.
(b) The final settlement sum of S$748,000.00 shall be paid to us prior to or by 31 December 1996 worked out as follows:-
Contract Price for remaining 15 units of KDsLess:- 20% Deposit paid Less:- Partial settlement by 30.09.96 Outstanding Balance (Full settlement by grace period 31.12.96)
S$1,185,000.00 S$ 237,000.00 ____________ S$ 948,000.00 S$ 200,000.00 ____________ S$ 748,000.00 ===========
(c) You propose to find a buyer for the remaining 15 units of KDs during the grace period up till 31 December 1996. However, this is purely your internal arrangement and will not affect your liability to pay us the said sums in paragraphs 1, 2(a) and (b) above."
7 At the hearing, counsel for both parties confirmed that as at 6 August 1996, the plaintiffs had paid to the defendants S$975,684 excluding the deposit of S$237,000 paid on 20 February 1995. The total paid was therefore S$1,212,684.
Accounts for 1st batch of kilns
8 It then became clear to me that the sum of S$209,316 referred to in paragraph 1 of the above letter under "Outstanding Accounts" was in fact the balance of the S$1,185,000 outstanding for the 1st batch of 15 kilns. This can be seen from the fact that S$975,684 (amount paid) added to S$209,316 (amount outstanding) equals S$1,185,000, the purchase price for 15 kilns. The defendants demanded that this sum of S$209,316 be paid by 31 August 1996.
9 It is not disputed that this sum of S$209,316 had been paid subsequently and all accounts concerning the 1st batch of kilns were thus settled. The only issue therefore relates to the payments for the 2nd batch of kilns.
Accounts for 2nd batch of kilns
10 It is important to observe that the defendants had by this letter appropriated the S$237,000 (ie 20% deposit) for the partial payment of the S$1,185,000 purchase price for the 2nd batch of kilns. Hence, a total of S$948,000 remained outstanding for this 2nd batch of kilns. The defendants demanded another part payment by 30 September 1996 of S$200,000 and full settlement of the balance of S$748,000 by 31 December 1996.
Instalment payments for 2nd Batch of kilns
11 In their letter of 13 August 1996, the plaintiffs said that they would settle the outstanding balance of S$948,000 by monthly installments. After some exchange of letters, the parties finally agreed on the following instalment payment schedule, which was reflected in the defendants’ letter dated 26 August 1996 as follows:-
"We also note your confirmation to settle the remaining 15 KDs as per payment schedule appended:- Outstanding Amount: S$948,000.00 MONTH AMOUNT S$ September 1996 150,000.00 October 1996 150,000.00 November 1996 150,000.00 December 1996 150,000.00 January 1997 348,000.00 __________ TOTAL 948,000.00" =========
12 The defendants had thus confirmed that the outstanding amount for the remaining 15 kilns was S$948,000. The plaintiffs’ payment of S$237,000 clearly had been taken into account as part payment towards the purchase price of the 2nd batch of kilns. Otherwise, the outstanding balance could not have been S$948,000.
13 In October and November 1996, the plaintiffs made 2 instalment payments of $150,000 each to account of the balance of the purchase price for the remaining 15 kilns.
Delivery of 2nd batch of kilns by 31 January 1997 and the epoxy coating issue
14 On the question of delivery, it is significant to note that the defendants had on 20 August and again on 26 August 1996 insisted that the plaintiffs take full delivery of the remaining 15 kilns by 31 January 1997.
15 However, on 17 December 1996, the defendants informed the plaintiffs that more time was required for fabrication. The plaintiffs replied on 20 December 1996 complaining that they were shocked to hear that the defendants could not deliver by 31 January 1997.
16 In fact, the defendants had been representing to the plaintiffs vide letters dated 28 September 1995 and 3 November 1995 that the balance of 15 kilns had been ready since the end of June 1995 and delivery was long overdue. On 23 January 1996, the defendants said that they still had 15 kilns in their factory and due to the defendants’ long delay in accepting them, they had incurred a storage charge of $11,464 as at 31 December 1995.
17 The plaintiffs thus accused the defendants of having misrepresented to them as follows:-
"In view of this fax and other misrepresentations made by you and our commitment to delivery of 10 KDs to our customer by the 31 January 1997, we claim the right to cancel all deliveries and demand full refund of the monies paid under this Agreement."
18 The plaintiffs explained that they had prepared a payment schedule and started the instalment payments out of good faith and trust as Mr Hoon, the Managing Director of the defendants had claimed in July 1996 that all the 15 kilns were fabricated and were ready for delivery. If the plaintiffs had known of the true situation, the plaintiffs would have adopted a different approach in resolving the matter.
19 The plaintiffs further complained on 11 January 1997 that the earlier 15 kilns installed were not epoxy coated. They now threatened that their lawyer would seek "restitution under the Sale and Goods Act" and this would mean that the defendants would have to replace all the steel structures and compensate the plaintiffs for any loss of use of the kilns.
20 On 16 January 1997, the defendants replied that the plaintiffs had been informed that they required 2 months’ notice in advance of delivery which notice was never given. The defendants said that they were ready, able and willing at any moment to make delivery subject to proper and reasonable notice. At the meeting on 24 December 1996, the defendants mentioned that they could deliver all 15 units by end of January 1997 but were informed that the plaintiffs had no requirement for 10 of the units. The defendants therefore accused the plaintiffs of creating an issue on the question of delivery.
21 As for the epoxy coating, the defendants said that they could not be held responsible because KD Master Pte Ltd, which handled the installation job, was wholly managed by the plaintiffs, being the 70% majority shareholder.
22 However, the defendants notified the plaintiffs that they were prepared to absorb the following additional expenses out of goodwill but since, the plaintiffs had failed to fulfil the agreed payment terms, the defendants were entitled to claim for these additional expenses:-
1)
Purchase of containers under 1st contract bill under our Invoice INV/019/95 should be S$22,200.00 instead of S$11,400.00
S$10,800.00
2)
Purchase of containers under 2nd contract for 15 KD shipped in 12 x 40’ containers @ S$2,100.00
S$25,200.00
3)
Ocean freight, inland trucking and container charges for rockwool from China
S$15,414.00
4)
Custom clearance charges paid to Vincent Yeoh
S$17,400.00
5)
Storage charges at Kallang Place as from 1/8/96 to 31/12/96 - 800 sq. ft x 153 days x S$0.07 per sq. ft
S$8,568.00
6)
Storage charges at Thong Soon Warehouse
S$4,004.00
7)
Interest as from July 1995 to December 1996 on the balance of 2nd Contract S$1,185,000.00 x 80% x 7%pa x 18 months
S$99,540.00 ___________
TOTAL CLAIM
S$180,926.00 ==========
23 I note that interest was the largest component of the defendants’ claim and it was based on 80% of the contract price of S$1,185,000 from July 1995. 80% was used as the defendants themselves again recognised that the plaintiffs had in fact paid 20% (ie S$237,000) towards the purchase price of the 2nd batch of kilns. Hence, there could not be any interest to be charged on that 20% paid but only for the 80% purchase price unpaid. The character and purpose of that S$237,000 payment should be reasonably clear by now.
24 I was however unsure of the premise of claiming interest on that balance 80%. The interest claim did not seem quite appropriate if fabrication of the 15 kilns had not been completed and no shipment had been made, and the cost of installation and freight, which formed a fairly substantial part of the contract price, had not been incurred by the defendants as yet. If the full expense had not been incurred by the defendants, I wonder what was the basis of that interest claim on the balance 80% of the contract price.
25 Neither could I understand the inclusion in the claim of the cost of purchasing containers for the 1st and 2nd contracts and ocean freight, inland trucking and container charges for rockwool, (presumably for the heat insulation installation for the kilns), when the CIF contract price was inclusive of freight, delivery and installation.
26 However, all these need not concern us here. But I could understand why the defendants’ were willing during the negotiations (as can be seen later) to waive those claims in the event of a settlement.
27 No doubt the correctness and strengths of these claims would have been taken into account by the parties during their negotiations prior to settlement and I reiterate that they should not concern us at all.
28 At this stage, the parties decided to engage solicitors to act for them. Solicitors exchanged correspondence thereafter.
Solicitors’ letters leading up to the settlement agreement
29 On 31 January 1997, plaintiffs’ solicitors proposed that the dispute be resolved as follows:-
"1. five (5) of the balance fifteen (15) kilns be delivered to our client by 15 February 1997;
2. the contractual arrangements in respect of the balance ten (10) kilns be terminated forthwith;
3. no further monetary payments to be made by each party to the other, whether such payments are due or not;
4. each party waives and releases any right it has or may have, accrued or accruing, against the other, arising out of or in connection with the Agreement."
30 The plaintiffs were of the view that the defendants’ loss of profit and claims for expenses would be more than set off by the plaintiffs’ claims for loss and damage in respect of the poor quality of the 1st batch of 15 kilns. In particular, the loss and damage arising from the failure to epoxy coat these kilns would be substantial as the kilns would have to be shut down for the repair works.
31 The defendants through their solicitors replied on 13 February 1997 and counterproposed as follows:-
"Our clients are prepared to resolve the matter with your clients on the following basis:- (1) 5 kilns to be delivered to your clients’ warehouse on 20 February 1997 for their onward shipment to St. Petersburg, Russia. (2) Balance 10 kilns to be delivered to your clients’ warehouse on 30 March 1997 for their onward shipment to Vladivostok, Russia. In both cases, please request your clients to advise our clients the arrangement for containers and for stuffing. (3) Our clients require payment as follows:- (a) S$150,000.00 before 20 February 1997. (b) S$498,000.00 before 30 March 1997. (4) Our clients are prepared to waive storage and interest charges amounting to $181,995.47 (and continuing) as stated in our said letter."
32 The defendants therefore took a conciliatory position in their proposal when they said that they were prepared to waive storage and interest charges amounting to $181,995.47, which were continuing. As can be seen from this letter, the defendants clearly were not going to insist on being paid a total exceeding the contractual purchase price of S$1,185,000 should the plaintiffs agree to take delivery of 5 kilns to St. Petersburg and 10 kilns to Valdivostok in Russia.
33 It is also important to note that the defendants were only requiring 2 further payments of $150,000 and $498,000 for delivery of all 15 kilns in the 2nd batch.
34 The total of the past payments (S$237,000 and S$300,000) and these 2 further installments in fact shows that they exactly equal the original contract price of $79,000 per kiln for 15 kilns, which is S$1,185,000. Clearly, the S$237,000 had always been treated by the defendants as part payment towards the contract price. I set out the calculations below:-
a. Deposit paid on 20 Feb 95 .............. $237,000; b. Sep 96 instalment paid in Oct 96...... $150,000; c. Oct 96 instalment paid in Nov 96...... $150,000; d. Payment before 20 Feb 97.................. $150,000; e. Payment before 30 Mar 97.................. $498,000; _________ TOTAL $1,185,000 ========
35 At this stage, I would like to reiterate that all payments for the 1st batch had been settled and no one was raising any issue pertaining to any outstanding payments for them. Hence, the S$237,000 had nothing whatsoever to do with the 1st batch of kilns.
36 On 18 February 1997, the plaintiffs agreed to take delivery of all 15 kilns as per the schedule stated in the defendants’ solicitors’ letter of 13 February 1997. However, they proposed a price of S$40,000 per kiln but they themselves would bear the carriage costs of the kilns to Russia and the installation costs. This plaintiffs’ solicitors’ letter further states:-
"As our client has already paid $300,000 towards the price of the balance kilns, the remainder of the monies will be paid proportionately against delivery of the kilns, subject to a retention sum set out below."
37 It is abundantly clear to me that the solicitors for the plaintiffs had not realised that there was an error as regards the total amount paid up to this stage for the 2nd batch of kilns. It should have been $237,000 plus $300,000, making a total of $537,000 paid towards the price of the 15 kilns.
38 This same mistake was repeated in another of the plaintiffs’ solicitors’ letter also dated 18 February 1997 where they purportedly terminated the contract and demanded the repayment as follows:-
"Our client has in two instalments in September and October 1996 paid a total of $300,000 towards the price of the 15 kilns. We hereby demand repayment of this sum of $300,000 within fourteen (14) days of the date of this letter, failing which our client will, without further reference to you, proceed as advised for the recovery of the sum."
39 It is patently obvious that the plaintiffs’ solicitors had forgotten about the S$237,000 which had been paid and which had been appropriated towards payment of the 2nd batch of 15 kilns. There is no reason for them to demand only for the repayment of S$300,000, leaving out the S$237,000, when none of the kilns in the 2nd batch had been delivered at all.
40 When the defendants’ solicitors replied on 19 February 1997, they counterproposed as follows:-
"Our clients are prepared to settle the matter amicably on the following revised basis:- (1) Ex-factory price of S$43,000.00 per kiln (excluding installation). Payment as follows:- (a) S$115,000.00 before 20 February 1997 for 5 kilns for delivery on 20 February 1997. (b) S$230,000.00 before 30 March 1997 for 10 kilns for delivery on 30 March 1997.
alternatively:-
(2) CNF price at S$47,800.00 per kiln (excluding installation).
Payment as follows:- (a) S$139,000.00 before 20 February 1997 for 5 kilns for arrangement for stuffing and shipment. (b) S$278,000.00 before 30 March 1997 for 10 kilns for arrangement for stuffing and shipment."
41 The negotiations between the parties focused largely on the price per kiln. This price per kiln would naturally depend on whether it was to be CIF, FOB, CNF or Ex-Factory and whether it included or excluded the installation.
42 The rest of the terms involving the payment schedule would simply be worked out on a purely mathematical basis depending on how much had been paid, what was left to be paid and the number of installments for payment. The payment terms and delivery dates would be consequential terms after having agreed on the price per kiln and therefore the total contract price.
43 As can be seen from the undisputed correspondence, the negotiations had centered on what the price per kiln ought to be which in turn depended on the scope of the delivery. Clearly, the parties had negotiated on that basis.
44 From the way that the balance payments were arrived at in the defendants’ solicitors’ letter of 19 February 1997, I have no doubt that the error in the plaintiffs’ solicitors letter concerning the total paid till date also rubbed off on the defendants’ solicitors. The plaintiffs’ solicitors by their two letters both dated 18 February 97 had misled the other party into thinking that only $300,000 had been paid till date for the 2nd batch of kilns. This is apparent in the defendants’ solicitors letter of 19 February 1997 which submitted two alternative proposals for settlement.
45 Taking the defendants’ 1st proposal of an ex-factory price of S$43,000 per kiln (excluding installation), the total contract price would therefore be S$645,000 for 15 kilns. If only S$300,000 had been paid according to the plaintiffs’ solicitors, then only S$345,000 was left to be paid. The 2 installments of S$115,000 and S$230,000 (see paragraphs 1 (a) and 1 (b) of the defendants’ solicitors’ letter) total up to the abovementioned erroneous unpaid balance of S$345,000.
46 Taking the defendants’ 2nd proposal of a CNF price of $47,800 per kiln (excluding installation), the total contract price would therefore be S$717,000 for 15 kilns. Again if only S$300,000 had been paid, then only S$417,000 was left to be paid. Again, the further instalment payments of S$139,000 and S$278,000 (see paragraphs 2 (a) and 2 (b) of the defendants’ solicitors’ letter) total up to the erroneous unpaid balance of S$417,000.
47 The above shows that both the plaintiffs and defendants were labouring under a common mistake that only S$300,000 had been paid till date towards the contract price for the 2nd batch of kilns when in fact, S$527,000 had been paid.
48 There was no discussion whatsoever in the correspondence about what was to be done with regards to the S$237,000 if it was not meant to be part payment towards the contract price for the 2nd batch of kilns. I cannot find any reason why suddenly the S$237,000 should not have been taken into consideration as part payment towards the contract price for the 2nd batch of kilns, when it had been so all along.
49 There is also nothing in the letters between the parties suggesting in anyway that the S$237,000 was to be appropriated towards payment of the defendants’ storage, interest and other charges, which according to the defendants had amounted to some S$181,995.47 as at 28 January 1997.
50 Had there been any discussion or agreement that the S$237,000 was to be treated as payment to the defendants for any loss or damage suffered by them in performing their part of the contract pertaining to the 2nd batch of kilns, I would have expected some correspondence on this. It would be likely that numerous heated correspondence would be exchanged especially when S$237,000 was a relatively large sum in relation to this contract.
51 Furthermore, in view of the conciliatory position taken by the defendants concerning their waiver of storage and interest charges (which I shall deal with in more detail later), I do not see any reason why the plaintiffs should have been so generous to give away the S$237,000 on account of any damage suffered by the defendants with regards to the late delivery of the 15 kilns. I thus conclude that the S$237,000 could not be linked to any possible payment for any loss or damage allegedly suffered by the defendants for the delayed delivery.
52 As there was an abrupt silence in the correspondence concerning the S$237,000 already paid and for the reasons I have given, I am convinced that both parties at this stage had totally forgotten about this S$237,000 payment.
53 I have deliberately set out the background matrix of facts fairly extensively, based entirely on the undisputed correspondence leading up to the settlement agreement between the parties in so far as they would assist me in construing the settlement agreement and in deciding if there was any consideration for the payment of S$237,000 which the plaintiffs say there was none. As the parties had arrived at a settlement agreement, I have refrained from going into the merits of the dispute concerning the late delivery, the lack of epoxy coating or the loss and damage allegedly suffered by the plaintiffs on account of the late delivery.
Settlement Agreement vide an exchange of letters on 24 February 1997
54 Finally, on 24 February 1997, solicitors for the plaintiffs proposed to settle on the following terms:-
"We refer to our respective clients’ obligations with regards to the balance 15 kilns to be delivered under Agreement of Sale 9578 dated 7 February 1995 ("the Agreement"). Our client is prepared to settle those obligations on the following basis. 1 The 15 kilns are priced at S$43,000 per kiln (without installation). 2 The kilns are to conform with the specifications in the Schedule to the Agreement. 3 The kilns are to be delivered in 2 batches to our client’s warehouse as follows. (i) 5 kilns are to be delivered on 28 February 1997. (ii) 10 kilns are to be delivered on 30 March 1997. 4 Our client will supply the SOC containers and our client’s representatives or staff will witness the stuffing of the containers. 5 At least 2 working days before the deliveries of the 2 batches of kilns, your client is to provide the full packing list for the delivery as well as the relevant manual(s) for the kilns. 6 Upon the completion of the delivery and the stuffing in the containers of all the items in the packing list, our client will forthwith confirm acceptance in writing and together with such confirmation make payment of the following balance sums (taking into consideration the S$300,000 already paid to your client) of the purchase consideration for the 15 kilns: (i) S$115,000 in respect of the 5 kilns to be delivered on 28 February 1997. (ii) S$230,000 in respect of the 10 kilns to be delivered on 30 March 1997. We trust these terms are acceptable to your client and look forward to your written confirmation."
55 The plaintiffs continued to labour under the erroneous impression that only S$300,000 had been paid to account of the purchase price for the 2nd batch of 15 kilns. Hence, the instalment payments stated of S$115,000 for 5 kilns and S$230,000 for 10 kilns plus the erroneous amount already paid of S$300,000 add up to S$645,000 for 15 kilns, which is exactly S$43,000 per kiln as stated therein.
56 Again, there was no mention in this letter of the S$237,000 nor any mention that the plaintiffs had agreed to pay the defendants for any loss or damage suffered by them on account of the late delivery.
57 The defendants’ solicitors in their letter dated 24 February 1997 simply accepted the proposed terms of settlement, subject to the plaintiffs bearing the costs of transporting the equipment to the plaintiffs’ warehouse in Russia. They replied as follows:-
"We refer to your letter of 24 February 1997 received this afternoon at 12.30 pm.
Our clients are agreeable to the proposed terms of settlement stated in your said letter, subject to your clients bearing the costs of transporting the equipment to your clients’ warehouse.
In this regard, please refer to our letter of 19 February 1997 whereby we stated that the price of S$43,000.00 per kiln is ex-factory price."
58 The defendants had unambiguously stated that the ex-factory price was S$43,000 per kiln. The defendants themselves appear to have placed great stress on this ex-factory price per kiln of S$43,000 and had even taken the trouble to make specific reference to an earlier letter of theirs of 19 February 1997 where they had stipulated the same price per kiln. In other words, when the defendants confirmed their acceptance of the plaintiffs’ settlement proposal, they themselves had emphasized that the plaintiffs were to pay an ex-factory price of S$43,000 per kiln, no more and no less.
59 The plaintiffs’ solicitors on the same day confirmed the defendants’ acceptance of the terms of settlement and informed the defendants that they would send the containers to the defendants’ premises where the loading could be done.
Principles for construction of the settlement agreement
60 I shall now deal with the principles that have to be applied when terms in an agreement are construed.
61 Lord Diplock in Pioneer Shipping Ltd. v B.T.P. Tioxide Ltd [1982] A. C. 724 said:-
"The object sought to be achieved in construing any contract is to ascertain what the mutual intentions of the parties were as to the legal obligations each assumed by the contractual words in which they sought to express them."
62 In Reardon -Smith Line Ltd. v . Hansen-Tangen [1976] 1 W.L.R. 989, Lord Wilberforce said:-
"When one speaks of the intention of the parties to the contract one speaks objectively -- the parties cannot themselves give direct evidence of what their intention was -- and what must be ascertained is what is to be taken as the intention which reasonable people would have had if placed in the situation of the parties."
63 The less easy question is whether the background matrix of facts surrounding the making of the agreement must always be totally disregarded when construing that agreement. If not, then what is the extent to which those background facts may be taken into account when the court objectively construes the intentions of the parties from the words used in the contractual documents.
64 It is pertinent to have regard to what Lord Wilberforce had said in Reardon Smith Line Ltd. v Hansen-Tangen [1976] 1 W.L.R. 989:-
"No contracts are made in a vacuum: there is always a setting in which they have to be placed. The nature of what is legitimate to have regard to is usually described as ‘the surrounding circumstances’ but this phrase is imprecise; it can be illustrated but hardly defined. In a commercial contract it is certainly right that the court should know the commercial purpose of the contract and this in turn presupposes knowledge of the genesis of the transaction, the background, the context, the market in which the parties are operating."
He continued:-
"......what the court must do must be to place itself in thought in the same factual matrix as that in which the parties were."
65 In an earlier decision in Prenn v. Simmonds [1971] 1 W.L.R. 1381, Lord Wilberforce had observed that:-
"The time has long since passed when agreements, even those under seal, were isolated from the matrix of facts in which they were set and interpreted purely on internal linguistic considerations ....We must.... inquire beyond the language and see what the circumstances were with reference to which the words were used, and the object appearing from those circumstances, which the person using them had in view."
66 Lord Russell of Killowen in Hvalfangerselkapet Polaris A/S v. Unilever Ltd. [1933] 46 Lloyd’s Rep. 29 had held:-
"Before a Court begins to construe a written contract, it must know all the relevant circumstances which exist and are within the knowledge of the contracting parties at the time when they make their contract."
67 In dealing with a question of construction of a rent review clause in a lease, Nourse L.J. in Philpots (Woking) Ltd. v. Surrey Conveyancers Ltd. (1985) 277 E.G. 61 said:-
"I think it very probable that, in accepting the landlord’s construction, the learned judge has correctly assessed what the parties did indeed believe and desire to be the effect of [the clause]. But a court of construction can only hold that they intended it to have that effect if the intention appears from a fair interpretation of the words which they have used against the factual background known to them at or before the date of the lease, including its genesis and objective aim."
68 I do not think that the objective exercise of construing specific terms in a written agreement can be so clinical as to be confined exclusively to the written terms therein in total disregard of the surrounding circumstances, and the object of the contract as may be found by construing the agreement as a whole. No doubt the words and phrases used and the meaning conveyed by them would provide the main guidance to the court when construing the true effect of those terms in the agreement. Where inconsistencies appear in different parts of the agreement, which is not infrequent, the court must try its best to resolve that inconsistency and the court must have regard to the undisputed background facts and circumstances if they could aid the court to come to a construction that harmonises as much as possible the inconsistency having regard to the whole agreement, its principal objects and terms as may be discerned from the agreement. The court should be slow to hold that any inconsistency would necessarily mean that there was no agreement reached and hence, both parties are released from their obligations under the agreement.
69 In I. R. C. v. Raphael [1935] A.C. 96, Lord Wright said:-
"The words actually used must no doubt be construed with reference to the facts known to the parties and in contemplation of which the parties must be deemed to have used them; such facts may be proved by extrinsic evidence or appear in recitals; again the meaning of the words used must be ascertained by considering the whole context of the document and so as to harmonize as far as possible all the parts; particular words may appear to have been used in a technical or trade sense, or in a special meaning adopted by the parties as shown by the whole document. Terms may be implied by custom and on similar grounds. But allowing for these and other rules of the same kind, the principle of the common law has been to adopt an objective standard of construction and to exclude general evidence of the intention of the parties; the reason for this has been that otherwise all certainty would be taken from the words in which the parties have recorded their agreement or their dispositions of property. If in some cases hardship or injustice may be effected by this rule of law, such hardship or injustice can generally be obviated by the power in equity to reform the contract, in proper cases and on proper evidence that there has been a real intention and a real mistake in expressing that intention; these matters may be established, as they generally are, by extrinsic evidence. The Court will thus reform or rewrite the clauses to give effect to the real intention. But that is not construction, but rectification."
70 The principles of construction have been neatly summarised by Saville J. in Vitol B. V. v. Compagnie Europeene des Petroles [1988] 1 Lloyd’s Rep. 574 as follows and with which I agree:-
"The approach of the English law to questions of the true construction of contracts of this kind is to seek objectively to ascertain the intentions of the parties from the words which they have chosen to use. If those words are clear and admit of only one sensible meaning, then that is the meaning to be ascribed to them--and that meaning is taken to represent what the parties intended. If the words are not so clear and admit of more than one sensible meaning, then the ambiguity may be resolved by looking at the aim and genesis of the agreement, choosing the meaning which seems to make the most sense in the context of the contract and its surrounding circumstances as a whole. In some cases, of course, having attempted this exercise, it may simply remain impossible to give the words any sensible meaning at all in which case they (or some of them) are either ignored, that is to say, treated as not forming part of the contract at all, or (if of apparent central importance) treated as demonstrating that the parties never made an agreement at all, that is to say, had never truly agreed upon the vital terms of their bargain."
I think the reference to "words" in the above passage applies with equal force when it comes to "figures and numbers" in a contract.
My views on the construction of the settlement agreement
71 Applying those principles in construing the settlement agreement reached by the parties on 24 February 1997, I am of the view that on the true construction of the settlement agreement taken as a whole, the parties have agreed that the contract price was to be S$43,000 per kiln and the total contract price for 15 kilns was to be S$645,000. I now set out my reasons.
72 After scrutinising the letters, it was very clear that the price per kiln was to be S$43,000. There could be no misunderstanding on this. The specific phrase used "priced at" in the 1st term of the settlement agreement must mean the purchase consideration for the goods. That is the only sensible meaning that I could give to that phrase. It cannot mean, as the defendants would like to contend, further purchase consideration for the kilns, the earlier part consideration being the S$237,000. I have to adopt an objective approach in construing the intentions of the parties having regard to the meaning of the words and phrases used by them in the letters exchanged.
73 During the hearing, I specifically asked counsel for the defendants what was the defendants’ position concerning the interpretation of the words "per kiln". I recorded in my notes of evidence what counsel had submitted as follows:
"Defendants’ interpretation of "per kiln" means the price of each kiln excluding the cost of the installation of each kiln and the cost of its shipment to Russia. That’s all. It is a straightforward interpretation. In the settlement agreement, the price per kiln according to this interpretation is $43,000 per kiln."
74 I cannot agree more with this interpretation of counsel for the defendants. Based on the true construction of the settlement agreement, I find that the parties have agreed that the contract price for the remaining 15 kilns was to be S$43,000 per kiln, ex-factory, without installation. The total contract price for 15 kilns therefore amounted to S$645,000. The plaintiffs would bear the entire cost of transportation to Russia from the defendants’ premises . The plaintiffs also had to bear the cost of supplying the SOC containers. Installation of the 15 kilns in Russia would be done by the plaintiffs themselves at their own cost.
75 The payment terms in paragraph 6 of the plaintiffs’ solicitors’ letter dated 24 February 1997 must be construed subject to the main and most important term of the settlement agreement which is the ex-factory contract price of S$43,000 per kiln (or total ex-factory contract price of S$645,000 for 15 kilns) exclusive of installation. This vital term in the settlement agreement is entirely unambiguous. The instalment amounts in the payment schedule are merely subsidiary and consequential to this most important term in the agreement, which is the purchase consideration or the price for the kilns.
76 It is also reasonably clear to me that the parties had intended that any payment previously made towards the purchase price had to be taken into account and be deducted from the price of $43,000 per kiln. Paragraph 6 of the plaintiffs’ solicitors’ letter dated 24 February had expressly stated such except that the wrong amount paid had been inserted.
77 I have to take account of the words used in paragraph 6, which were the "balance sums of the purchase consideration for the 15 kilns", leaving out the words in brackets for the time being. This phrase must be construed to mean that whatever was unpaid out of the total agreed purchase consideration of S$645,000 would constitute the balance sums to be paid. Excluding the figure 300,000, the words in brackets "(taking into consideration the S$________ already paid to your client)" in the context of that sentence suggests that the amounts previously paid to the defendants on account of the purchase price had to be taken into consideration. The figure of 300,000 inserted was therefore inconsistent with the rest of the construction and meaning in paragraph 6 which required only payment of the balance of the purchase consideration. If it was to be 300,000 dollars, then one would be taking into consideration less than what had already been paid, which was not the intention behind paragraph 6.
78 The undisputed factual background showed that 527,000 and not 300,000 dollars had already been paid by the plaintiffs towards the purchase consideration of the 2nd batch of 15 kilns.
79 Defendants’ counsel then submitted that the court in construing the settlement agreement should not know at all that the S$237,000 had been paid earlier. He contended that because this prior payment had not been stated anywhere in the correspondence comprising the settlement agreement, the court should be blind to it. Counsel submitted that the court can only take account of the facts disclosed in the settlement agreement. Since the agreement only stated that $300,000 was already paid, nothing further could be taken as having been paid towards the purchase consideration.
80 I do not find any merit in that submission. From the defendants’ own correspondence, it can be readily established that the S$237,000 payment had been made for a clearly identifiable and specific purpose ie it is part payment towards the purchase price. Not to recognise that payment would be to ignore important undisputed facts and surrounding circumstances, which formed the basis of the settlement agreement.
81 The cases I have cited and the principles of construction I have alluded to above show clearly that I am not precluded on the facts of this case from referring to such undisputed facts and surrounding circumstances as can be gleaned from the undisputed documentary evidence placed before the court. I would respectfully adopt the words of Sir John Pennycuick in St. Edmundsbury @ Ipswich Diocesan Board of Finance v. Clark (No.2) [1975] 1 W.L.R. 468 where he said that "it is not until one has considered the instrument and the surrounding circumstances in conjunction that one concludes the process of construction."
82 The surrounding undisputed facts and circumstances leading up to the settlement agreement would clearly be relevant if they would assist the court in determining the true agreement of the parties, which the parties may or may not have been reduced accurately into writing.
Defendants’ contention that S$645,000 was a settlement sum
83 At paragraph 32 of the 1st affidavit of Mr Hoon Cheong Kong, Managing Director of the defendants filed on 24 April 1997, he deposed that "only payment of S$300,000.00 was expressly intended to be deducted from the settlement sum of S$645,000.00" However, no where in the exchange of letters was S$645,000 stated to be a settlement sum. In fact, there was no provision that S$645,000 was to be paid in full and final settlement of all disputes arising from the sale agreement.
84 On the contrary, the defendants themselves had stated unequivocally in their letter dated 24 February 1997 (which was one of the 3 letters comprising the settlement agreement) that "the price of S$43,000.00 per kiln is ex-factory price." Hence, the total ex-factory price of 15 kilns must have been understood by the defendants to be S$645,000. This is very different from an agreed settlement sum in full discharge of all liabilities.
85 The defendants are now plainly attempting to convert the agreed ex-factory price of S$645,000 for 15 kilns into a purported settlement sum, which only takes into account the $300,000 paid but not the other sum of $237,000 paid. Why there is such a distinction between the 2 sums paid is unsupportable and incomprehensible.
86 I find that the defendants cannot rely on the payment schedule made on the erroneous assumption that only $300,000 was paid when in fact $537,000 had been paid. The defendants cannot be allowed to take advantage of this genuine error.
87 To construe that parties had agreed to the payment schedule and hence, have to adhere to it is in total disregard of a clear undisputed express term in the agreement that the price per kiln was S$43,000, which incidentally was the very first term of the settlement proposed by the plaintiffs’ solicitors’ letter. In my opinion, to disregard a clear express term in this way would be wrong in law. I would then not be giving any effect to a very fundamental term in the whole agreement, which was clearly and simply that the price per kiln ex-factory and without installation had been agreed at S$43,000.
Basis for computation of the 2 remaining instalment payments.
88 At this point, I should say that it was also clear to me how the parties worked out the balance amounts for the instalment payments. One third of the amount unpaid would have to be paid prior to delivery of one third of the 15 kilns ie 5 kilns. Two thirds of the amount unpaid would have to be paid prior to delivery of the remaining two thirds of the 15 kilns ie 10 kilns. A strict ratio was thus used. I could see this also being applied in the payment schedules proposed in the letters from the solicitors dated 19 February 1997 and 24 February 1997.
Error realised
89 On 3 March 97, the plaintiffs’ solicitors wrote to the defendants’ solicitors after realising that they had omitted to take account of the prior payment of S$237,000 in the payment schedule for the balance sums unpaid. They now realised their error that the actual amount unpaid was S$108,000 and not S$345,000. Following the ratio agreed earlier, they proposed payment of the balance sum on the same 1/3 sand 2/3 basis ie payment of one third of the balance sum of S$108,000 when 5 kilns were delivered and payment of two thirds of the same balance sum of S$108,000 when the remaining 10 kilns were delivered.
90 The defendants’ solicitors after consulting their clients replied on the next day that there was no common or any type of mistake. They alleged that the payment of S$237,000 had already been taken into account and was never part of any settlement sum. They insisted that their clients’ position had always been that the balance payment for the 15 kilns had to be paid. Their view was that the price of $43,000 per kiln was in fact the balance of the purchase price for the kilns. The defendants contended that the total contract price for the 15 kilns was $882,000.
91 If so, then the price per kiln based on this total contract price would appear to be $58,800 per kiln ex-factory without installation. This would be totally inconsistent with the unequivocal principal term in the settlement agreement that the price per kiln was S$43,000.
92 In none of the numerous correspondence in the negotiations leading up to the settlement agreement could I see any such figure of $58,800 per kiln or a contract price of $882,000 for 15 kilns ever being mentioned or discussed. This is very telling. I find that these figures were conjured up by the defendants subsequently as an afterthought to hide the fact that there was really an oversight resulting in an overpayment of S$237,000 for the kilns.
93 They now tried to show in this letter that they would suffer a shortfall of S$303,000 based on their purported contract price of S$882,000. What they have conveniently disregarded is that this price per kiln in the settlement agreement had to be much lower in view of the fact that it is an ex-factory price without installation and without delivery. It is no longer a CIF price with installation.
Re-computation by adding back the installation and freight costs
94 The original contract price was S$1,185,000 (based on S$79,000 per kiln CIF, inclusive of installation by defendants). With the construction I have reached, I have basically found that the parties had agreed to settle at a new contract price of S$645,000 (based on S$43,000 per kiln ex-factory, exclusive of installation.)
95 I wanted to see if it would make any sense for reasonable persons in the position of the parties to agree to such a large reduction from a CIF price of S$79,000 with installation to an ex-factory price of only S$43,000 without installation. Was it really such a large discount that any reasonable person in the position of the defendants would not likely have agreed to it.
96 On the other hand, if what the defendants contended was correct that the $237,000 was included in the settlement and the S$43,000 per kiln was to be further consideration for the delivery of the kilns, would the plaintiffs as reasonable persons have agreed to it. Would the plaintiffs agree to the additional payment of S$237,000 over and above the price of $645,000 for the 15 kilns, ex-factory and without installation.
97 To try to answer these questions and to reassure myself that I have not misconstrued the settlement agreement and that my construction was also consistent with what the parties had intended in the settlement agreement, I notionally added back the cost of freight and installation to the total contract price of S$645,000 (based on S$43,000 price per kiln for 15 kilns ex-factory without installation).
98 In coming to the settlement agreement, parties would naturally have done their own sums and factored in the cost of freight and cost of installation when making adjustments from the CIF price with installation to the ex-factory price without installation.
99 I asked the parties to provide me with information on the freight charges and the installation costs.
100 Defendants’ counsel informed me that the freight for the 1st batch of 15 kilns was S$80,000. Installation cost for them was S$330,000.
101 As the second batch was to be in 2 shipments with 5 kilns in the 1st shipment and 10 kilns in the 2nd shipment, plaintiffs’ counsel informed me that the freight for 5 units was about S$39,280. The 15 SOC containers for shipment which the plaintiffs now had to provide cost US$4,000.
102 For simplicity, I took the freight for the 2nd batch of kilns also to be S$80,000 and the installation cost at S$330,000. I assumed the 15 SOC containers to cost S$6,000 (based on a US1 to S$1.50 conversion rate). The total notional CIF price with installation would then be S$645,000 + S$80,000 + S$330,000 + S$6,000 = S$1,061,000 should the defendants have to ship and install the 15 kilns for the plaintiffs. Then only would we be comparing apples with apples so to speak. This amount of S$1,061,000 was a slight discount from the original contract price of $1,185,000. Due to the settlement, I did not think it was unreasonable for the parties to have agreed to a slight discount from the original contract price.
103 However, if the defendants’ contention were correct, then the notional settlement price would be S$1,061,000 plus a further S$237,000 making a total contract price of S$1,298,000. I then asked myself the question whether the plaintiffs as reasonable persons would have agreed to pay above the original contract price of S$1,185,000. I am inclined to believe that it would be most unlikely for the plaintiffs to have agreed to do so. The conduct of the defendants as could be seen in their letters also do not show that they had ever adopted a position that the plaintiffs had to pay more than the original contract price.
104 The most telling letter was that from the defendants’ solicitors dated 13 February just 9 days before the settlement agreement.
105 That letter was written on the basis that the defendants would still supply, deliver and install the 15 kilns as per the original contract price although delivery had been delayed to to 20 February 1997 and 30 March 1997. The defendants had not increased the total contract price because they only required further payment of S$150,000 and S$498,000 and no more. This was exactly the same as the original contract price of S$1,185,000 once the prior S$237,000 and S$300,000 payments were taken into account. From these calculations, it was fairly clear to me that the defendants never intended to charge anything extra above the original contract price although delivery was much delayed. In this letter, the defendants stated that they were prepared to waive storage and interest charges amounting to $181,995.47. This position was reiterated by defendants’ counsel letter of 4 March 1997, where it was stated interalia that:-
".. although our clients may have other substantial claims for storage charges, interests and costs which if and provided settlement materializes our clients were prepared to waive." (Emphasis is mine.)
106 Since there was settlement, the defendants had therefore waived those charges. If so, could the parties possibly have intended or contemplated that the notional settlement contract price (when recomputed to a CIF price with installation) should be above the original contract price. I think not for the following reasons.
107 The defendants had never adopted a tough and uncompromising position during the negotiations that the plaintiffs had in any event to bear their storage charges, interests and costs. Even if one were to accept the defendants’ assessment of those claims to be S$181,995.47 as at 28 January 1997, why should the plaintiffs as reasonable persons have agreed to pay a much higher sum of S$237,000 when the defendants’ own assessment of their alleged loss amounted to only S$181,995.47. It simply does not make any sense to me.
108 It is therefore most improbable that the parties, in particular the plaintiffs, could have subsequently agreed to any settlement that effectively raised the contract price for the 15 kilns from S$1,185,000 to S$1,298,000 (both based on CIF with installation). That would be the result if the defendants’ contention was correct. I find it very difficult to accept that contention and I reject it.
109 After going through the above computations, I am reinforced in my view that the construction I have placed on the settlement agreement was not wrong.
110 I am convinced that the settlement agreement had correctly reflected the true agreement of the parties to settle their dispute at an agreed price of S$43,000 per kiln ex-factory without installation and with neither party making any claims for loss or damage for the late delivery of the 2nd batch of 15 kilns.
111 Having paid the full amount of S$645,000 as agreed under the terms of the settlement agreement as well as the S$237,000, there was obviously no consideration for that S$237,000 overpaid. The plaintiffs clearly have a restitutionary right to that money overpaid. Under the circumstances, I cannot allow the defendants to retain that sum and be unjustly enriched at the expense of the plaintiffs.
112 In the result, I granted the declaration sought by the plaintiffs in prayer 1 that on the true construction of the settlement agreement reached between the plaintiffs and the defendants on 24 February 1997, the plaintiffs were entitled to the benefit of S$237,000 paid by the plaintiffs to the defendants in or about February 1995. I ordered the defendants to repay that sum to the plaintiffs. Costs were fixed at $7,500 to be paid by the defendants to the plaintiffs. Dissatisfied with my decision, the defendants have appealed.
SGD : CHAN SENG ONN
JUDICIAL COMMISSIONER
SUPREME COURT
Chan Seng Onn JC
Tan Chuan Thye (Allen & Gledhill) for the plaintiffs
Freddie Lim (Lim, Han & Wong Partnership) for the defendants