Yeo Yoke Mui v Kong Hoo (Private) Ltd and Another
[1998] SGHC 377
Suit 1236/1997
Tan Lee Meng J
18 November 1998
Judgment :
Cur Adv Vult
The plaintiff, who agreed to purchase a corner terrace house from the first defendants for $1,960,000.00, sought a declaration that the agreement for the sale and purchase of the property had been rescinded. She also claimed that she was entitled to a refund of the 10% of the purchase price paid by her to the first defendants before she decided to annul the contract. Apart from suing the first defendants, the plaintiff also sued her solicitor, the second defendant, for negligence with respect to his handling of her intended purchase of the said property. The first defendants, who filed a counterclaim against the plaintiff, confirmed during the course of the trial that they were only claiming damages from the plaintiff for her alleged failure to perform her contractual obligations under the contract for the sale and purchase of the property. The second defendant, who also filed a counterclaim against the plaintiff with respect to conveyancing fees, withdrew his counterclaim towards the end of the trial.
A. BACKGROUND
2. The plaintiff viewed No. 93, Cashew Terrace, a corner terrace house, with her housing agent, Lee Keng Song, on a number of occasions. On each of these occasions, the first defendants’ manager, Wong Wee Keong, was present.
3. The first defendants wanted $2 million for the property, which was affected by a splay corner of 6 x 6 square metres. This corner of the property had to be set aside for road widening purposes if the plaintiff redeveloped the property or when required by the relevant government authority. The plaintiff used the splay corner as a bargaining chip to have the purchase price reduced to $1.96 million. In view of this, Wong wanted an additional clause, clause 16, to be included in the option. This clause, which was in Lee’s handwriting, provided as follows:
The purchaser is fully aware of the road reserve shown on the PWD plan provided by the Vendor.
4. The option, which was dated 11 March 1997, was sent to the plaintiff’s solicitor, the second defendant, a few days later. On 15 March 1997, the second defendant wrote to the plaintiff to confirm that he had received the option. He noted that there was an additional clause 16 in the option. He added that he was making searches on the property and that pending the perusal of the road interpretation plan, he was unable to comment on the extent of the road reserve disclosed to her.
5. On 26 March 1997, the second defendant wrote to the plaintiff after he received the road interpretation plan from the relevant authority. In this letter, he pointed out that the property was affected by a category 4 road and enclosed the road interpretation plan. According to the second defendant, the road interpretation plan which was sent to the plaintiff included some explanatory notes on the meaning of a "category 4 road". The plaintiff denied having received the explanatory notes.
6. The fact that one of the roads bordering the property, namely Cashew Road, is a category 4 road was important if the plaintiff intended to extend the size (hereinafter referred to as "redevelop") of the terrace house. This is because where there is a category 4 road, there is presently a 7.6 metre wide buffer zone between the limit of the road reserve and the building line. A house cannot be extended into the buffer zone. As the wall of the terrace house facing Cashew Road was at the edge of the buffer zone, this meant that there could be no extension of this side of the house.
7. The plaintiff, who claimed that she wanted to extend the side of the terrace house facing Cashew Road, complained to the second defendant on 28 May 1997 that she had not been advised that the property could not be redeveloped in the manner she wanted before she exercised the option and paid the balance of the first 10% of the purchase price to the first defendants on 2 May 1997. On the plaintiff’s instructions, the second defendant, who denied that he did not inform the plaintiff of the significance of the category 4 road bordering the property, wrote to the first defendants’ solicitors on 30 May 1997, to annul the sale and purchase of the property on the ground that the property was adversely affected by a category 4 road, a category 5 road and a splay corner.
8. The first defendants’ solicitors replied on 3 June 1997 that the plaintiff was not entitled to annul the sale and purchase agreement as she was aware that the property was affected by the splay corner and that one side of the property faced a category 4 road. As such, the first defendants demanded that the plaintiff fulfil her contractual obligations with respect to the purchase of the property. Subsequently, the plaintiff instituted legal proceedings against the first and second defendants.
B. PLAINTIFF’S CLAIM AGAINST THE VENDOR
9. The plaintiff’s case against the first defendants depends on whether she had a right to annul the agreement for the sale and purchase of the property. The last paragraph of her solicitor’s letter of 30 May 1997 to the first defendants’ solicitor provided as follows:
In view of the fact that the property is adversely affected by Categories 4 and 5 Road and [Splay] Corner of 6 x 6 sq. m. as shown in the Road Interpretation Plan delivered herewith, we are now instructed to and do hereby give you notice that our client is annulling the sale and purchase herein pursuant to Clause 10 of the said Option. Please therefore advise your clients to refund the option money of $19,600.00 and the balance of 10% deposit of $176,400.00 forthwith to our client, failing which we shall have to apply to the Court for an order to compel your clients to do so with interest thereon and costs.
10. The plaintiff was aware that there was a splay corner when she signed the option and the category 5 road in question did not affect the property in a manner which entitled the plaintiff to annul the contract for the sale and purchase of the property. As such, only the presence of the category 4 road has to be considered. The plaintiff claimed that before she was given the option, she informed the first defendants’ manager, Wong, who signed the option on behalf of the first defendants, that she intended to extend the size of the terrace house. She thus asserted that she was entitled to annul the agreement for the sale and purchase of the property because she could not extend the house on the side which faced the category 4 road.
11. The plaintiff has not established that it was a term of her contract with the first defendants that she would only purchase the property if she could redevelop it. Nothing was stated in the contract for the sale and purchase of the property about the redevelopment of the property. In this context, reference ought to be made to Tatlien Hardware Pte Ltd v Tan & Anor [1980-81] SLR 472, 473, where, when referring to a contract for the sale and purchase of property which made no reference to the question of redevelopment, Wee Chong Jin CJ said:
This is the case of a contract for the sale of land. The contract contained no express provision or condition that it was being purchased for redevelopment. There can be no inference that the intending purchaser was purchasing the property for redevelopment. There can be no implied term that the contract was conditional upon the property being capable of redevelopment or that, if it could be redeveloped, there would be no scheme affecting its redevelopment.
12. Apart from there being no term in the contract regarding the redevelopment of the property, the plaintiff has also failed to prove that she told the first defendants’ manager, Wong, that she intended to redevelop the property. Wong categorically denied that the plaintiff told him that she intended to redevelop the property. His evidence is supported by Lee, the plaintiff’s own agent, who was present whenever the plaintiff had discussions with Wong. When cross-examined by the first defendants’ counsel, Lee’s answers (N/E 50) were as follows:
Q. Did you tell Wong that plaintiff wanted to redevelop the property?
A. No.
Q. Did plaintiff tell Wong?
A. I don’t think Wong was told.
13. It is also worth noting that in the plaintiff’s solicitor’s letter dated 30 May 1997, which sought to annul the contract for the sale and purchase of the property, nothing was said about Wong having been informed that the plaintiff intended to redevelop the property.
14. The plaintiff also contended that she was entitled not to proceed with the purchase of the property because of clause 10(d) of the option, which provided as follows:
Subject to clause 10(c) hereof, any interpretation plan showing that the property or any part thereof is affected by any road or drainage proposal or reserve and the area of such proposal or reserve is not more than five (5) per cent of the land area of the property shall not be deemed to be an unsatisfactory reply and shall not entitle the Purchaser to annul the sale and purchase herein PROVIDED THAT if the area of such proposal or reserve is in excess of five (5) per cent of the land area and of the property, the Purchaser shall be entitled (i) to annul the sale and purchase herein in the manner aforesaid OR (ii) subject to the agreement of the Vendor, to claim a corresponding adjustment of the purchase price for the difference in excess of the five (5) per cent of the land area of the property calculated at the rate the Purchaser paid for each square metre of land.
15. In his written submissions, the plaintiff’s counsel asserted as follows:
[T]he land between the line of road reserve on Cashew Road and the building line of the Property is a Buffer. It is also clear that the line is a safe guarded line of Road Reserve. It is the Plaintiff’s submission that the buffer affects the land …. The buffer comes into existence by reason of the safe guarding line which by definition is a line of Road Reserve. To argue that this has never been raised before does not weaken the point. There is always a first time.
Reading paragraph 10(d) of the Option, it is submitted that the land is affected by a line of road reserve … and that the affected portion is at least 43% of the whole of the plot. It follows that the Plaintiff is entitled to annul the sale.
16. This argument cannot be taken seriously. Clause 10(d) of the option refers to property which is affected by "any road or drainage proposal or reserve". By no stretch of imagination can the buffer zone be regarded as a road or drainage proposal or reserve. The plaintiff’s own witness, Tang Tuck Kim, an experienced surveyor, did not support her position. When questioned by the first defendants’ counsel, he replied as follows: (N/E 62)
Q. Would you say property affected by any road reserve other than splay corner?
A. No.
Q. Looking at the plan, is property affected by road proposal other than splay corner?
A. Not affected by road proposal other than splay corner.
17. The plaintiff’s action against the first defendants is thus dismissed with costs. The first defendants succeed in their counterclaim for damages for the plaintiff’s breach of contract. The damages will be assessed by the Registrar.
C. PLAINTIFF’S CLAIM AGAINST HER SOLICITOR
18. The plaintiff’s allegation of negligence against the second defendant, her solicitor, is stated in paragraph 18 of her statement of claim as follows:
In breach of contract and in tort, the 2nd Defendant negligently failed to do the following:
(a) the 2nd Defendant failed to explain and/or advise the Plaintiff the meaning and effect of the categories 4 and 5 roads which affected the Property.
(b) the 2nd Defendant failed to warn and/or explain to the Plaintiff the dangers or risk of releasing the 10% deposit to the 1st Defendants directly rather than to have [the first defendants’ solicitors] hold the same as stakeholder, particularly in view of the fact that the 1st Defendants are a private limited company.
Releasing the 10% deposit to the first defendants
19. The second of the plaintiff’s above-mentioned allegations of negligence on the part of the second defendant will first be considered. This concerns the plaintiff’s payment of the balance of the 10% deposit. It was not clear from the option whether this sum was to be paid to the first defendants or was to be held by their solicitors as stakeholders. The second defendant should have clarified the position with the first defendants’ solicitors as soon as he received the option but he did not do so. When the plaintiff required an extension of the date for exercising the option from 30 April 1997 to 3 May 1997, the first defendants agreed to the extension but required the balance of the 10% deposit to be paid to them. Following this, the second defendant wrote to the plaintiff on 25 April 1997 to say that the option did not state whether the balance of the 10% of the purchase price was to be held by the vendor’s solicitors as stakeholders or was to be paid directly to the vendors and to seek the plaintiff’s instructions with respect to the first defendants’ request for the money to be paid directly to them. On 2 May 1997, the second defendant, who claimed to have received no instructions from the plaintiff with regard to this matter, forwarded a cashier’s order for $176,400.00 to the first defendants’ solicitors. Although the cashier’s order was made payable to the first defendants’ solicitors, the second defendant did not state that the money was to be held by the first defendants’ solicitors as stakeholders. In due course, the first defendants received the money from their solicitors.
20. The plaintiff’s position with respect to the failure of the second defendant to warn her of the risks of releasing the 10% deposit to the first defendants is evident from paragraph 21 of the statement of claim, which provided as follows:
As a result of the 2nd Defendants’ breach and/or negligence as aforesaid, the Plaintiff may suffer loss in that she may not be able to recover the said 10% deposit from the 1st Defendants as they may be unable to pay the same.
21. The plaintiff has suffered no loss as a result of the second defendant’s failure to advise her properly on the advantages of having the money held by stakeholders. This is because she is not, for reasons already stated, entitled to annul the contract for the sale and purchase of the property with the first defendants. As such, whether the money was paid to the first defendants or to the first defendants’ solicitors as stakeholders, the plaintiff is not entitled to a refund of the ten per cent of the purchase price. The plaintiff’s rights against the second defendant must thus be considered with respect to the plaintiff’s other allegation of negligence, namely that she had not been properly advised on the effect of the category 4 road on the property.
Whether the second defendant had done enough to alert the plaintiff to the effect of the category 4 road
22. The plaintiff’s case is that if the second defendant had explained the effect of the category 4 road to her, she would not have exercised the option because she intended to buy the corner terrace house for the purpose of redeveloping it. Consequently, she claimed an indemnity from the second defendant to the extent of the amount not recoverable by her from the first defendants.
23. The second defendant is required to use reasonable care and skill in giving advice to the plaintiff. His duty of care must be viewed in relation to what he was instructed by the plaintiff to do and whether or not the plaintiff told him about her plan to redevelop the property before she exercised the option.
24. A question arises as to whether the plaintiff had any intention to redevelop the property before she exercised the option. If she did not, the question of her having told the second defendant that she intended to redevelop the property does not arise. The plaintiff has not furnished any convincing evidence that she intended to redevelop the property. In fact, her evidence clearly damaged her case. To begin with, although the plaintiff claims to have told three persons, namely her own agent, Lee, the first defendants’ manager, Wong, and the second defendant about her redevelopment plan, all three of them denied having any knowledge of her plan. While it may be in the interest of Wong and the second defendant to deny any knowledge of the plaintiff’s alleged redevelopment plan, it is important to note that the plaintiff’s own witness, her agent, Lee, did not support her position.
25. The plaintiff asserted that Lee knew about her plan to redevelop the property. When she was questioned by her own counsel (N/E 38), she reiterated her position in the following terms:
Q. Did you tell Mr. Lee what was the purpose of buying a corner terrace house?
A. To utilise the land by extending it.
Q. When you first met Wong, did you or Mr. Lee explain to Mr. Wong why you wanted the house?
A. Yes.
26. However, Lee gave evidence to the effect that when the plaintiff signed the option, all she had in mind was relatively minor renovation work, which required the attention of an interior designer and not an architect. When cross-examined by the first defendants’ counsel, Lee gave the following answers:
(N/E 48-49)
Q. Did you know of plaintiff’s plan to renovate the place?
A. Yes….
Q. What did she tell you?
A. She wanted to change front porch. Break down side wall to open to garden….
Q. Which side wall?
A. The one facing Cashew Road. She wanted to have a glass door instead of a wall….
(N/E 52)
Q. Knowing of plaintiff’s plans, you thought she did not need planning permission?
A. Not unless there is a structural change.
Q. Did you know that the plan included any structural change?
A. No, she was going to get interior designer….
27. If the plaintiff did not tell her agent, Lee, or the first defendants’ manager, Wong, that she was going to have the property redeveloped, it is quite unlikely that she would have told the second defendant that she intended to redevelop the property. In any case, her evidence with respect to the second defendant’s knowledge of her alleged redevelopment plan is not very convincing. When cross-examined by the second defendant’s counsel, she said as follows:
(N/E 22)
Q. When was the first time you saw [the second defendant] after the option?
A. Can’t remember.
Q. Perhaps 2 May?
A. Yes.
Q. He saw you just before option was exercised [on 2 May]?
A. Yes.
Q. When was the first time you told [the second defendant] you intended to redevelop this property?
A. Cannot remember.
Q. Did you communicate to him before 2 May that you wish to extend property?
A. I did.
Q. In writing?
A. I cannot remember.
(N/E 27)
Q. Did you at any meetings with Mr. Ng prior to 2 May say that you wanted to purchase Cashew Terrace to redevelop?
A. Can’t remember.
28. Apart from not having told Lee, Wong or the second defendant about her redevelopment plan, the plaintiff gave inconsistent evidence with respect to when she first learnt about the requirement of approval from the relevant authority for her alleged redevelopment plan. When cross-examined by the first defendants’ counsel, she said: (N/E 7)
Q. When did you know about requirement of approval?
A. When my architect informed me.
The plaintiff admitted that she instructed her architect only after the designer had completed the design for her renovation (N/E 8). As such, the plaintiff contradicted herself when she gave the following answer to a subsequent question posed by the first defendants’ counsel: (N/E 8)
Q. Your evidence that you did not need approval until designer/architect told you is not true?
A. Designer told me PWD must give approval for such type of renovation. (emphasis added).
When questioned by the second defendant’s counsel, the plaintiff reiterated that prior to the designer telling her, she did not know that she required planning permission for extending the terrace house. (N/E 20)
29. Apart from contradicting herself with respect to when she first learnt of the requirement of approval for structural changes, the plaintiff’s evidence on the role of the architect leaves much to be desired. When cross-examined by the first defendants’ counsel, the plaintiff gave the impression that she consulted her architect very soon after collecting the keys on 5 May 1997. Her answers were as follows:
(N/E 8)
Q. When did you instruct your architect?
A. Upon collecting the keys.
Q. When?
A. After 5 May….
(N/E 12-13)
Q. When did you instruct your architect to send plans for approval?
A. Can’t remember….
Q. You knew that architects have not submitted plans?
A. He has submitted already and was rejected.
Q. But see AB88. Shows architect did not mention he has submitted plans?
A. Yes.
Q. Did you receive letter from architect saying plans have been submitted?
A. No.
30. The plaintiff must be taken to task for claiming that redevelopment plans were submitted by her architect to the relevant authority and that the plans were rejected. No plans were submitted to the relevant authority. The plaintiff admitted that she engaged the architect after her designer showed the design plan to her on 20 May 1997 (N/E 19). In fact, she subsequently accepted that she saw the architect around 22 May 1997. On that day itself, the architect informed her in writing that her proposed redevelopment plan will not be accepted because it encroached on the buffer zone. Why would the architect waste his time on drawing plans and submitting the plans to the relevant authority when he knew on the day he was instructed that the plans will not be approved?
31. The second defendant gave unchallenged evidence on the role of the architect. When questioned by the plaintiff’s counsel (N/E 97), the second defendant replied as follows:
Q. Why do you think she went to an architect?
A. We went because she had decided to annul the sale and we needed figures.
Q. She went to an architect?
A. She went to a designer. The purpose of calling architect was to give us ammunition for an annulment.
When asked by his counsel why the architect was hired, the second defendant reiterated his position (N/E 104) as follows:
Q. What was the real reason for hiring of architect?
A. It was 28 May 1997. We were going to rescind the contract. We need an architect or chartered surveyor to help. She agreed to get her own architect to help.
Evidently, the architect had not been hired to prepare a renovation plan or to apply for planning permission. The architect had merely been asked to provide the plaintiff with a back-dated letter for the sole purpose of helping her to annul the contract of sale and purchase of the property by showing how much of the land fell within the buffer zone.
32. After considering all the circumstances, I do not accept that when the plaintiff exercised the option to purchase the property, she intended to redevelop it. Furthermore, it has not been established that the second defendant was informed by the plaintiff that she intended to redevelop the property. In view of this, whether or not the second defendant had done enough to advise the plaintiff on the effect of the category 4 road will be considered on the basis that the plaintiff had no intention of redeveloping the property when she exercised her option and that the second defendant had not been informed by the plaintiff that she intended to redevelop the property.
33. The second defendant claimed to have pointed out the significance of the category 4 road to the plaintiff on two occasions. The first was when he wrote her a letter on 26 March 1997 and the second was when he met her in his office on 2 May 1997. The plaintiff denied that the second defendant gave her any advice with respect to the category 4 road when she saw him on 2 May 1997. The second defendant kept no proper notes of the meeting on 2 May 1997 and, on the basis of the evidence furnished, it cannot be assumed that his recollection of what he said at the meeting is correct. As such, the relevant question is whether the second defendant had done enough to point out the significance of the category 4 road to the plaintiff when he sent her the letter dated 26 March 1997, which included the following paragraphs:
We enclose herewith a copy of the Road Interpretation Plan relating to the above matter for your perusal.
Please note that it is affected by Categories 4 and 5 Road Proposal.
34. The second defendant and his secretary testified that the road interpretation plan sent to the plaintiff included explanatory notes, which explained the significance of a category 4 road and the width of the required buffer zone. The plaintiff admitted that she received the letter dated 26 March 1997 but denied that the explanatory notes were enclosed. If the plaintiff did not receive the explanatory notes, she could have but did not ask for a clarification of the second paragraph of the letter, which made it clear that the property was affected by a category 4 road. Her response to questions by the second defendant’s counsel with respect to her failure to seek a clarification of the letter (N/E 24) are as follows:
Q. You read the letter?
A. Yes.
Q. You did not understand what this meant?
A. Yes.
Q. Why did you not think to ask?
A. I trust that if this is an important issue, he would discuss it with me.
Q. But the letter says it is affected?
A. As a layman, I would not understand this implication.
Q. You are not entirely helpless. You could have asked.
A. Because the words "Category 4" are printed outside my property, I thought this letter was not very important.
35. The plaintiff accepted that she was a cautious person. She was cautious enough to demand a search to determine whether Wong had authority to act on behalf of the first defendants and had insisted on a verification by the first defendants’ lawyers that the first defendants had authorised Wong to act on their behalf. Furthermore, when she discovered from the valuation report that the property was not a freehold property but was leased for 999 years, she was astute enough to ask whether this could be used to seek a further discount on the price of the property. It is thus difficult to believe that the plaintiff would not have sought a clarification of paragraph 2 of the second defendant’s letter of 26 March 1997, which stated that the property was affected by a category 4 road, if the explanatory notes had not been included. I hold that the explanatory notes were included with the second defendant’s letter of 26 March 1997.
36. Two experienced conveyancing lawyers gave evidence as to what lawyers usually do with respect to road interpretation plans and category 4 roads. Before considering their views, it is pertinent to bear in mind the following words of Oliver J. in Midland Bank v Hett, Stubbs & Kemp [1979] 1 Ch 384, 402:
Clearly, if there is some practice in a particular profession, some accepted standard of conduct which is laid down by a professional institute or sanctioned common usage, evidence of that can and ought to be received. But evidence which really amounts to no more than an expression of opinion by a particular practitioner of what he thinks that he would have done had he been placed, hypothetically and without the benefit of hindsight, in the position of the defendants, is of little assistance to the court; whilst evidence of the witnesses’ view of what, as a matter of law, the solicitor’s duty was in the particular circumstances of the case is, I should have thought, inadmissible, for that is the very question which it is the court’s function to decide.
37. If Oliver J.’s words are borne in mind, it may be useful to determine the practice in Singapore with regard to informing clients about the effect of a category 4 road. Mr. Lim Sin, a senior conveyancing lawyer, who has been practising since 1969, explained that it is important to note whether a property is purchased for development or redevelopment or for use in accordance with its existing use. Examples of the first type of property are vacant land and buildings with a very substantial land area. In his view, such properties are likely to be purchased for the purpose of development or redevelopment and a lawyer should therefore explain to the purchaser what is meant by a category 4 or 5 road proposal. The lawyer would not, even if not told that the property was purchased for development or redevelopment, have performed his duty to the purchaser by merely informing him that the property in question is affected by a category 4 or 5 road.
38. Mr. Lim Sin stressed that the position is different in the case of terrace houses, semi-detached houses and individual apartments. It is extremely unlikely that such properties are purchased for redevelopment and lawyers generally assume that they are purchased for a use in accordance with their existing use. The continued use in accordance with the existing use of the property, including renovations to the property, is not affected by a category 4 or 5 road. As such, unless the purchaser has informed the lawyer that the property has been purchased for the purpose of redevelopment, a lawyer in Singapore acting for such a purchaser generally sends copies of the road interpretation plan, together with the accompanying explanatory notes to the client, and merely advises the purchaser that the property is affected by a category 4 or 5 road. This is what the second defendant has done in this case.
39. When asked whether he would make remarks on a buffer zone, Mr. Lim Sin said that as a general rule, he would not. In his view, an architect is the proper person to advise a client as to whether or not a terrace house may be redeveloped. A conveyancing lawyer has limited knowledge of redevelopment requirements and can do no more than say what is in the explanatory notes. Besides, the 7.6 metre minimum width for the buffer zone indicated in the explanatory notes is not fixed and the authorities may change their requirements.
40. The other senior conveyancing lawyer, Ms Judy Loke, who has been practising since July 1968, accepted that in normal circumstances, it would be sufficient for a lawyer to send the client a letter stating that the property is affected by a category 4 road and to enclose with that letter a copy of the road interpretation plan, together with explanatory notes. However, she thought that more might be expected of a lawyer in the present case because of clause 16 of the option, which provided that the plaintiff was fully aware of the road reserve shown on the PWD map provided by the vendor.
41. After receiving the option, the second defendant wrote to the plaintiff to inform her that he had taken note of clause 16 and to add that pending the perusal of the road interpretation plan, he was unable to comment on the road reserve disclosed to her. After receiving a copy of the road interpretation plan, the second defendant informed the plaintiff that the property was affected by category 4 and 5 roads and enclosed the road interpretation plan, together with explanatory notes. Was he required, in the circumstances of the case, to do more when it was clear from the road interpretation plan that the main thing which he had to highlight to the plaintiff was that there was a category 4 road beside the property?
42. The second defendant’s counsel summed up his client’s case by pointing out that the second defendant had discharged his duty by advising or ensuring that the plaintiff obtained a good title to the property and that the replies to relevant requisitions were in order. He was not required by the scope of his duties to advise on whether the property was capable of redevelopment. He thus submitted that the second defendant had sufficiently discharged his duties by sending the plaintiff the letter of 26 March 1997, which brought to the plaintiff’s attention the fact that the property was affected by category 4 and 5 roads and by including a road interpretation plan, together with explanatory notes, with the said letter.
43. The second defendant’s counsel’s approach is not without merit. After all, in Midland Bank v Hett, Stubbs & Kemp [1979] 1 Ch 384, 403, Oliver J. rightly warned that the court must beware of imposing upon solicitors, or upon professional men in other spheres, duties which go beyond the scope of what they are requested and undertake to do. The following observations of his Lordship at p. 403 are certainly helpful for determining the standard of care expected of the second defendant in this case:
It may be that a particularly meticulous and conscientious practitioner would, in his client’s general interests, take it upon himself to pursue a line of inquiry beyond the strict limits comprehended by his instructions. But that is not the test. The test is what the reasonably competent practitioner would do having regard to the standards normally adopted in his profession, and [cases] demonstrate that the duty is directly related to the confines of the retainer.
44. It is thus not surprising that in Hall v Meyrick [1957] 2 QB 455, the English Court of Appeal accepted that it is not a rule that a solicitor who drafts a will for a client is always required to inform the client of the effect of his or her subsequent marriage on the will. Ormerod LJ explained at p. 482:
I have no doubt that it would be the clear duty of a solicitor, on being instructed to prepare a will, to advise his client of the effect of subsequent marriage on the will if, in fact, the client told him that he was intending to get married in the near future, or even, perhaps, if the client’s intention came to the knowledge of the solicitor in a less direct way; but I certainly do not accept the view that it is the duty of a solicitor so to advise merely because the question of marriage has been casually, and perhaps jocularly, mentioned to the solicitor in an interview, either by a third person, as was the case here, or even by the client himself. Whether the duty would arise on such an occasion would depend, in my judgment, on the actual words used at the time and on the whole of the circumstances in which they were used, including, of course, the previous knowledge of the solicitor of the affairs and intentions of his client.
45. It is not necessary for me to decide whether or not in every case where a terrace house is purchased, the conveyancing lawyer will, if he is unaware that the property is to be redeveloped, have discharged his duty to explain the significance of a category 4 road to the client by sending to the client a letter in terms similar to that sent by the second defendant to the plaintiff on 26 March 1997. All that needs to be said is that in the circumstances of this case, it has not been established that there was negligence on the part of the second defendant which resulted in loss to the plaintiff. As such, the plaintiff’s claim against the second defendant is dismissed with costs.
Sgd
TAN LEE MENG
JUDGE
Howard Cashin and Lim Khoon (Lim Hua Yong & Co) for the plaintiff
Salehah Johari (Salehah Johari & Co) for the first defendants
Woo Tchi Chu and Conrad M Campos (Robert WH Wang & Woo) for the second defendant