Lim Bio Hiong Roger v City Developments Ltd
[1999] SGCA 86
CA 67/1999
Chao Hick Tin JA; L P Thean JA; Yong Pung How CJ
16 December 1999
1 (delivering the grounds of decision of the court): This appeal arose out of the decision of Rubin J (`the trial judge`) in which he dismissed the appellant`s claim against the respondent (`CDL`) for damages on account of breach of contract/warranty or misrepresentation as to the size of the `built-in` area of the house which the appellant (`Lim`) had bought from CDL. At the conclusion of the hearing, we dismissed the appeal and we now give our reasons.
2 The facts
3 CDL is a large, public-listed company whose primary business is that of property development. Lim is a computer engineer holding a degree in physics. Up to the time of the trial, he had owned, at one time or another, at least eight properties. His wife was and is a real estate agent and he was and is a director in his wife`s real estate agency.
4 In 1994, CDL was developing a site at Fifth Ave/Sixth Ave, off Bukit Timah Road. It was named `Avenue Villas` (`the project`) and consisted of eight detached houses. At the time, the construction of the project had yet to begin. CDL marketed the project by way of a sales brochure. To enable potential buyers to perceive what they were buying, they were also invited to view miniature models of the houses at its marketing office.
5 On 3 October 1994, Lim viewed the miniature models of the project at CDL`s marketing office. He was handed a copy of the sales brochure, together with a price list which was enclosed therein.
6 On 11 November 1994, Lim decided to purchase the house which was numbered as No 28 Avenue Villas (`the property`). The property was indicated as a `Type A` bungalow in the brochure. He paid a 10% booking fee and was granted an option to purchase the property for $8,648,000. He was given a 5% discount on the listed price. The option identified the property by reference to the brochure. The appellant`s wife acted as broker for the transaction. She received the commission for the same.
7 The floor plan of the property was set out in the brochure and the `built-in` area of each floor was stated in square metres. The total `built-in` area of the property was stated to be 873 sq m. However, in the price list, it was stated that the `built-up` area of the property was 873 sq m; there was no mention of any `built-in` area.
8 Lim subsequently exercised the option by executing a sales and purchase agreement (the `S & P agreement`) on 6 December 1994. The appellant contended that since the brochure was incorporated into the option, the contract would include the term that the `built-in` area of the property would be 873 sq m. This point was not in dispute.
9 The project was completed sometime in early January 1997. On 25 January 1997, Lim took possession of the property. He said he was immediately struck by the smallness of the interior of the house as one of the considerations that made him buy the house was that the `built-in` area was to be 873 sq m. However, he did nothing about that but complained about other things. Sometime later, his conveyancing solicitors engaged an architect (not known who he was) to measure the `built-in` area of the property based on the architect`s plans given to Lim on handing over. Subsequently, he was informed by his solicitors that there was a shortfall of 11% in the built-in area of the property.
10 On 17 April 1997, Lim`s solicitors wrote to CDL`s solicitors, informing them of the shortfall of 11% in the `built-in` area, and also stating that while he would complete the transaction, it was without prejudice to his rights to claim for damages for the same. On 29 May 1997, Lim wrote to CDL and asked for an explanation for the shortfall. On 1 July 1997, CDL`s solicitors replied, enclosing their surveyor`s letter which stated that the `built-up` area of the property was 866.9 sq m.
11 On 10 October 1997, Lim wrote to CDL`s solicitors asking for the joint appointment of a neutral surveyor to determine the exact `built-in` area with a view to entering into a discussion for a solution. On 29 October 1997, the CDL`s solicitors replied stating, inter alia:
Any representation as to the total built-in area made in our clients` brochure is subject to the disclaimer clause in the said brochure ... We are instructed that in practice the terms `built-up` and `built-in` are used interchangeably to denote the area of a building built for exclusive usage and enjoyment of the owner.
12 CDL stated that it could not agree to the proposal for a joint appointment of a surveyor at that stage but asked Lim to furnish the results of the final survey which was then being carried out by his surveyor.
13 Two surveys were commissioned and carried out on behalf of Lim. The first was done sometime in September 1997 by Mr Anthony Lim who reported that the built-in area of the property was only 570.3 sq m, and that included only the floor areas covered by a roof and enclosed by four walls. We ought to add that in fact Lim directed Anthony Lim to measure `built-in` in that manner. The second was by Mr Wang Yu Yang (Wang) of M/s Wang Surveyors. In his report, Wang stated that the `built-in` area of the property was 571.56 sq m. He excluded ancillary areas such as terraces, balconies and patios from the computation of the `built-in` area. At that time, none of those reports were furnished by Lim to CDL.
14 On 20 November 1997, Lim instituted this action to claim for damages on account of the shortfall in the `built-in` area.
15 The decision below
16 In the court below, the trial centred on the issue of the meaning of the term `built-in`. [See [1999] 4 SLR 451.] Lim contended that the phrase `built-in area` referred only to that area built or constructed within four walls, with a roof. It would not include areas such as terraces, patios, verandas and car porch which were not enclosed by four walls and covered with a roof.
17 On the other hand, CDL took the position, inter alia, that:
(a) the phrase `built-in area` meant the same as `built-up area` and both these phrases meant the area of a building built for exclusive usage and enjoyment of the owner; it did not mean only an area enclosed by four walls and covered with a roof;
(b) the terms `built-in` and `built-up` area were used interchangeably to mean the same thing by registered surveyors, architects, developers of land and generally those involved in the real estate industry;
(c) alternatively, the phrase `built-in area` meant an area forming an integral part of the building and/or forming part and parcel of the building; and
(d) alternatively, there was no one clear and accepted definition of the phrase `built-in area`.
18 Expert witnesses were called by both sides. Evidence was also adduced by CDL to show that the term `built-in` first appeared in a mock-up brochure prepared by CDL`s advertising agents, M/s Hagley & Hoyle. The mock-up was sent to its architect, Mr Goh Peng Thong of M/s Alfred Wong & Partnership, for verification. Mr Goh vetted the contents of the mock-up and approved of the use of the phrase `built-in`. The marketing people of CDL also approved the mock-up.
19 In dismissing Lim`s claim, the trial judge found, inter alia, that:
(a) There was no consensus in the property industry as to the meaning of the term `built-in` and the meaning ascribed to that term by Lim was not substantiated by applicable industry practice. The trial judge could see no justification for excluding a patio or a terrace, walled on three sides from the term `built-in`. He found that the industry had been using the two terms `built-in` and `built-up` loosely.
(b) The trial judge could not accept Lim`s assertion that he thought he was going to get a house with an area of 873 sq m of floor area within four walls and covered by a roof. He saw the price list where the reference to 873 sq m was in relation to the `built-up` area. He said he knew there was a difference between `built-in` and `built-up`. Yet he made no enquiries to clarify matters, which he obviously should, when the sales brochure referred to the `built-in` area and the price list the `built-up` area.
20 Appeal
21 Before us, Lim pursued his claim based purely on the ground that CDL had failed contractually to deliver the property with a `built-in` area of 873 sq m. An ancillary issue was whether, if CDL was in breach, it was entitled to rely on a disclaimer in the sales brochure, which reads:
While every reasonable care has been taken in preparing this brochure, the developer and its agents cannot be held responsible for any inaccuracies. All statements are believed to be correct but are not to be regarded as statements or representations of fact. All information and specifications are current at the time of going to print and are subject to change as may be required and cannot form part of an offer or contract. All plans are subject to any amendments approved by the relevant authority. Renderings and illustrations are artist`s impressions only and cannot be regarded as representation of fact. Floor areas are approximate measurements and subject to final survey.
22 In the light of our decision on the main issue, there is, therefore, no necessity for us to consider the effect of this disclaimer clause.
23 Meaning of `built-in area`
24 Central to the claim based on contract is the question of the ordinary and natural meaning of the term `built-in`. Lim complained that the trial judge did not make a finding as to the exact meaning of that term. But it must be borne in mind that the case put forward by Lim was that `built-in` only included those areas of the property which fell within four walls, with a roof over them. This was how Lim`s counsel put the issue in his opening address at the trial:
And only if your Honour agrees with our interpretation of the words `built-in` do we then move to the following issues ... So indeed I acknowledge at the very outset, if your Honour is not with me on the meaning of `built-in`, then my whole case obviously fails.
25 The trial judge was asked to determine if the meaning advanced by Lim was correct. To that question the trial judge found against Lim. He said (at [para ] 55 of his judgment):
However, having carefully considered all the opinions expressed, I am not persuaded that the definition put forward on behalf of the plaintiff (ie the appellant) is a sustainable one and in my view, it appears flawed. I find no justification for excluding a patio or terrace, walled on three sides but with some unenclosed arches in front, from the definition of built-in area. Similarly, there is also no justification to exclude a balcony entirely roofed, having full walls on the sides and back and partially or fully open on front.
26 We would point out that even in the `appellant`s case` submitted for this appeal, Lim maintained his position that CDL was `obliged to contract and deliver a house with an enclosed and covered area of 873 sq m`.
27 Having regard to the nature of Lim`s case as pleaded, there was no necessity for the learned judge to go further and define precisely what the phrase `built-in` meant. He found on the evidence that the case put forward by Lim was not made out. Without giving a definition, he also found that `built-in` would include areas such as patio, terrace or balcony.
28 Expert evidence
29 At this juncture it is necessary for us to touch briefly on an argument which we thought should not have been advanced by Lim in this appeal, which is, that the trial judge erred in taking into account the evidence of the experts called by both parties to conclude that there was no precise meaning as to the term `built-in`. Lim contended that as the terms `built-in` and `built-up` were not terms of art or science, the opinions of experts were not relevant and were inadmissible. His counsel further contended that the trial judge ought to have determined the meaning of the term `built-in` by applying the well established canons of construction.
30 We must point out that this argument was a complete volte-face of the position taken by the appellant at the trial where he himself had called altogether four experts to testify on his behalf. In fact, shortly before the trial commenced, he applied for leave to admit the evidence of two further expert witnesses and to justify this move, he stated in his affidavit filed in support that `there is no doubt that the evidence of the experts is highly relevant to the fair and just adjudication of this action.` It was apparent to us that Lim took this position now because the evidence of the experts did not favour him.
31 We did not think that Lim should be allowed to approbate and reprobate. Having asked the court below to take a certain course, which the court did, Lim could not be heard to argue that the trial judge was wrong in doing so. This would be similar to appealing against a ruling to which that party had consented and this would not be permissible: see s 34(1)(d) of the Supreme Court of Judicature Act (Cap 322). In any event, in our opinion, in this case, expert evidence was very relevant in relation to the construction of the term `built-in`. Such evidence would assist the court in understanding its usage in the property industry. We will elaborate on this below.
32 Question of construction
33 In Pacific Century Regional Developments Ltd v Estate of Seow Khoon Seng [1997] 3 SLR 761 this court had the occasion to lay down the rules governing the construction of documents and it was stated (at p 766 [para ] 17):
The law on the construction of documents is clear. In the case of a contract, such as the agreement in question which is wholly in writing, the court is required to ascertain the mutual intention of the parties as expressed in the words of the agreement. The law is concerned with the objective appearance, rather than with the actual fact, of agreement. It is not concerned with the actual intentions of the parties, rather it is the court`s task to decide what each party was reasonably entitled to conclude from the conduct of the other. In Reardon Smith Line v Hansen-Tangen [1976] 1 WLR 989 at p 996, Lord Wilberforce said:
`When one speaks of the intention of the parties to the contract, one is speaking objectively - the parties cannot themselves give direct evidence of what their intention was - and what must be ascertained is what is to be taken as the intention which reasonable people would have had if placed in the situation of the parties.`
34 We accepted Lim`s contention that the intention of the parties to a contract must be ascertained from the language they have used, considered in the light of the object of the contract and the surrounding circumstances. It is the intention of a reasonable person similarly placed, not the actual intention of the parties, which the court has to determine. Words should be construed in their ordinary and natural meaning unless the context otherwise required.
35 The Oxford English Dictionary (2nd Ed) defines the term `built-in` to mean `(a) constructed to form an integral part of a larger unit, especially of the fittings or appurtenances of a house (b) fig inherent, integral, innate`. The appellant, instead of tendering to court what is the ordinary and natural meaning of the term `built-in`, sought to define that term by a two-step process. First, he submitted on what is the meaning of the word `in`. Here he relied upon the Shorter Oxford English Dictionary where the word `in` is defined to mean `internal or within the limits or bounds of within (any place or thing).` Secondly, deducing therefrom, he submitted that the term `built-in` must mean the internal or enclosed area of a house.
36 We did not think the approach adopted by Lim to obtain the ordinary and natural meaning of the term `built-in` is acceptable in the face of a meaning of that term which is provided in the Oxford English Dictionary. The meaning given in the Oxford English Dictionary of something `constructed to form an integral part of a larger unit` does not support Lim`s contention. From the dictionary meaning, it follows that ancillary areas could be considered to be `built-in` if they constituted an integral part of the main structure. This would have sufficed to dismiss Lim`s claim based on contract as advanced by him.
37 On our part, while we would not attempt to give an exhaustive definition of the term `built-in`, we would endorse what was stated by TQ Lim JC in Chong Sze Pak v Har Meng Woo [1998] 1 SLR 472 that the term `built-in` referred to `the area of the horizontal plane over a structure including anything that forms an integral part of it.` Of course, this may be modified by the parties.
38 Furthermore, we would say that there was another aspect in the brochure which would have given any reasonable buyer an idea of what the developer had in mind in the term `built-in`. In the brochure, the phrase `built-in area` was used in connection with the floor plans of the basement, first storey and second storey. It was placed right next to the plan of each level. The floor plans show the internal areas enclosed by four walls as well as the external areas, eg the patio on the basement level, the patio and entry porch on the first storey and the garden terrace and balcony on the second storey. A reasonable buyer looking at the plans, together with the figures given as the total dimension of each level, would have most likely formed the view that the patios, entry porch, garden terrace and balcony were included in the computation for `built-in`.
39 That is not all. We are here talking of a term, although an ordinary English term, which is used in Singapore. We had to determine what a reasonable Singapore buyer would understand that term to mean in all the circumstances of this case. It is in this regard that the evidence of the experts called by both parties would be relevant. It was to show how the two terms were being used in the market place, as that would obviously have a bearing on how a reasonable buyer would have understood the two terms. It was in the light of all the evidence adduced before him that the trial judge came to the view that in the market place, the two terms had been used interchangeably, and that there was no precise meaning of the term `built-in` in the industry, though he felt it would include the patio, car porch and balcony. The brochures of other real property developers which were tendered at the trial showed that `built-in` meant more than just the areas within four walls and covered by a roof. The brochures and price lists of several of CDL`s developments launched between 1988 and 1995, further evidenced that CDL had in those cases used `built-in` to include areas such as the utility area, yard, balcony, terrace and car porch.
40 Much had been made of the fact that in relation to the Clementi Park development launched by CDL in the early seventies, it had used the term `built-in` to mean only those covered areas within four walls. That was one instance. But the evidence of CDL`s experts was clear: that the two terms were often used interchangeably and understood by people in the industry to mean the same thing and that `built-in` would include all those parts which were integral to the house. The building authority of Singapore, the Urban Redevelopment Authority, had also used the two terms in similar fashion. Even all the four experts called by the appellant accepted that there was no common definition of `built-in` and `built-up` and two of them agreed that the two terms were used loosely and interchangeably.
41 In the light of the way the market had been using the two terms, any reasonable buyer on seeing the term `built-in` as presented in the brochure here would not have taken it to mean that it referred only to the areas enclosed within four walls with a roof.
42 Counsel for Lim had relied on the case Ng Buay Hock v Tan Keng Huat [1997] 2 SLR 788 to support his contention. It is important to note, however, that that case involved an oral representation by the owner`s agent who, upon being specifically asked if the roof garden was included in the figure given for built-in area, told the buyer that it did not, as the roof garden was not enclosed within walls. The expert called by the vendor said that the built-in area enclosed within four walls was 1,851 sq ft and the built-up was 2,507, which included the car porch and the roof garden. The vendor`s expert evidence in fact supported the purchaser`s stand. It was in the light of this evidence that the court found the vendors liable for misrepresentation.
43 Claim was an afterthought
44 Furthermore, it should be borne in mind that the appellant was, even at that time, not a novice in the purchase of landed properties. As mentioned above, his wife was then an estate agent and he himself was a director of her agency. He had purchased many other properties before. He must have known the flexible manner in which the industry had been using the two terms. He saw the reference to `built-in` in the brochure. He admitted having seen the term `built-up`, which was in bold print in the price list. If, as Lim claimed, he knew there was a difference between the two terms, why didn`t he seek clarification? The fact that he did not, demonstrated that he must have known, contrary to what he claimed, that the two terms were in practice treated very much the same.
45 In our judgment, there was some basis for the trial judge to think that the appellant`s delay until 17 April 1997 in bringing up the matter showed that it was an afterthought. The trial judge felt that the judgment delivered on 13 March 1997 by the High Court in Ng Buay Hock had something to do with it. That was not an unfair inference. Furthermore, Lim`s initial complaint was that there was a shortfall of 11%, as the `built-in` area was only 781.41 sq m. This computation of 781.41 sq m would have included the patio, garden terrace, balcony and entry porch as `built-in` areas. If, in his mind these should have been excluded, why did he allow his solicitors to allege that there was a shortfall of only 11%? In his letter of 29 May 1997 to CDL, Lim repeated the complaint of a shortfall of 11%. It seemed to us that it must have been after further reflection on the matter that he felt those areas should also be excluded.
46 Description of space in the sales brochure
47 The appellant had also argued that in determining the meaning of the term `built-in`, the court should also take into account the manner in which CDL had described the property in the brochure. He pointed out in particular the following expressions which CDL used to tout the property - `spacious living room`; `all interior spaces are simply grand`; `the living areas are expansive without being cavernous`; `substantially generous proportions to allow for spacious private areas` and `sheer space`. A reasonable person reading though these in the brochure would have undoubtedly formed the view that the interior or the internal areas of the house were its main selling point. While the `built-in` area of each floor was given in the brochure, no breakdown was given as to those parts that fell within the four walls of the house and those that did not. Thus, a reasonable prospective purchaser would think that the total of 873 sq m related wholly to the parts within the four walls.
48 We have two observations on this argument. First, we had perused the entire brochure and it was not obvious that the internal space was the main selling point. It seemed to have touted all major aspects of the property which a potential buyer would be interested to know: its elevated site; its convenient and exclusive location; the desirable environment and the view it commanded; its special colonial design which took into account the land contour; and the privacy it provided. It also described the various features of the house. We did not think that any reasonable buyer reading through the brochure would necessarily be left with the impression that the main selling point was the internal enclosed spaces. In any event, even if a reasonable purchaser would have formed that view, 570 sq m of internal area which is equivalent to about 6,120 sq ft is a large area even for a modern luxury bungalow. Second, a reasonable purchaser would have perused the price list and would have noticed that the 873 sq m referred to the `built-up` area. That would have put the purchaser on notice that the vendor was using the two terms `built-in` and `built-up` interchangeably. We could not imagine any buyer not paying attention to the price list, which was given together with the brochure, or what was written thereon, as that must be a document at least as important as, if not more so than, the brochure. We had noted that the trial judge did not accept the appellant`s assertion that he did not pay any attention to the price list.
49 Judgment
50 For the above reasons, we dismissed the appeal with costs. The security for costs was ordered to be paid out to the solicitors for CDL to account of the latter`s costs.
51 Outcome:
52 Appeal dismissed.
Chao Hick Tin JA L P Thean JA Yong Pung How CJ |
Davinder Singh SC and Tan Cheng Yew (Tan Cheng Yew & Partners) for the appellant
K Shanmugam SC and Muralidharan Pillai (Allen & Gledhill) for the respondents