This judgment is subject to final editorial corrections approved by the court and/or redaction pursuant to the publisher’s duty in compliance with the law, for publication in LawNet and/or the Singapore Law Reports.
Amarnath Thakral Enterprises Pte Ltd (formerly known as Amarnath Enterprises (Pte) Ltd v Man Fai Tai Invesetment Pte Ltd
[1998] SGHC 271
Suit 648/1995
Lai Kew Chai J
07 August 1998
Judgment :
Cur Adv Vult
Introduction
At all material times, the plaintiffs were sub-tenants in possession of three partitioned sections in the warehouse complex of the defendants known as No. 10 Jalan Penjuru, Singapore. They claim that some of their textile in bales, which were stored in the three portions of the warehouse, were damaged as a result of two floods which occurred on 21 June 1990 ("the first flood") and on 20 December 1990 ("the second flood"). They claim the sums of $296,183.63 and S$144,077.28 as damages which they say they suffered as a result of the two floods respectively, and alternatively, damages, together with interest and costs.
The 3 sublet units
2.1 The warehouse was sub-divided into many sections and were let out by the defendants, whose head lessors were the Jurong Town Corporation, to many sub-tenants, including the plaintiffs. The layout of the three partitioned sections and those of other sections in the immediate neighbourhood appears in a plan in the bundle of documents marked 3BD252. The plan is not easy to read. The three sections in the warehouse, which were not adjacent to each other, were held under three leases. The lease relating to section A with an area of 240 sq m and situated between sections B and C took effect from 6 June 1989 and the rent was $9,360.00 per month or $0.65 per sq ft. Section B, to the left of section A, was held under a lease commencing 1 December 1989 with an area of 3,010 sq m at a monthly rent of $21,297.60 or $0.65 per sq foot. The lease in respect of section C began on 15 April 1990 and it covered an area of 1,672 sq m and the monthly rent was $11,160 and the rate per sq foot was lower at $0.60.
2.2 At all material times, the plaintiffs employed Mr Saminathan (PW2) as their Administration Manager. He worked in the head office of the plaintiffs and drafted some of the plaintiffs' letters following the floods. He was not stationed at the 3 sublet units, though he visited them after the floods. One Mr Gurcharan Singh kept watch of the 3 sublet units where a number of workmen either stacked bales of textiles or load them on lorries for deliveries or exports. Though Mr Gurcharan Singh had left the services of the plaintiffs, he was available in Singapore to give evidence. No effort was made to call him. Mr Saminathan confirmed that usually 4 to 5 workers usually worked until 10 pm.
The warehouse complex
3.1 The warehouse complex was previously used as a plywood factory which was built in the 1960s and which was later converted into a warehouse complex. The building is constructed on a 2-bay steel portal frame which has a jack-up roof. Its huge external roof, which was covered with asbestos sheets, was served by an external roof gutter and an enormous valley gutter from which rain water was drained off the roof via the roof guttering to drain. As was explained at the trial, the external roof gutter had a secondary or complementary high level internal piping system to discharge the rain water to drain via a number of sumps and a network of subterranean drains. That network of underground pipes lies below the floor of the warehouse. The pipes are connected to sumps from which rainwater is drained by the pipes to the perimeter drains. From thence, rainwater was drained off to the sea nearby. I will have to return to the technical details in view of two disputes, inter alia: (1) whether part of the roof and internal drainage system, including the sumps, which were structurally and physically accessible within the sublet units were within the possession and control of the plaintiffs as the sub-tenant?; and (2) from where did the rain water enter sections A, B and C on those two occasions?
3.2 For the letting business and general maintenance of the warehouse, the defendants employed Mr Pang Heng Cheong, DW3 ("Mr Pang") as the General Manager. Under him was Mr Ng Kian Hua, DW1 ("Mr Ng"), a maintenance officer, who reported to him. They both gave evidence. The defendants employed as their term contractors, Degree Engineering Pte Limited, who carried out minor repairs or maintenance works in the huge complex. Degree Engineering stationed one Mr Ng Swee Bin (DW2), who gave evidence of the background and of what he observed of the aftermath of the two incidents, and one Mr Sim Kim Soo who did not give evidence.
The actions and pleadings
4 Both writs of summons were filed on 17 April 1995, nearly 5 years after the first flood. In the meantime, a fire destroyed a substantial portion of the warehouse, which included sections A and B which had been reconstructed as an open area. Section C survived the fire. The portion of the warehouse adjoining sections A and B, including the drainage system remained for inspection by the experts called on both sides to determine the cause(s) of the ingress of rainwater. The delay in the commencement of the actions, which were in fact driven by the insurers of the plaintiffs, India Insurance Pte Ltd., led, as will be explained later, to very poor quality evidence adduced by the plaintiffs. The fire, however, did not really hamper the rebuttal expert evidence led by the defendants against the questionable opinions of the expert of the plaintiffs.
5 The trials of the two actions were consolidated. The original claim as pleaded in Suit No 649 of 1995, in respect of the first flood, was framed on the basis that the flood took place in section B and in Section B alone. On top of that, only the lease in relation to lease B was referred to. The general overall assertion in para 7 of the amended statement of claim was that the rainwater entered the demised property (ie section B) "from cracks on the concrete floor", flooding the same up to 100 mm (ie 4 inches). The particulars alleged against the defendants invoked by the plaintiffs in support of the assertion in para 7 were as follows:
(a) failing to keep the demised property in a state of good repair and tenantable condition, inter alia, by ensuring that the natural elements like rainwater were kept out;
(b) failing to ensure that the water pipes and other channelling mechanisms and devices in the demised property were kept in a state of good repair and maintenance to properly direct water away from storage space;
(c) failing to maintain the compound drains and to keep them free from obstruction;
(d) failing to provide and maintain a waterproofed flooring in the demised property;
(e) failing to ensure that there were no cracks on the flooring in the demised property capable of allowing seepage of water; and
(f) failing to ensure and keep the common areas in a proper state of repair.
6 The case for the plaintiffs when it was opened was unhelpfully equivocal and was certainly not sufficiently focused. The opening statement of the plaintiffs expanded the sources of water ingress to leaking water pipes, gutters and the roof. Not unexpectedly, the defendants objected, having prepared their defence against the broad assertion that water had seeped from the floor at or near where the flooding had taken place. The plaintiffs obtained an adjournment to amend their statement of claim. When the application was heard on 26 May 1997, the amendment was allowed on the basis that it was without prejudice to the defendants' right to plead the time-bar defence.
7 In the amended statement of claim, filed on 16 June 1997, the plaintiffs alleged that there were six sources of rainwater ingress which led to the floods and that they were in breach of the defendants' covenant for quiet enjoyment of the demised premises. The six sources were:-
(a) water flowing from the external drain outlets into the premises;
(b) water overflowing from collection pits outside the demised premises;
(c) underground water emerging from beneath the concrete floor entering the demised property through cracks and/or exposed sections of the concrete floor as a result of saturation of underground water;
(d) water gushing out from joints and down pipe in the demised property;
(e) water overflowing from the sump in the demised property; (I pause to note that only one sump was referred here)
(f) water overflowed from overhead gutters in the demised property.
8 The amendments also expanded the area in which the breaches were committed to include sections A and C under the respective leases.
9 By para 9 the plaintiffs alleged that the defendants were under a duty to exercise reasonable care and skill to ensure that the plaintiffs was given quiet enjoyment. In particular, the defendants were under a duty to exercise reasonable care and skill (1) to maintain the drainage system for the defendants entire warehouse complex, including the 3 sublet units; and (2) to maintain the common areas that were not within the plaintiffs' possession, power or control in a reasonable state of repair and to ensure that they were free from leaks and/or obstruction. The plaintiffs confirmed that para 9 of the amended statement of claim was based on the covenant for quiet enjoyment as agreed in the three leases.
10 Alternatively, the plaintiffs allege that the defendants had been negligent as they failed to exercise any reasonable or adequate maintenance to keep the 3 sublet units in a fit and proper state of repair and to prevent leaks and/or obstructions. The particulars of negligence were precisely the same as those particular breaches of contractual duties in support of the averment that the defendants had breached their contract to give quiet enjoyment of the 3 sublet units to the plaintiffs.
11 In relation to the claims for damages arising from the second flood, the pleadings regarding liability were the same as those asserted in connection with the claims arising from the first flood. In addition, however, the plaintiffs relied on the occurrence of the first flood, which therefore enhanced the duties of the defendants.
12 In both actions, the plaintiffs rely on the doctrine of res ipsa loquitur.
13 There are three defences. First, the defendants assert that the two floods were not due to or caused by the breach of any of the defendants' obligations. They further assert that the floods and the losses were caused by the plaintiffs' (1) failure to safeguard their goods; (2) failure to put them on pallets; and/or (3) failure to maintain and repair the 3 sublet units in breach of the terms of clause 4(k) of the leases. Secondly, the defendants invoke clause 4(i) which exclude in terms any liability as alleged. Thirdly, the defendants assert that any action in relation to sections A and C under their respective leases were time-barred under s 56(a) of the Limitation Act as the amendments were filed only on 16 June 1997, more than 6 years after the first and second floods.
14 The plaintiffs filed their Replies in the two actions. They allege waiver and estoppel against the defendants. They say that the defendants are estopped from relying on clauses 4(k) and 4(i) and that the defendants had assumed the responsibilities and obligations of maintaining the drainage system including the down pipes, drainpipes, roof, gutters, walls and the floor in a fit, proper and adequate state of repair, free from leaks and/or cracks and/or obstructions and had absolved the plaintiffs from such responsibilities and obligations.
Relevant Terms of the Leases
15 For present purposes, the relevant terms of the leases which we have to bear in mind are set out in sub-clauses 4(i), 4(k) and 7(b) in each of the three leases. They read as follows:
Clause 4(i)
"the Subtenant shall be responsible for safeguarding and insuring its own property on the sublet premises and the Landlord shall not be liable for any damage to or loss of the Subtenant's property however occurring;"
Clause 4(k)
"the Subtenant shall keep the sublet premises in tenantable repair and at the expiry of the subletting term or earlier determination thereof, yield up the sublet premises in tenantable repair in accordance with the covenants herein contained;"
Clause 7 (b)
"7 The Landlord hereby covenants with the Subtenant:-
...
(b) that the Subtenant paying the rent hereby reserved and observing and performing the covenants herein contained shall peaceably hold and enjoy the sublet premises during the subletting term without interruption by the Landlord or any person rightfully claiming under or in trust for the Landlord."
16 Since the plaintiffs had by sub-clause 4(k) covenanted to keep the "sublet premises" in tenantable repair, it is necessary to see how the phrase was defined in each of the three leases. The definition is in recital 3 which, having recited the consideration and background, went on to provide, omitting the irrelevant parts: "...the Landlord has agreed to sublet to the Subtenant a portion of the Landlord's premises,... (hereinafter referred to as "the sublet premises" which expression shall include all buildings sewers drains fences and walls erected thereon) upon the terms hereinafter contained." (emphasis added).
Evidence and Findings
(a) Of the cause(s) of the ingress of rainwater
17 I deal first with the causes of rainwater ingress resulting in the two floods. Mr Saminathan (PW2) in his affidavit evidence in chief stated that at about 9.20 am on Thursday, 21 June 1990 the plaintiffs' employee, one Gurcharan Singh attended at section B, (which was under the lease exhibited by Mr Saminathan in his affidavit evidence in chief). Upon entering the premises Gurcharan Singh discovered that certain areas within the premises were flooded with water up to 100 mm (4 inches) deep. As a result of the flooding, bales of textiles in the premises, which were imported from the then USSR, sustained damage.
18 The plaintiffs reported the flooding incident to their insurers, India International Insurance Pte Ltd, who covered the plaintiffs against fire and allied perils. It has to be noted that Mr Thakral, who was the controller and principal shareholder of the plaintiffs, was at all material times a member of the Board of Directors of the insurers. The insurers sent their loss adjustor and surveyor, Mr Phua Kwang Wah, PW4 ("Mr Phua"), who inspected section B and he was attended to by Mr Saminathan.
19 Mr Phua noted that "the incursion of water was through the cracks on the concrete floor between the sump and the metal plate over the hole on the floor and from an exposed section of the concrete floor near the entrance to section B". He further stated that he was of "the view that plainly, the drainage system at the said premises was inadequate and defective in that it was unable to drain the rainwater to the drain at a sufficient speed to prevent the water flowing into the premises. Consequently, there was incursion of water into section B causing it to flood and at certain areas, the flooding was up to 100 mm." These assertions of fact and opinion were subjected to cross examination. It turned out that he was told of the depth of the water by Mr Gurcharan Singh. Mr Gurcharan Singh was available in Singapore to give evidence and no explanation was given why he was not called. The truth and accuracy of what Mr Gurcharan Singh had seen, thought and reported could not be tested and must therefore be rejected as hearsay evidence.
20 Mr Phua did not have personal knowledge of what had happened at or shortly after the flooding. He arrived at 3.30 pm on 21 June 1990. He was not a careful person: he mistakenly gave the areas of sections B as 2,400 sq metres, section A as 400 sq metres instead of 1,400 sq metres and section C as 400 sq metres instead of 1,672 sq metres.
21 He claimed that there was an exposed section of the concrete floor and that this was the hole marked on the sketch plan of section B in 2BD308. But there was no damage sustained in this area, on the plaintiffs' evidence. Though other photographs were taken, for some unexplained reason, no photograph was taken of the hole. His evidence was based on hearsay and his unsubstantiated opinion.
22 I now consider the evidence of Mr Phua against the opposing evidence. For the defence, Mr Chai Kim Poh, DW4 ("Mr Chai"), a practising professional engineer, gave expert evidence. He started practising in Singapore as a civil engineer in 1978 after obtaining his bachelor of engineering degree (civil-Hons) with a first class Honours degree. He obtained his Masters in construction engineering in 1981 and became a professional engineer in 1983.
23 During his inspection of the premises sublet to the plaintiffs, Mr Chai noted that some of the sumps in the said premises had since been sealed off. The area had been re-constructed following the damage of the premises by fire in 1993. He could see, however, from the site shown in the centre and bottom photographs in SBA103 and the sump inside the warehouse shown in the bottom photograph, that the sumps in the existing warehouse were connected to the sumps which were existing in the defendants's warehouse complex. He believed that the sumps were interlinked. Mr Chai then stated in his affidavit evidence in chief: "As such and given the pull of gravity, it would be quite impossible for water to overflow from any of the sumps without it occurring in other sumps in the building. Even if there was a chokage on any one part, the water would be re-channelled via the inter-linked drainage system to the outlet or discharge point. If a sump in the defendants' premises had overflowed, it would be certain that other sumps in the entire warehouse would have also overflowed at the same time." This opinion was predicated on the simple phenomenon that all being equal in the entire network of sumps and underground inter-linking pipes water find their common level. If a sump or sumps in the sublet units had overflowed, all other partitioned sections let out to many other subtenants would have had similar overflow and flooding. The employees of the defendants said that there were no other floods in the other partitioned sections within the same building.
24 The question whether water had "seeped into the floor from the cracks of the concrete floor" was also dealt with by Mr Chai. He had examined the floor of the building which was still existing. Unfortunately the drawings retrieved from the archives did not include the as-built plans. But he believed that the concrete floor was 9 inches thick. It was not a common practice to waterproof the ground floors for most buildings, whether residential, commercial or industrial except for areas such as toilets and balconies. This would be even more so in the case of factories and warehouses. This was particularly so because there was no reason for such waterproofing and the floor level was higher than the surrounding external levels.
25 More specifically, Mr Chai dealt with the opinion that water escaped from cracks in the drain pipe, which was first mooted by Mr Phua. Mr Chai tendered in court Sketch C. It showed a typical elevation view of a typical reinforced concrete sump which he had inspected at the site. The sketch also showed the ground level and the position of the external drain relative to it. The sketch further showed the likely cross section of the floor (ie the concrete slab), the hardcore layer below that, the compacted soil thereafter, and the underground drain pipe which was likely to be protected by a layer of concrete haunching and their respective dimensions. The drain pipes were found by him to be concrete pipes. Mr Chai expressed the view that it might be likely that a crack might have developed in the pipe, but he explained and firmly opined that it was unlikely for water to flow upwards from any crack in the pipe through the concrete haunching and the compacted ground and hardcore layers to the surface of the concrete slab . Mr Chai further opined that even if it did, it would have caused only minor dampness and would not have created a substantial pool of water or a flood. His expert views are acceptable to me because his reasoning, it seems to me, is unassailable.
26 These pieces of evidence in my judgment was a complete answer to the views in respect of the causes of rainwater ingress expressed by the plaintiff's expert, Mr Bruce Loggie, PW5 ("Mr Loggie") of Chartered Building Surveyor, who, after accepting without question that water was overflowing from the concrete floor at the two points mentioned by Mr Phua's report, went on to opine in his report of 4 September 1997 that "this defect (referring to the overflowing at the two points) indicates that the structural floor was not correctly waterproofed and that the drainage system was inadequate and not capable to allow rain and ground water to sufficiently flow away from the said premises."
27 I turn to the questions of additional water ingress via the ground floor sump and/or via the roof level in respect of the two floods. Even Mr Loggie, however, quite fairly and properly observed in his report as follows: "The loss adjuster's inspection was carried out a number of hours after the rainwater had stopped and therefore it has not/cannot (sic) been ascertained whether or not additional water ingress occurred via the ground floor sump and/or via the roof level".
28 As regards the valley gutters, I accept Mr Chai's evidence as convincing where for the reasons he gave and on the basis of the sketches A and B he had drawn he opined that the valley gutters "would be more than adequate to deal with even extremely heavy downpour and will almost certainly not overflow. I need not set out his calculations.
29 After a exceedingly long period of gestation, the plaintiffs' case eventually took the following form. I will summarise their main contentions. They drew attention to the constituent elements which form the entire drainage system, from the roof to the valley gutters and external gutters, the downpipes running into the warehouses which drain rainwater into the sumps and the channelling of the rainwater from the sumps into the underground pipes which, in turn, drain off out via the perimeter drain outside the building.
30 I next examine the assertion, which was stressed, that it was not possible to sever the system into the respective premises demised to the various subtenants. Since the flooding on both occasions followed a period of heavy rainfall the ingress of rainwater into the sublet units must have been caused by a failure of the non-severable drainage system.
30.1 The plaintiffs rely on the flooding which allegedly occurred near two sumps in the sublet units, which according to Mr Phua were at the back of section B. It was common ground that a square perimeter wall was built around the mouth of the sumps. The plaintiffs then argued that the walls were built to contain the water which might occasionally overflow the sump. If the perimeter walls had cracked, rainwater would have seeped or flowed through and flow onto the floor.
30.2 The plaintiffs relied on the documentary evidence in the form of an invoice of Degree Engineering dated 2 January 1991 (3BD241), the maintenance contractors of the defendants. The entries under item 2(c) referred to the repairs carried out to the sump in the plaintiffs' sublet units. There was recorded significantly in English a written notation: "Stump leakage" meaning sump leakage. The repairs were carried out after the second flood.
30.3 The same invoice further recorded under item 4 the supply of "labour, materials, equipments and tools to instal 6" PVC down pipes (2 Nos), also construct 2 nos of stumps - ie sumps - (4'x 3' and 5'x 4') at Amarnath warehouse". The contractors charged $1,450.00 for these works and materials. The plaintiffs contended that the defendants' maintenance officer and their contractors knew that rainwater had overflowed from the sumps in the plaintiffs' premises. That was why they repaired the sumps.
30.4 The plaintiffs further assert that the sumps were blocked at the sources of the underground pipes. The blockages were confined to the two sumps referred to in the evidence. It has to be observed that this analysis did not quite firm up during the plaintiffs' cross-examination of Mr Chai. If this analysis was made out, Mr Chai's opinions regarding the overflowing sumps did not stand in the way because Mr Chai was addressing an entirely different scenario. He was obviously addressing a situation where one or some of the underground pipes were choked. He was not opining where there was a complete or serious enough blockage at the two sumps, where the rainwater could not flow into the underground pipes, such that water overflowed. In this scenario, the debris at the bottom of the two sumps would have entirely or substantially hindered the flow of rainwater into the underground pipes connected to the debris. In other words, only 2 sumps were choked at the base without any flow, or uninterrupted flow, into the pipes. The blockages wre confined to the 2 sumps. What the plaintiffs were finally postulating in their written submissions was not put to Mr Chai. Mr Chai was not asked if he would adhere to his opinions on the assumed fact that the sumps near the flooding were choked by debris and rubbish such that rain water collected at the sumps were not able to be channelled through the subterranean concrete pipes and that such rainwater either seep through the cracks in the perimeter walls of the sumps or overflowed the sumps.
30.5 There was evidence under item 2(f) in the same invoice for the "clearance of debris for the stumps (sic) at Amarnath" at the charge of $150.00. I therefore find that a lot of debris, including wooden strips left over from the days when the plywood factory was there, were removed from the sumps after the second flood. As even postulated by the defendants themselves, it would not be far-fetched that the workers in the plaintiffs' sections might have used the sumps as rubbish chutes to dispose of their banana leaves and leftovers of meals. There had been no maintenance of the sumps and the walls before the two floods by either the defendants or the plaintiffs. On the question whether rainwater had overflowed from the two sumps, the answer is that viewing the evidence as a whole it probably did. Neither the plaintiffs nor the defendants had cleared the two sumps of the debris and rubbish before the second flood. There had been no maintenance.
30.6 There was also evidence that there were leakages of rainwater from the downpipes. As noted earlier, the defendants' contractors constructed two 6" PVC downpipes at "Amarnath warehouse" after the second flood. Item 2(h) in the same invoice stated there was "repair (to) the leakage for rainwater disposal pipe at Amarnath warehouse" at the cost of $120.00. The defendants' maintenance officer and their contractors' employee denied any leakages in the downpipes. Viewing the evidence as a whole, I am able to find that probably there were leakages of rainwater from the two downpipes which were replaced. Again, neither the defendants nor the plaintiffs had done anything to keep the two replaced downpipes in tenantable repair.
30.7 If this court had not pursued the matter and if the defendants had not been candid, the invoices would never have surfaced. Nobody thought the answers were to be found in the invoice: 3BD241.
(b) Of the textile damages
(i) First Flood
31 Mr Saminathan told the court that at an inspection of the textile, either on the evening of 21 June 1990 or on the following morning, no physical count was made because it was not physically possible to do so. He and the surveyor, Mr Phua, estimated that 1,844 bales were damaged. According to him, the final check established that 1,212 bales of textile had sustained damage. The adjusted losses were finally agreed at $295,183.63.
32 Mr Phua referred to a "trial uncovering of the bales" to get to the damaged bales of textile at the bottom. He said it took 44 mandays to shift 2,020 bales to reach 191 bales stacked at the bottom. The exercise confirmed that it would be uneconomical to carry out a 100% check. When he eventually opened up some of the bales of textile, the relatively cheap cloth had "already turned mouldy" since the first flood. An interim check by him revealed that 1,234 bales were, by and large, affected by the flood water. His final check reduced the figure to 1,212 bales.
33 In the loss adjusters' first report dated 22 June 1990 (2BD290) it was noted that 4,600 bales of cloth were wetted. They put down the estimated reserve for the guidance of the insurers at $700,000. The adjusters prepared a second report dated 5 July 1990, about one month after the first flood. Damage to the textile happened in sections A, B and C. It was noted that those bales of textile which were stacked on pallets were not damaged. The third report was made 5 months after the first flood and three months after the final inspection of the damaged textile in August 1990. The delay was due to the plaintiffs' failure to supply 15 men to unstack and count the damaged bales; they only supplied 5 to 10 men between 2 to 6 August 1990. The forklift was not used to assist in the handling of the bales of textiles because it was engaged in the plaintiffs' ordinary movement of their other goods. In fact, the first trial uncovering was only done between 2 and 6 August, 1990 and the final survey was only completed by 18 August 1990. I have to say that the delay was totally unacceptable and the results of the inspection were unreliable. Most of the bales of textile were stacked 15-23 bales high and most of them were not stacked on 6-inch pallets separating them from the floor.
34 There were several questions over the computation of the damages. The former Chief Executive Officer of the insurers at the written request of the plaintiffs agreed to a 20% addition to the stock value on the ground that the prices were going up. No documentary evidence was found in the insurers' file and the insurers' manager, Mr Tan Hue Ping (PW1) could not assist. There was evidence that the plaintiffs had a "slow moving" component which Mr Saminathan put at about 5% per year. One could reasonably wonder how much of the old stock was carried over from the plaintiffs' previous warehouse in PSA. There is one other feature: I have no doubt that the loss adjustments were carried out rather casually. I had the distinct impression that the loss adjustors were too quick to yield and compromise with the plaintiffs. This less than the usual careful and rigorous assessment of the damages, accompanied by the long delays, was linked to the fact that the principal person behind the plaintiffs was also at the material time a director of the Board of Directors of the insurers of the plaintiffs.
34.1 The issue of the plaintiffs' contributory negligence was raised by the defendants. In February 1990, a water pipe burst and bales of textiles in section B were damaged by water. Mr Pang, the General Manager of the defendants, told the plaintiffs to stack the bales of textiles on a layer of 6-inch pallets which would have effectively protected the bales of textiles from the 4-inch deep of water.
34.2 For the reasons hereinafter appearing, I will be deciding that the defendants are not liable for the alleged losses of the plaintiffs. Assuming that the defendants are liable, I proceed for the sake of completeness to assess the damages. Having regard to all the evidence, the salient features of which have been highlighted, I would only allow the plaintiffs 50% of their claims in respect of the damages suffered during the first flood. Interest could be awarded at 6% p.a. as from 16 June 1997 after the crucial amendments of the statement of claim. As regards the question of costs, they had lost on several issues. The plaintiffs' actions, which were in effect those of the insurers, lacked the drive, focus and thoroughness which would have disclosed that the causes were from the two individual sumps and the down pipe. There was no general overflowing at all the sumps. The absence of any other claims from the other sub-tenants who rented units within the enormous complex indicated strongly that the floods were confined to the two sumps. The evidence of the loss adjustor, Mr Phua, and those of Mr Loggie, alleging seepage of water from the floor, did not bear any reasonable scrutiny, which at any rate was not done in this case. Accordingly, there should be no order as to cost.
(ii) Second Flood
35 Immediately after the second flood only 191 bales were identified to the loss adjustors as damaged out of the 652 bales submitted for checking. During the inspection, only 388 bales were identified as damaged. The checking of the number of damaged bales was hampered because no steps were taken at all to remove them into the open for proper stock taking. It was only in June 1991, six months after the second flood, that a stock check was carried out. By then the textiles had turned mouldy and emitted a foul smell. Mr Phua identified 797 bales as damaged. He confirmed that none of the damaged textiles were from those damaged in the june 1990 flood. The loss was quantified at US$85,957.98. A sum of US$5,157.49 was added to take into account the delivery expenses, handling charges and other overheads. A further US$955.00 was incurred for repacking 191 bales of textiles. A 10% salvage value amounting to US$8,595.80 was claimed and deducted by Mr Phua. The loss was therefore quantified at US$83,474.67.
36 There were a number of unsatisfactory and unacceptable features in the ascertainment and assessment of the damages. The final claim of 797 bales escalated from the first count of 191 bales which was itself increased to 388 bales which Mr Phua described as the "original claim". The long delay of two months for the first count and of 6 months for the final count were far too long, and all the more so for the final count. Left in stacks of between 15 and 25 bales high, I could not tell how much was the further damage and contamination which had occurred because they were left, as they were, in a pile. After the first flood, the loss adjustor, Mr Phua, and Mr Pang had advised the plaintiffs' servants to stack the bales of textiles on 6-inch pallets which was a simple matter and which would have effectively prevented the rainwater damage after the second flood. The plaintiffs did not stack the bales on pallets. Mr Saminathan confirmed this. The entire exercise of adjustment was so casual that one could not help but reject the adjustments.
37 In the circumstances, the plaintiffs failed to prove their losses.
38.1 Finally, there is one other complication which has arisen by reason of the time-bar defence and which the plaintiffs are unable, in my view, to overcome. I should explain further the circumstances (under which) I made the unusual order of allowing the amendments subject to the condition that the defendants could still plead the time-bar defence. In other words, I suspended the operation of the rule that allowing the amendment would allow the averments to date back from the date of the writ of summons. The factual allegations were extremely hazy at the relevant time. Only one tenancy agreement and damages in section B were alleged; nothing else. The court was not even given a layout of the sublet units in question in relation to the entire warehouse. The drainage system was not described and no attempt was made to elucidate these details to facilitate understanding. On the first day of the trial on 24 February 1997, which was initially fixed for 5 days, Mr Andre Yeap very candidly told the court what his defences were and his understanding of the departures of the plaintiffs' case, as pleaded, and as opened. Mr Niru Pillai asked for an adjournment to 26 February 1997, no doubt to get up the case further. On the following day, the trial had to be adjourned because Mr Niru Pillai's family suffered a bereavement. The plaintiffs were directed to file the application for an amendment within 14 days, ie by 10 March 1997. The application was filed only on 12 March 1997. When the application was heard on 9 April 1997 I rejected it as the averments were still unclear as to the sources and causes of the ingress of the rainwater. The amendments finally took some coherent form on 26 May 1997 when I allowed the amendments subject to the condition, as I was anxious to get on with the trial.
38.2 As noted earlier, the claims in the two suits related only to damages to the bales of textile which were stored and damaged in section B, the largest of the three sublet units. The damages were sustained in June and December 1990. It was only on 16 June 1997 that the plaintiffs sought to amend their claims to include damages to the bales of textiles which had taken place in sections A and C and which were let under two separate leases. The difficulty is that the alleged damages, as adjusted between the loss adjusters and the plaintiffs, covered all the damaged bales of textiles in sections A, B and C; they were never separated. This court is therefore left in a position where it is unable, on the evidence, to say with any degree of confidence that the number of damaged bales of textiles in section B would be an amount certain. Though the amendments were allowed on 26 May 1997 they were allowed expressly on the condition that the defendants could raise their time bar defence, if any.
Liability
(a) Covenant for quiet enjoyment & covenant to repair under cl 4(k)
39 The plaintiffs contend that the defendants are liable for the losses sustained in the two flood by reason of their breaches of their covenant under cl 7(b) that the plaintiffs "shall peaceably hold and enjoy the sublet premises...without interruption by the landlord...". They rely on a number of cases, two of which I will discuss are Tennant Radiant Heat Ltd v Warrington Development Corporation [1988] 1 EGLR 41 and Wisma Development Pte Ltd v Sing-The Disc Shop Pte Ltd [1994] 3 SLR 295.
40 In my judgment, the damages to the textiles were not caused by any breach on the part of the defendants. Under cl 4(k) of the leases, the plaintiffs agreed "to keep the sublet premises in tenantable repair" and on the termination of the leases "to yield up the sublet premises in tenantable repair." The first question is whether the two sumps and the offending down pipe were part of the "sublet premises." In my view, the answer is in the affirmative. They were at all material times in the possession and control of the plaintiffs. Secondly, they were physically within the sublet premises; nobody had any right to enter and access them without the authority of the plaintiffs. Thirdly, as a matter of fact, they were easily accessible to the plaintiffs as the sub-tenants for the purposes of any inspection and, if necessary, repairs which the plaintiffs might want to carry out. The sumps too could be inspected to see if the underground pipes connected to them were in any way blocked. By design, the bases of the sumps were lower that the bottom level of the underground pipes. If debris and rubbish were accumulating, they could easily be detected during an ordinary inspection. The fact was nobody on behalf of the plaintiffs had bothered about the sumps nor had anyone bothered about the soundness of the down pipes.
41 As I had found earlier, the plaintiffs did not inspect, let alone, repair the down pipe and the two sumps in question. Their failures caused the ingress of rainwater which damaged the textiles. They were therefore in breach of the absolute repairing covenant in the leases.
42 I deal with the case of Tennant Radiant Heat Ltd (supra). The Corporation was the owner of a warehouse building in Warrington, UK. Tennant Radiant was a lessee of a unit within the warehouse which had an enormous roof. Water had accumulated on it and that part of it above the lessee's unit collapsed, causing damage to the lessee's goods. The trial judge held, in favour of the lessee, that the roof over the lessee's unit was not part of the demised premises. This finding was reversed by the Court of Appeal which held that the roof on top of the lessee's unit was part of the demised premises and that the lessee was in breach of the covenant to repair. But on the lessee's claim for damages for negligence and nuisance, which were based on the fact that the outlets of the roof were blocked by the droppings and feathers of seagulls, the lessees succeeded because those outlets were in the possession and control of the lessor. It is evident that as an example of a piece of interpretation of the meaning of "demised premises" it is against the plaintiff and, as a matter of distinction on the point of possession and control, it makes a difference in favour of the defendants.
43 As to Wisma Development, again it is of no assistance to the plaintiffs. The fire hose reel from which water had leaked and damaged the tenant's property was located in the landlord's property adjacent to that held by the tenant under the lease. The proximity gave rise to the duty of care for securing the fire hose and its breach cause the damages which were recoverable.
(b) Exclusion under cl 4(i)
44 Even if the defendants had been negligent, I am of the view that clause 4(i) of the leases in clear terms absolves them from liability for negligence. The clause starts off referring to the responsibility of the tenant to insure its own property but, unlike the clause in the case of Wisma Development, it does not stop there but goes on to say that "the Landlord shall not be liable for any damage to or loss of the Subtenant's property however occurring."
45 The case of Marina Centre Holdings Pte Ltd v Pars Carpet Gallery Pte Ltd [1997] 3 SLR 625 is instructive. Cl 36.1 of the tenancy agreement in question provides: "It is hereby agreed between the Landlord and the Tenant that the Landlord and its officers...shall not be liable or in any way responsible: ...(b) for any injury or damage ...resulting from short circuit of electrical wiring,...rain plumbing or other pipe...or any appurtenances being out of repair unless caused by the wilful misconduct of the Landlord or its officers...". A chilled air-conditioning pipe within the false ceiling of a neighbouring unit had given way and this resulted in pressurised water seeping through the corridors and into the tenants' premises causing damage to their goods. The Court of Appeal in ruling that the words in cl 36.1 were wide enough, in their ordinary meaning, to exempt the landlord from their liability in negligence stated in para 22 the following, among other things: "Wilful misconduct is far beyond any negligence, and necessarily implies that the person responsible for wilful misconduct knows and appreciates that it is wrong conduct on his part in the circumstances to do or omit to do a particular thing, or acts with reckless carelessness, not caring what the results of his carelessness may be."
(c) Concurrent liability in contract and tort
46 On the assumption that the defendants were negligent, the plaintiffs contended that their cause of action founded in negligence would neutralise the operation of the exception in cl 4(i). This line of reasoning is flawed. Oliver J. (as he then was in Midland Bank Trust Ltd v Hett Stubbs & Kemp (a firm) [1978] 3 All ER 571, followed by Le Dain J. in the Canadian case of Central Trust Co v Rafuse (1986) 31 DLR (4th) 481, ruled that "(a) concurrent or alternative liability in tort will not be admitted if its effect would be to permit the plaintiff to circumvent or escape a contractual exclusion or limitation of liability for the act or omission that would constitute the tort." They went on to stipulate that subject to this qualification, where concurrent liability in tort and contract exists the plaintiff has the right to assert the cause of action that appears to be most advantageous to him in respect of any particular legal consequence; for eg a claim in tort if a time-bar defence may be skirted. This was approved by the House of Lords in Henderson and others v Merrett Syndicates Ltd & Ors [1994] 3 All ER 506, at 530 e-f per Lord Goff.
(d) Waiver
47 Finally, I turn to the plaintiffs' submission that even if cll 4(i) and (k) bear the meanings ascribed to them by the defendants they are precluded by the doctrine of waiver from claiming that they are not responsible for the plaintiffs' loss and damage due to their failure to repair and maintain the drainage system. So far as cl 4(k) is concerned, the effect of the plaintiffs' submission is that the defendants had also assumed the obligations to maintain and repair the sublet premises. I am unable to see the basis for this extension.
48 In this regard, I accept the evidence of Mr Pang that the defendants did carry out repair if asked by the tenants purely out of goodwill, unless any damage was wilfully caused. What the defendants had done by way of repairs before each of the two floods were not significant and did not constitute any basis whatsoever to support the assertion that they had waived their rights under the two clauses. The plaintiffs rely on Png Siaw Luan v Wong Tui San [1990] SLR 643. The facts in the instant case has no resemblance with the conduct in that case which was regarded, not unexpectedly, as unconscionable.
49 The plaintiffs' claims are therefore dismissed with costs.
Sgd: Lai Kew Chai J
Judge
Lai Kew Chai J
N K Pillai and Liew Teck Huat [Niru & Co] for the plaintiffs
Andre Yeap and Damien Yeo [Allen & Gledhill] for the defendants
Back to Top

This judgment text has undergone conversion so that it is mobile and web-friendly. This may have created formatting or alignment issues. Please refer to the PDF copy for a print-friendly version.

Version No 1: 20 Nov 2026 (00:35 hrs)